2025-12-19 10.8.118.215
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
GB/T 21699-2008 Verification/calibration method of rotating-element current meters in straight open tank 240.0 via email in 1~3 business day valid,,2008-7-1
GB/T 3408.1-2008 Instrument for dam monitoring - Strain meter - Part 1: Unbonded elastic wire resistance strain meter 190.0 via email in 1~3 business day valid,,2008-5-1
GB 17378.7-2007 The specification for marine monitoring—Part 7:Ecological survey for offshore pollution and biological monitoring 2000.0 via email in 1~5 business day valid,,2008-5-1
GB/T 3410.1-2008 Instrument for dam monitoring joint meter - Part 1: Unbonded elastic wire resistance joint meter 190.0 via email in 1~3 business day valid,,2008-5-1
GB 17378.3-2007 The specification for marine monitoring—Part 3:Sample collection storage and transportation 400.0 via email in 1~3 business day valid,,2008-5-1
GB/T 21440.1-2008 Instrument for dam monitoring—Settlement gauge—Part 1:Hydraulic overflow settlement gauge 164.0 via email in 1~3 business day valid,,2008-5-1
GB 17378.4-2007 The specification for marine monitoring—Part 4:Seawater analysis 2430.0 via email in 1 business day valid,,2008-5-1
GB 17378.6-2007 The specification for marine monitoring—Part 6:Organism analysis 1400.0 via email in 1~3 business day valid,,2008-5-1
GB 17378.2-2007 The specification for marine monitoring—Part 2:Data processing and quality control of analysis 700.0 via email in 1~3 business day valid,,2008-5-1
GB 17378.5-2007 The specification for marine monitoring—Part 5:Sediment analysis 2000.0 via email in 1~5 business day valid,,2008-5-1
DB32/T 1199-2008 Meteorological Disaster - Definition and Classification via email in business day abolished2025-08-25 ,,2008-4-28
HY/T 103-2008 Hollow fiber microfiltration membrane equipment 120.0 via email in 1~3 business day valid,,2008-4-1
HY/T 108-2008 Energy recovery device in reverse osmosis 150.0 via email in 1~3 business day valid,,2008-4-1
HY/T 109-2008 Technical specifications for high - Pressure pump in reverse osmosis plant 150.0 via email in 1~3 business day valid,,2008-4-1
HY/T 113-2008 Membrane and element of nanofiltration 150.0 via email in 1~3 business day valid,,2008-4-1
HY/T 107-2008 Standard test method for characteristics of the spiral wound reverses osmosis membrane 180.0 via email in 1~3 business day superseded2017-11-01,2017-11-1,2008-4-1
HY/T 115-2008 Seawater desalination engineering design for distillation 180.0 via email in 1~3 business day valid,,2008-4-1
MH/T 4016.5-2008 Civil aviation meteorology-part 5:equipment technical requirement 300.0 via email in 1~3 business day abolished2017-01-13 ,,2008-4-1
HY/T 112-2008 Membrane and module of ultrafiltration 214.0 via email in 1 business day valid,,2008-4-1
HY/T 106-2008 General specifications for multi-effect distillation seawater desalination equipment 180.0 via email in 1~3 business day valid,,2008-4-1
Previous Page     Next Page



Code of China
Search

GB/T 21699-2008 Verification/calibration method of rotating-element current meters in straight open tank 
  Issued on: 2008-04-09   Price(USD): 240.0
GB/T 3408.1-2008 Instrument for dam monitoring - Strain meter - Part 1: Unbonded elastic wire resistance strain meter 
  Issued on: 2008-2-15   Price(USD): 190.0
GB 17378.7-2007 The specification for marine monitoring—Part 7:Ecological survey for offshore pollution and biological monitoring 
  Issued on: 1998-6-22   Price(USD): 2000.0
GB/T 3410.1-2008 Instrument for dam monitoring joint meter - Part 1: Unbonded elastic wire resistance joint meter 
  Issued on: 2008-2-15   Price(USD): 190.0
GB 17378.3-2007 The specification for marine monitoring—Part 3:Sample collection storage and transportation 
  Issued on: 1998-6-22   Price(USD): 400.0
GB/T 21440.1-2008 Instrument for dam monitoring—Settlement gauge—Part 1:Hydraulic overflow settlement gauge 
  Issued on: 2008-02-15   Price(USD): 164.0
GB 17378.4-2007 The specification for marine monitoring—Part 4:Seawater analysis 
  Issued on: 1998-6-22   Price(USD): 2430.0
GB 17378.6-2007 The specification for marine monitoring—Part 6:Organism analysis 
  Issued on: 1998-6-22   Price(USD): 1400.0
GB 17378.2-2007 The specification for marine monitoring—Part 2:Data processing and quality control of analysis 
  Issued on: 1998-6-22   Price(USD): 700.0
GB 17378.5-2007 The specification for marine monitoring—Part 5:Sediment analysis 
  Issued on: 1998-6-22   Price(USD): 2000.0
DB32/T 1199-2008 Meteorological Disaster - Definition and Classification 
  Issued on: 2008-01-01   Price(USD):
HY/T 103-2008 Hollow fiber microfiltration membrane equipment 
  Issued on: 2008-03-04   Price(USD): 120.0
HY/T 108-2008 Energy recovery device in reverse osmosis 
  Issued on: 2008-3-31   Price(USD): 150.0
HY/T 109-2008 Technical specifications for high - Pressure pump in reverse osmosis plant 
  Issued on: 2008-3-31   Price(USD): 150.0
HY/T 113-2008 Membrane and element of nanofiltration 
  Issued on: 2008-3-31   Price(USD): 150.0
HY/T 107-2008 Standard test method for characteristics of the spiral wound reverses osmosis membrane 
  Issued on: 2008-03-31   Price(USD): 180.0
HY/T 115-2008 Seawater desalination engineering design for distillation 
  Issued on: 2008-03-31   Price(USD): 180.0
MH/T 4016.5-2008 Civil aviation meteorology-part 5:equipment technical requirement  
  Issued on: 2008-1-29   Price(USD): 300.0
HY/T 112-2008 Membrane and module of ultrafiltration 
  Issued on: 2008-3-31   Price(USD): 214.0
HY/T 106-2008 General specifications for multi-effect distillation seawater desalination equipment 
  Issued on: 2008-03-31   Price(USD): 180.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040