Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
07K103-192 |
Selection and installation of building smoke control system design and equipment accessories (bound copy in 2007) |
$3125.00 |
via email in 1~5 business day |
valid,,2008-1-1 |
|
07K103-2 |
|
$1650.00 |
via email in 1~5 business day |
valid,,2008-1-1 |
|
07K104 |
07K104 Selection and installation of dust removal equipment |
$2975.00 |
via email in 1~5 business day |
valid,,2008-7-1 |
|
07K120 |
07K120 Air valve selection and installation |
$1600.00 |
via email in 1~5 business day |
valid,,2007-9-1 |
|
07K133 |
07K133 Fabrication and installation of air duct with sheet steel flange |
$1125.00 |
via email in 1~8 business day |
valid,,2007-4-1 |
|
07K201 |
07K201 Pipeline valve selection and installation |
$1650.00 |
via email in 1~8 business day |
valid,,2009-1-1 |
|
07K203 |
07K203 Design and installation of building air conditioner circulation cooling water system |
$2025.00 |
via email in 1~5 business day |
valid,,2008-3-1 |
|
07K304 |
07K304 Design and installation of air-conditioner room |
$2800.00 |
via email in 1~5 business day |
valid,,2007-11-1 |
|
07K505 |
07K505 Design and installation of clean operating department and medical gas |
$4100.00 |
via email in 1~5 business day |
valid,,2007-8-1 |
|
07K506 |
air conditioner system design, construction and installation |
$1450.00 |
via email in 1~8 business day |
valid,,2009-1-1 |
|
07MR402 |
07MR402 Urban road - assembled retaining wall |
$4125.00 |
via email in 1~5 business day |
valid,,2008-5-1 |
|
07MR403 |
07MR403 Urban road (slope protection) |
$1175.00 |
via email in 1~5 business day |
valid,,2007-10-1 |
|
07MS101 |
Municipal Water Supply Pipeline Engineering and Ancillary Facilities |
$4815.00 |
via email in 1~5 business day |
valid,,2008-1-1 |
|
07MS101-191 |
|
|
via email in business day |
superseded,2013-9-1, |
|
07R202 |
07R202 Design and construction of air conditioner power refrigerator room |
$3075.00 |
via email in 1~5 business day |
valid,,2007-6-1 |
|
07R408 |
|
|
via email in business day |
valid,, |
|
07S207 |
07S207 Gas fire control system selection, installation, and configuration of fire extinguisher for building |
$2525.00 |
via email in 1~5 business day |
valid,,2007-9-1 |
|
07S906 |
07S906 Water supply and drainage structure design selection drawing (pond, water tower, septic tank and small-sized drainage structure) |
$7700.00 |
via email in 1~5 business day |
valid,,2007-6-1 |
|
07SG359-195 |
|
|
via email in business day |
valid,, |
|
07SG518-194 |
Multiple bay portal rigid-frame light-weight buildings steel structure (without crane) |
$4475.00 |
via email in 1~5 business day |
valid,,2007-11-1 |
|
|
|