![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
GB/T 47505-2026 Habitability assessment methodology for emergency facility of nuclear power plants
Issued on: 2026-04-30 Price(USD): 435.0 |
|
GB/T 15473-2025 Qualification of class 1E static battery chargers, inverters, and uninterruptible power supply systems for nuclear power plants
Issued on: 2025-8-1 Price(USD): 540.0 |
|
GB/T 14546-2025 Practice for the design of DC auxiliary power system for nuclear power plants
Issued on: 2025-8-1 Price(USD): 510.0 |
|
GB/T 9224-2025 DC periodmeters
Issued on: 2025-8-1 Price(USD): 270.0 |
|
GB/T 13284-2025 Design criteria of safety systems in nuclear power plants
Issued on: 2025-04-25 Price(USD): 435.0 |
|
GB/T 12789.3-2025 Criteria for nuclear reactor instrumentation—Part 3:High temperature gas-cooled reactor
Issued on: 2025-04-25 Price(USD): 210.0 |
|
GB/T 46694-2025 Primary coolant system source terms analysis and control criteria for pressurized water reactor nuclear power plants
Issued on: 2025-10-31 Price(USD): 270.0 |
|
GB/T 46375-2025 Operational nuclear power plant core metadata
Issued on: 2025-10-31 Price(USD): 825.0 |
|
GB/T 5962-2025 NIM standard instrumentation system—Mechanical dimensions; power supply and electrical signal requirements
Issued on: 2025-10-05 Price(USD): 495.0 |
|
GB/T 4079-2025 Test procedures for amplifiers and charge-sensitive preamplifiers used with detectors of ionizing radiation
Issued on: 2025-10-05 Price(USD): 330.0 |
|
T/SDHS 2-2025 Guideline for Ultrasonic Testing in Condition Monitoring of Nuclear Power Plant Equipment
Issued on: 2025-06-20 Price(USD): |
|
T/SDHS 1-2025 Inspection and Maintenance Specifications for Lead - acid Batteries in AP/CAP Nuclear Power Plants
Issued on: 2025-06-20 Price(USD): |
|
T/SDHS 3-2025 Guidelines for the supervision and management of the whole process of commissioning of nuclear power plant operators
Issued on: 2025-06-20 Price(USD): |
|
GB/T 16702.7-2025 Design specification for mechanical components in nuclear island of pressurized water reactor nuclear power plants―Part 7:Supports
Issued on: 2025-02-28 Price(USD): 930.0 |
|
GB/T 43797-2024 General requirements of operating licenses extension assessment for nuclear power plants
Issued on: 2024-3-15 Price(USD): 165.0 |
|
NB/T 20712-2023 Guidelines for zinc addition in primary coolant of pressurized water reactors
Issued on: 2023-12-28 Price(USD): 255.0 |
|
NB/T 20711-2023 Commissioning technical guidelines for the reactor cavity and spent fuel pit cooling and treatment system of PWR nuclear power plant
Issued on: 2023-12-28 Price(USD): 105.0 |
|
NB/T 20512.4-2023 Operating licenses extension of nuclear power plants一Part 4: Ageing managementreview for structures and structural components
Issued on: 2023-12-28 Price(USD): 285.0 |
|
NB/T 20512.3-2023 Operating licenses extension for nuclear power plants一Part 3: Aging managementreview for electrical and instrumentation and control components
Issued on: 2023-12-28 Price(USD): 270.0 |
|
NB/T 20512.2-2023 Operating licenses extension of nuclear power plants - Part 2: Agingmanagement revi ew for mechanical components
Issued on: 2023-12-28 Price(USD): 255.0 |
|
Contact us via WeChat
| ||
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 3680948734 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||