2025-12-19 10.8.118.215
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
GB/T 44296-2024 Reciprocating internal combustion gas generating sets—Calculating methods of power correction, power adjustment and recalculating specific fuel consumption 600.0 via email in 1~5 business day valid,,2025-3-1
GB/T 44080-2024 Management specification of reliability, availability, maintainability and safety (RAMS) for nuclear power plants 750.0 via email in 1~5 business day valid,,2024-5-28
GB/T 43797-2024 General requirements of operating licenses extension assessment for nuclear power plants 165.0 via email in 1~3 business day valid,,2024-7-1
NB/T 20238-2023 Nuclear power plant radiation monitoring system installation technical regulation 135.0 via email in 1~3 business day valid,,2024-6-28
NB/T 20173-2023 Technical regulations for construction and test of polar crane at PWR reactor building 195.0 via email in 1~3 business day valid,,2024-6-28
NB/T 20129-2023 General technical regulation for installation||test and acceptance of emergency diesel generator of nuclear island in pressurized water reactor nuclear power plants 345.0 via email in 1~5 business day valid,,2024-4-11
NB/T 20663-2023 Technical Specification for Installation of Ventilation System of PWR Nuclear Power Plant Nuclear Island 285.0 via email in 1~3 business day valid,,2023-11-26
T/CNS 22-2020 Radiation protection design criteria for high temperature gas cooled reactor nuclear power plant 165.0 via email in 1~3 business day valid,,
GB/T 41584-2022 Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants 165.0 via email in 1~3 business day valid,,2023-2-1
GB/T 41587-2022 Requirements for cold performance test before initial fuel loading of pressurized water reactor nuclear power plants 165.0 via email in 1~3 business day valid,,2023-2-1
GB/T 41585-2022 Specification of draw-up commissioning program for pressurized water reactor nuclear power plants 375.0 via email in 1~5 business day valid,,2023-2-1
GB/T 41591-2022 Initial criticality tests for pressurized water reactor of nuclear power plants 165.0 via email in 1~3 business day valid,,2023-2-1
GB/T 41576-2022 Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants 165.0 via email in 1~3 business day valid,,2023-2-1
T/CNEA 009-2021 Guidelines of production preparation for nuclear power plants 630.0 via email in 1~5 business day valid,,
T/CNS 33-2020 Design criteria for main steam and feed water system of high temperature gas cooled reactor nuclear power plant 225.0 via email in 1~3 business day valid,,
T/CNS 28-2020 Nuclear design criteria for high temperature gas cooled reactor nuclear power plant 105.0 via email in 1~3 business day valid,,
T/CNS 23-2020 Categorization of plant states of high temperature gas cooled reactor nuclear power plant 165.0 via email in 1~3 business day valid,,
T/CNS 31-2020 Design criteria for fuel handling system of high temperature gas cooled reactor nuclear power plant 105.0 via email in 1~3 business day valid,,
T/CNS 25-2020 Design criteria for control rod drive mechanism of high temperature gas cooled reactor nuclear power plant 165.0 via email in 1~3 business day valid,,
T/CNS 46-2020 Design criteria for the helium circulator of high temperature gascooled reactor nuclear power plant 105.0 via email in 1~3 business day valid,,
Previous Page     Next Page



Code of China
Search

GB/T 44296-2024 Reciprocating internal combustion gas generating sets—Calculating methods of power correction, power adjustment and recalculating specific fuel consumption 
  Issued on: 2024-8-23   Price(USD): 600.0
GB/T 44080-2024 Management specification of reliability, availability, maintainability and safety (RAMS) for nuclear power plants 
  Issued on: 2024-05-28   Price(USD): 750.0
GB/T 43797-2024 General requirements of operating licenses extension assessment for nuclear power plants 
  Issued on: 2024-3-15   Price(USD): 165.0
NB/T 20238-2023 Nuclear power plant radiation monitoring system installation technical regulation 
  Issued on: 2023-12-28   Price(USD): 135.0
NB/T 20173-2023 Technical regulations for construction and test of polar crane at PWR reactor building 
  Issued on: 2023-12-28   Price(USD): 195.0
NB/T 20129-2023 General technical regulation for installation||test and acceptance of emergency diesel generator of nuclear island in pressurized water reactor nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 345.0
NB/T 20663-2023 Technical Specification for Installation of Ventilation System of PWR Nuclear Power Plant Nuclear Island 
  Issued on: 2023-5-26   Price(USD): 285.0
T/CNS 22-2020 Radiation protection design criteria for high temperature gas cooled reactor nuclear power plant 
  Issued on: 2022-12-31   Price(USD): 165.0
GB/T 41584-2022 Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants 
  Issued on: 2022-07-11   Price(USD): 165.0
GB/T 41587-2022 Requirements for cold performance test before initial fuel loading of pressurized water reactor nuclear power plants 
  Issued on: 2022-07-11   Price(USD): 165.0
GB/T 41585-2022 Specification of draw-up commissioning program for pressurized water reactor nuclear power plants 
  Issued on: 2022-07-11   Price(USD): 375.0
GB/T 41591-2022 Initial criticality tests for pressurized water reactor of nuclear power plants 
  Issued on: 2022-07-11   Price(USD): 165.0
GB/T 41576-2022 Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants  
  Issued on: 2022-7-11   Price(USD): 165.0
T/CNEA 009-2021 Guidelines of production preparation for nuclear power plants 
  Issued on: 2021-11-23   Price(USD): 630.0
T/CNS 33-2020 Design criteria for main steam and feed water system of high temperature gas cooled reactor nuclear power plant 
  Issued on: 2020-12-31   Price(USD): 225.0
T/CNS 28-2020 Nuclear design criteria for high temperature gas cooled reactor nuclear power plant 
  Issued on:   Price(USD): 105.0
T/CNS 23-2020 Categorization of plant states of high temperature gas cooled reactor nuclear power plant 
  Issued on: 2020-12-31   Price(USD): 165.0
T/CNS 31-2020 Design criteria for fuel handling system of high temperature gas cooled reactor nuclear power plant 
  Issued on:   Price(USD): 105.0
T/CNS 25-2020 Design criteria for control rod drive mechanism of high temperature gas cooled reactor nuclear power plant 
  Issued on: 2020-12-31   Price(USD): 165.0
T/CNS 46-2020 Design criteria for the helium circulator of high temperature gascooled reactor nuclear power plant 
  Issued on:   Price(USD): 105.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040