Code of China Chinese Classification Professional Classification ICS Classification Latest Value-added Service
LoginRegister
GB 19051-2003 Product of designations of origin or geographical indication--Nanfeng orange
Issued on: 2003-03-28   Implemented on: 2003-9-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

SY/T 6548-2003 Specification for use and maintenance of loaded cable and bridle in oil field
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 180.0 Delivery: via email in 1~3 business day

SY/T 6562-2003 The safety code of recovering light hydrocarbon
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 60.0 Delivery: via email in 1~3 business day

HJ/T 103-2003 The technical reqirement for water quality automatic ananlyzer of total phosphorous
Issued on: 2003-03-28   Implemented on: 2003-7-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

JB/T 4750-2003 Pressure vessels for refrigerant equipment
Issued on: 2003-03-17   Implemented on: 2003-7-1 Price(USD): 1020.0 Delivery: via email in 1~10 business day

TB/T 1393-2003 Railway applications-Electric equipment for Rolling stock-Rules for power resistors of open construction
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 530.0 Delivery: via email in 1~3 business day

SN/T 1181.2-2003 Detectoin antibodies against foot and mouth disease virus--Protocol of micro-serum neutralization test
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

SY/T 5211-2003 Fracturing unit
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 1320.0 Delivery: via email in business day

JGJ 61-2003 Technical specification for latticed shells
Issued on: 2003-03-21   Implemented on: 2003-8-1 Price(USD): 300.0 Delivery: via email in 1 business day

TB/T 3064.1-2003 Track dynamic stabilizer Part 1: The whole machine performance
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

GB/T 8021-2003 Petroleum products-Determination of saponification number
Issued on: 2003-03-02   Implemented on: 2003-9-1 Price(USD): 140.0 Delivery: via email in 1 business day

SN/T 1200-2003 Protocol of qualitative PCR for the detection of genetically modified components in tobacco
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

GB/T 18993.1-2003 Chlorinated poly(vinyl chloride)piping system for hot and cold water installations--Part 1:General
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

GB/T 18993.3-2003 Chlorinated poly(vinyl chloride)piping systems for hot and cold water installations—Part 3:Fittings
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

SY/T 6576-2003 Recommended practices for evaluation of polymers used in enhanced oil recovery
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 1230.0 Delivery: via email in 1~10 business day

GB/T 18990.1-2003 Luteinizing hormone(LH) test strip--Part 1:Ovulation test strip
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 300.0 Delivery: via email in 1~3 business day

SN/T 1181.3-2003 Protocol of probang test for foot and mouth disease virus
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

GB/T 18990.2-2003 Luteinizing hormone(LH) test strip--Prt 2:Sterility test strip
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

TB/T 1906.1-2003 Railway freight cars atmospheric corrosion resisting cold formed steel sections
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

TB/T 3075-2003 Railway applications-Rolling stock equipment-Capacitors for power electronics
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 940.0 Delivery: via email in 1~5 business day

SY/T 5513-2003 Technical specifications for 3D land seismic exploration data processing
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 300.0 Delivery: via email in 1~3 business day

SY/T 0076-2003 Design specification of natural gas dehydration
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 615.0 Delivery: via email in 1~8 business day

HJ/T 102-2003 The technical requirement for water quality automatic ananlyzer of total nitrogen
Issued on: 2003-03-28   Implemented on: 2003-7-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

SY/T 6578-2003 Lab test method for the drag reduction performance of drag-reducing agent which applied in oil pipeline transportation
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

TB/T 2033-2003 General technical specification for rail flat car
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 180.0 Delivery: via email in 1~3 business day

TB 10401.1-2003 Code for technique on construction safety of railway engineering(Volume One)
Issued on: 2003-03-28   Implemented on: 2003-6-1 Price(USD): 1600.0 Delivery: via email in 1~10 business day

YB/T 4116-2003 Magnesia-calcia bricks
Issued on: 2003-03-18   Implemented on: 2003-6-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SN/T 1178-2003 Plant quarantine -- Methods for inspection and identification on colorado potato beetle
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

SN/T 1207-2003 Protocol of isolation and culture of brachyspira hyodysenteriae for swine dysentery
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 244.0 Delivery: via email in 1~3 business day

SY/T 0077-2003 Design specification of natural gas liquid recover
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 630.0 Delivery: via email in 1~8 business day

SY/T 6554-2003 Procedures for welding or hot tapping on equipment in service
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

GB 19049-2003 Product of designations of origin or geographical indication--Changli wine
Issued on: 2003-03-28   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SY/T 6563-2003 Regulation for use and management of dangerous chemical reagent
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 60.0 Delivery: via email in 1~3 business day

GB/T 17680.8-2003 Criteria or emergency planning and preparedness for nuclear power plants--On-site emergency planning and implementing procedures
Issued on: 2003-03-24   Implemented on: 2003-12-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

JJG 977-2003 Verification Regulation of Timing and Charging Device for IC Card Public Telephone
Issued on: 2003-03-05   Implemented on: 2003-6-1 Price(USD): 180.0 Delivery: via email in 1~3 business day

HJ/T 96-2003 The technical requirement for water quality automatic analyzer of PH
Issued on: 2003-03-28   Implemented on: 2003-7-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

SY/T 6106-2003 Technical requirement for preparing of development plan for gas reservoir
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 450.0 Delivery: via email in 1~3 business day

GB/T 18981-2003 Fastener
Issued on: 2003-03-03   Implemented on: 2003-8-1 Price(USD): 255.0 Delivery: via email in 1~3 business day

SY/T 6564-2003 The safety rules for tying utensils during offshore petroleum operations
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

GB 19050-2003 Product of designations of origin or geographical indication--Gaoyou duck salted eggs
Issued on: 2003-03-28   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

SY/T 6150.1-2003 Technical standard of tapping & plugging on steel pipeline -- Part 1: Plug & cylinder stopple
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 270.0 Delivery: via email in 1~3 business day

YB/T 4118-2003 Purging plug and seat block for refining ladles
Issued on: 2003-03-18   Implemented on: 2003-6-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SY/T 6577.1-2003 Transportation of line pipe Part 1: Transportation on railroad
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 225.0 Delivery: via email in 1~3 business day

GA 419-2003 The cyanoacrylate fuming cabinet for fingerprint development
Issued on: 2003-03-07   Implemented on: 2003-7-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SN/T 1164.2-2003 Protocol of micro-serum neutralization test for infectious bovine rhinotracheitis
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 284.0 Delivery: via email in 1~3 business day

YB/T 4117-2003 Test method for explosion resistance of dense refractory castables
Issued on: 2003-03-18   Implemented on: 2003-6-1 Price(USD): 40.0 Delivery: via email in 1 business day

SN/T 1195-2003 Protocol of the qualitative polymerase chain reaction (PCR) for detecting genetically modified component in soybeans
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

SY/T 6009.4-2003 Test method of samples of geochemical exploration for oil and gas Part 4: Determination of thermal released hydrocarbons Gas chromatography
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

TB/T 1999-2003 Drawing and design document of product -- General principles
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 225.0 Delivery: via email in 1~3 business day

SY/T 5481-2003 Technical specification of seismic interpretation
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 390.0 Delivery: via email in 1~5 business day

TB/T 1358-2003 Wheel contour guage for locomotive and car
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

GB/T 18992.1-2003 Crosslined polyethylene(PE-X)piping systems for hot and cold water installatins--Part 1:General
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

SL 282-2003 Design specification for concrete arch dams
Issued on: 2003-03-09   Implemented on: 2003-6-1 Price(USD): 720.0 Delivery: via email in 1~10 business day

SY/T 6549-2003 Operating regulation of perf-HEGF
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

SN/T 1189-2003 Sanitary treatment codes for entry-exit trains contaminated with cholera
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

SY/T 6582.3-2003 The Calibration for petroleum nuclear logging tool - Part 3: The calibration for compensated density/litho-density tool
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 40.0 Delivery: via email in 1 business day

GB/T 17127.4-2003 Agricultural wheeled tractors and implements—Three-point hitch couplers—Part 4:Bar coupler
Issued on: 2003-03-01   Implemented on: 2003-8-1 Price(USD): 75.0 Delivery: via email in 1~3 business day

SY/T 6552-2003 Recommended practice for inspection of pressure vessels in service for petroleum industry
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 555.0 Delivery: via email in 1~5 business day

SY/T 6541-2003 Environmental test and reliability for geophysical exploration instrument
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

GB/T 19047-2003 Reinforced truck tyres
Issued on: 2003-03-28   Implemented on: 2003-6-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

JGJ 113-2003 Technical Specification for Application of Architectural Glass
Issued on: 2003-03-28   Implemented on: 2003-8-1 Price(USD): 220.0 Delivery: via email in 1 business day

SY/T 6543.2-2003 Specification for underbalanced drilling technology-Part 2: The outfit requirements of the wellhead pressure control and surface equipment
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 255.0 Delivery: via email in 1~3 business day

SY/T 6156-2003 Technical specification of airgun source
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SN/T 1181.1-2003 Detection antibodies against foot and mouth disease virus infection-associated antigen-Protocol agar gel immuno-diffusion test
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

GB/T 18990.3-2003 Luteinizing hormone(LH) test strip Part 3:Contraceptive test strip
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 300.0 Delivery: via email in 1~3 business day

SY/T 6582.2-2003 The calibration for petroleum nuclear logging tool Part 2: The calibration for natural gamma-ray logging tool
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 180.0 Delivery: via email in 1~3 business day

TB/T 2803-2003 Technical specification of circuit-breaker for AC electrification railway
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 225.0 Delivery: via email in 1~3 business day

TB/T 1979-2003 Technical specification for the procurement of atmospheric corrosion resisting steel for railway rolling stock
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

JJG 978-2003 High Precision Mercury-in-Glass Thermometers for Used Petroleum
Issued on: 2003-03-05   Implemented on: 2003-6-1 Price(USD): 570.0 Delivery: via email in 1~3 business day

TB/T 3067-2003 Flange connectors for brake assembly of locomotive and car
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

GB/T 18994-2003 Gases for electronic industry—High purity chlorine
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SY/T 5171-2003 Specification for surveying in petroleum geophysical exploration
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 915.0 Delivery: via email in 1~10 business day

GB/T 19410-2003 Screw refigerant compressort
Issued on: 2003-03-15   Implemented on: 2004-6-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

SN/T 1171.1-2003 Detection of antibodies against caprine arthritis--encephalitis virus--Protocol of enzyme-linked immunosorbent assay
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SN/T 1186-2003 Rules for quarantine inspection of entry-exit trains
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

JJG 332-2003 Verification Regulation of Gear Involute Masters
Issued on: 2003-03-05   Implemented on: 2003-9-5 Price(USD): 330.0 Delivery: via email in 1~5 business day

TB/T 3076-2003 Railway applications-Rolling stock Protective provisions against electrical hazards
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 570.0 Delivery: via email in 1~3 business day

TB/T 449-2003 Wheel profile for locomotive and car
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

GB/T 10574.13-2003 Methods for chemical analysis of tin-lead solders-determination of copper,iron cadmium,silver,gold,arsenic,zinc,aluminium,bismuth,phosphorous content
Issued on: 2003-03-11   Implemented on: 2003-8-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

SY/T 6583-2003 Rules for working out the report of proved oil and gas reserves
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 690.0 Delivery: via email in 1~3 business day

GA 420-2003 Anti-riot suit
Issued on: 2003-03-21   Implemented on: 2003-9-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

GB/T 17680.7-2003 Criteria for emergency planning and preparedness for nuclear power plants--Function and physical characteristics for on-site emergency facilities
Issued on: 2003-03-02   Implemented on: 2003-12-1 Price(USD): 210.0 Delivery: via email in 1~3 business day

SN/T 1213-2003 Codes for deratting of entry-exit trains
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

GB/T 7305-2003 Standard test method for water separability of petroleum oils and synthetic fluids
Issued on: 2003-03-28   Implemented on: 2003-9-1 Price(USD): 60.0 Delivery: via email in 1 business day

JJG 414-2003 Optical Theodolites
Issued on: 2003-03-05   Implemented on: 2003-9-1 Price(USD): 390.0 Delivery: via email in 1~5 business day

GB/T 18996-2003 Determination of silver in silver jewellery alloys--Volumertic (potentiometric) method using sodium chloride or potassium chloride
Issued on: 2003-03-07   Implemented on: 2003-10-1 Price(USD): 75.0 Delivery: via email in 1~3 business day

SH/T 0725-2002 Standard test method for carbon-type composition of insulating oils of petroleum origin
Issued on: 2003-03-18   Implemented on: 2003-5-1 Price(USD): 210.0 Delivery: via email in 1~3 business day

TB/T 1906.3-2003 Railway freight car’s atmospheric corrosio res ist in gc old formeds teels ections Part3 : End cros sband
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SN/T 1202-2003 Protocol of the qualitative polymerase chain reaction for detecting genetically modified plant components in food
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

GB/T 8478-2003 Aluminium doors
Issued on: 2003-03-01   Implemented on: 2003-9-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

TB/T 1906.2-2003 Railway freight car’s atmospheric corrosion resisting cold formed steel section Part,2:Side post of open-top wagon
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

GB/T 19040-2003 Agricultural tractors—Steering requirements
Issued on: 2003-03-11   Implemented on: 2003-8-1 Price(USD): 45.0 Delivery: via email in 1~3 business day

SY/T 6582.4-2003 The calibration for petroleum nuclear logging tool Part 4: The calibration for compensated neutron tool
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 195.0 Delivery: via email in 1~3 business day

SY/T 6234-2003 Determination of gross heat transfer factor for the buried pipeline
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 240.0 Delivery: via email in 1~3 business day

SY/T 6561-2003 Safety rules for extracting oil through pouring natural gas
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 75.0 Delivery: via email in 1~3 business day

GB/T 8479-2003 Aluminium windows
Issued on: 2003-03-01   Implemented on: 2003-9-1 Price(USD): 180.0 Delivery: via email in 1~3 business day

TB 10401.2-2003 Code for technique on construction safety of railway engineering(Volume Two)
Issued on: 2003-03-28   Implemented on: 2003-6-1 Price(USD): 705.0 Delivery: via email in 1~8 business day

SY/T 6551-2003 Safety technology rules for underbalanced drilling
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 75.0 Delivery: via email in 1~3 business day

GB/T 12472-2003 Geometrical Product Specificatoins (GPS)—Surface texture:Profile method—Surface roughness parameters and their values for wooden pieces
Issued on: 2003-03-06   Implemented on: 2003-11-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

SY/T 6566-2003 Hydraulic fracturing safety technique specification
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

TB/T 1925-2003 General technical specification for hydraulic track lifting and lining tool
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

TB/T 1906.6-2003 Railway freight cars atmospheric corrosion resisting cold formed steel sections Part 6:Roof cant rail of covered wagon
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

YZ/T 0090.2-2003 Classification and coding rules postal production equipment Part 2:Equipment of transportation and loading and unloading
Issued on: 2003-03-14   Implemented on: 2003-5-1 Price(USD): 225.0 Delivery: via email in 1~3 business day

GB 13057-2003 The strength of the seats and their anchorages of passenger vehicles
Issued on: 2003-03-01   Implemented on: 2003-9-1 Price(USD): 80.0 Delivery: via email in 1 business day

SN/T 1211-2003 Sanitary treatment codes for entry-exit aircrafts contaminated with cholera
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

SY/T 6009.2-2003 Test method of samples of geochemical exploration for oil and gas Part 2: Determination of soluble hydrocarbons Gas chromatography
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

GB/T 18987-2003 Radiotherapy equipment—Coordinates,movements and scales
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 600.0 Delivery: via email in 1~3 business day

SY/T 6584-2003 Mobile drilling rig
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 225.0 Delivery: via email in 1~3 business day

HJ/T 88-2003 Code for environmental impact of water conservancy and hydropower project
Issued on: 2003-03-28   Implemented on: 2003-4-1 Price(USD): 555.0 Delivery: via email in 1~5 business day

SY/T 6009.6-2003 Test method of samples of geochemical exploration for oil and gas Part 6: Determination of alterative carbonate (△C)
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 255.0 Delivery: via email in 1~3 business day

GB/T 18998.3-2003 Chlorinated poly (vinyl chloride)(PVC-C) piping systems for industrial applications--Part 3:Fittings
Issued on: 2003-03-07   Implemented on: 2003-10-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

TB/T 2839-2003 Electrically heated water boiler for railway passenger coach
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

SY/T 10047-2003 Specifications for environmental protection design of offshore oil/gas field development
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

TB/T 1906.5-2003 Railway freight car’s atmospheric corrosio resisting cold formed steel section
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

JGJ 18-2003 Specification for Welding and Acceptance of Reinforcing Steel Bars
Issued on: 2003-03-27   Implemented on: 2003-5-1 Price(USD): 260.0 Delivery: via email in 1 business day

HJ/T 101-2003 The technical requirement for water quality automatic analyzer of ammonia
Issued on: 2003-03-28   Implemented on: 2003-7-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

SY/T 6247-2003 Technical specification of 3D seismic exploration data acquisition for mountainous area
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 450.0 Delivery: via email in 1~3 business day

SN/T 1215-2003 Codes of disinsection for entry-exit passenger trains
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

SY/T 10048-2003 Recommended practice for evaluation of corroded pipelines
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 870.0 Delivery: via email in 1~8 business day

GB/T 5224-2003 Steel Strand for Pre-stressed Concrete
Issued on: 2003-03-03   Implemented on: 2003-8-1 Price(USD): 100.0 Delivery: via email in 1 business day

GB/T 18780.2-2003 Geometrical Product Specificatons(GPS)?Geometrical features?Part 2:Extracted median line of a cylinder and a cone,ectracted median surface,local size of an extracted feature
Issued on: 2003-03-06   Implemented on: 2003-11-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

GA 68-2003 Stab resistance of personal body armor
Issued on: 2003-03-21   Implemented on: 2003-9-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

GB/T 17680.9-2003 Criteria for emergency planning and preparedness for nuclear power plants--Maintenance of on-site emergency response capacity
Issued on: 2003-03-02   Implemented on: 2003-12-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

SY/T 6573-2003 Measurement method for minimum miscibility pressure by slim tube test
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 285.0 Delivery: via email in 1~3 business day

SY/T 6543.1-2003 Specification for underbalanced drilling technology - Part 1: Methods for design
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 530.0 Delivery: via email in 1~3 business day

SY/T 5251-2003 Geology items and basic quality requirements in oil & gas exploration wells
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

JGJ 95-2003 Technical Specification for Concrete Structures with Cold-rolled Ribbed Steel Wires
Issued on: 2003-03-21   Implemented on: 2003-8-1 Price(USD): 220.0 Delivery: via email in 1 business day

SN/T 1171.2-2003 Detection of antibodies against caprine arthritits-encephalitis virus(CAEV)--Agar gel immunodiffustion(AGID)
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 60.0 Delivery: via email in 1~3 business day

TB/T 1906.4-2003 Railway freight car’s atmospheric corrosio resisting cold formed steel section
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

SY/T 6546-2003 Specification for well-logging data processing and interpretation for complicated lithological formation
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

SY/T 6558-2003 Specifications for design and manufacture of offshore anti-ice risers of oil gas and injection wells
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 240.0 Delivery: via email in 1~3 business day

JJG 51-2003 Verification Regulation of Piston Pressure-Vaccum Gauge with Equilibrium Liquid Column
Issued on: 2003-03-05   Implemented on: 2003-9-1 Price(USD): 285.0 Delivery: via email in 1~3 business day

JJG 979-2003 Verification Regulation of Bar Code Verifiers
Issued on: 2003-03-05   Implemented on: 2003-6-1 Price(USD): 255.0 Delivery: via email in 1~3 business day

TB/T 2653-2003 Lightning protection transformer for railways signal system equipment
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 210.0 Delivery: via email in 1~3 business day

GB/T 18984-2003 Seamless steel tubes for low-temperature-service piping
Issued on: 2003-03-03   Implemented on: 2003-8-1 Price(USD): 80.0 Delivery: via email in 1 business day

JJG 643-2003 Verification Regulation of Flow Standard Facilities by Master Meter Method
Issued on: 2003-03-05   Implemented on: 2003-9-1 Price(USD): 195.0 Delivery: via email in 1~3 business day

SY/T 5499-2003 Labor quota for seismic prospecting with portable rig
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 375.0 Delivery: via email in 1~5 business day

SY/T 6117-2003 The operating and maintenance of petroleum workover rig
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 255.0 Delivery: via email in 1~3 business day

SY/T 6557-2003 Guidelines for application of water spray systems for fire protection in the petroleum industry
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

GB/T 18997.1-2003 Polyethylene/Aluminium/Polyethylene composite pressure pipe--Part 1:PE/AL/PE pipe overlap-welded by aluminium pipe
Issued on: 2003-03-07   Implemented on: 2003-10-1 Price(USD): 360.0 Delivery: via email in 1~3 business day

GB/T 16886.14-2003 Biological evaluation of medical devices--Part 14:Identification and quantificaton of degradation products from ceramics
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 140.0 Delivery: via email in 1~3 business day

GB 19048-2003 Product of designations of origin or geographical indication--Longkou vermicelli
Issued on: 2003-03-28   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

TB/T 3064.2-2003 Track dynamic stabilizer Part 2: Dynamic drive unit
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

GB/T 16901.3-2003 Rules for the presentation of graphical symbols--Graphical symbols for use in the technical documentation of products--Part 3:Classification of connect notes,networks and their encoding
Issued on: 2003-03-02   Implemented on: 2003-10-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

SY/T 6575-2003 Technical regulation for EOR screening guide
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

GB/T 10574.9-2003 Methods for chemical analysis of tin-lead solders-Determination of aluminum content
Issued on: 2003-03-11   Implemented on: 2003-8-1 Price(USD): 75.0 Delivery: via email in 1~3 business day

JTG F30-2003 Technical Specification for Construction of Highway Cement Concrete Pavements
Issued on: 2003-03-28   Implemented on: 2003-7-1 Price(USD): 980.0 Delivery: via email in 1 business day

TB/T 3064.3-2003 Track dynamic stabilizer Part 3: System performance
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

SY/T 6550-2003 The remastering of the seismic exploration data
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 165.0 Delivery: via email in 1~3 business day

SY/T 5454-2003 Technical specifications of vertical seismic profilling
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 270.0 Delivery: via email in 1~3 business day

SY/T 0003-2003 Standard for petroleum and natural gas engineering drawings
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 1365.0 Delivery: via email in 1~10 business day

SY/T 5554-2003 Work quota for wire-line logging engineering
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 820.0 Delivery: via email in 1~5 business day

TB/T 3073-2003 EMC tests and limits for railway electrical signaling apparatus
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 460.0 Delivery: via email in 1~3 business day

JGJ 106-2003 Technical Code for Testing of Building Foundation Piles
Issued on: 2003-03-21   Implemented on: 2003-7-1 Price(USD): 200.0 Delivery: via email in 1 business day

SN/T 1203-2003 Protocol of the qualitative polymerase chain reaction for detecting genetically modified plant components in edible oil
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

JGJ/T 30-2003 Standard of basic terminology for real estate industry
Issued on: 2003-03-17   Implemented on: 2003-6-1 Price(USD): 885.0 Delivery: via email in 1~8 business day

SY/T 5478-2003 The division of diagenetic stages in carbonate rocks
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 195.0 Delivery: via email in 1~3 business day

SY/T 6150.2-2003 Technical standard of tapping & plugging on steel pipeline -- Part 2: The rigide plate-bag stopping on pipeline
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 300.0 Delivery: via email in 1~5 business day

HJ/T 100-2003 The technical requirement for water quality automatic ananlyzer of permanganate index
Issued on: 2003-03-28   Implemented on: 2003-7-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

GB/T 15473-1995 Thermoplastic pipes-Determination of tensile properties-Party 1:General test method
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

JJG 22-2003 Verification Regulation of Internal Micrometers
Issued on: 2003-03-05   Implemented on: 2003-9-1 Price(USD): 255.0 Delivery: via email in 1~3 business day

JJG 177-2003 Taper Gauges
Issued on: 2003-03-05   Implemented on: 2003-9-1 Price(USD): 300.0 Delivery: via email in 1~5 business day

YZ/T 0090.1-2003 Classification and coding rules for postal production equipment Part 1:Mail equipment
Issued on: 2003-03-14   Implemented on: 2003-5-1 Price(USD): 765.0 Delivery: via email in 1~8 business day

SY/T 6565-2003 Technique requirements for CO2 injection in petroleum or water well safety
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

TB/T 3064.4-2003 Track dynamic stabilizer Part 4: Stabilize unit
Issued on: 2003-03-12   Implemented on: 2003-9-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

GB/T 13295-2003 Ductile iron pipes,fittings and accessories for water or gas applications
Issued on: 2003-03-03   Implemented on: 2003-8-1 Price(USD): 1260.0 Delivery: via email in 1~10 business day

HJ/T 104-2003 The technical requirement for water quality automatic analyzer of total organic carbon
Issued on: 2003-03-28   Implemented on: 2003-7-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

GB/T 18998.2-2003 Chlorinated poly(vinyl chloride)(PVC-C) piping systems for industrial applicatoins--Part 2:Pipes
Issued on: 2003-03-07   Implemented on: 2003-10-1 Price(USD): 120.0 Delivery: via email in 1~3 business day

SY/T 6544-2003 Property requirements for well cement slurries
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 270.0 Delivery: via email in 1~3 business day

SY/T 6569-2003 Economical operation for water injection system of oil field
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 90.0 Delivery: via email in 1~3 business day

GB 19041-2003 Safety Regulations for the Production of Phosgene and Phosgenation Products
Issued on: 2003-03-01   Implemented on: 2003-10-1 Price(USD): 80.0 Delivery: via email in 1 business day

SY/T 6567-2003 Code for energy saving & economical operation of natural gas transmission pipeline system
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 15.0 Delivery: via email in 1~3 business day

SY/T 6556-2003 Prevention and suppression of fires in large aboveground atmospheric storage tanks
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 810.0 Delivery: via email in 1~5 business day

SY/T 6560-2003 Rules on electric safety operations of offshore oil facilities
Issued on: 2003-03-18   Implemented on: 2003-8-1 Price(USD): 105.0 Delivery: via email in 1~3 business day

SN/T 1182.1-2003 Detection antibodies against avian influenza virus--Procotol of agar gel immuno-difusion test
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 75.0 Delivery: via email in 1~3 business day

GB/T 18995-2003 Cinematography—Manufacturer-printed,latent image inentification on 16mm,35mm and 65mm motion-picture film—Specificatons and dimensions
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 210.0 Delivery: via email in 1~3 business day

GB/T 18993.2-2003 Chlorinated poly(vinyl chloride)piping systems for hot and cold water installations--Part 2:Pipes
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 150.0 Delivery: via email in 1~3 business day

SN/T 1177-2003 Protocol of test for B virus related antibodies in monkey
Issued on: 2003-03-17   Implemented on: 2003-9-1 Price(USD): 75.0 Delivery: via email in 1~3 business day

GB/T 1592-2003 Agricultural tractors―Rear-mounted power take-off―Types 1,2 and 3
Issued on: 2003-03-01   Implemented on: 2003-8-1 Price(USD): 135.0 Delivery: via email in 1~3 business day

GB/T 16886.15-2003 Biological eveluation of medical devices--Part 15:Inentificatoin and quantificatoin of degradation products from metals and alloys
Issued on: 2003-03-05   Implemented on: 2003-8-1 Price(USD): 170.0 Delivery: via email in 1~3 business day

JJG 67-2003 Verification Regulation of the Total Radiation Pyrometers
Issued on: 2003-03-05   Implemented on: 2003-9-1 Price(USD): 330.0 Delivery: via email in 1~5 business day

GB 18985-2003 Amount of supply gases for divers
Issued on: 2003-03-06   Implemented on: 2003-9-1 Price(USD): 240.0 Delivery: via email in 1~3 business day

Totally 182 standards related
About Us | Contact Us | Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Codeofchina Inc. 2008-2020