1 General Provision
1.0.1 This Code is formulated in order to unify the quality acceptance method for industrial metallic piping construction, strengthen the technical management and ensure the engineering quality.
1.0.2 This Code is applicable to acceptance of construction quality of industrial metallic piping with design pressure no greater than 42MPa and the design temperature no greater than the allowable operating temperature of materials.
1.0.3 This Code shall be used in conjunction with the current national standards "Unified Standard for Constructional Quality Acceptance of Industrial Installation Engineering" (GB 50252) and "Code for Construction of Industrial Metallic Piping Engineering" (GB 50235).
l.0.4 Acceptance of construction quality of industrial metallic piping shall comply with not only this Code, but also those specified in the relevant current standards of the State.
2 Terms
2.0.1 Inspection lot
It refers to inspection bodies consisted of certain quantity samples gathered according to the same working condition or required mode for inspection.
2.0.2 Visual inspection
It refers to inspection on the inspected object by visual observation in conjunction of practical experience to judge whether the object meet those specified in this code or not.
2.0.3 100% examination
It refers to the complete inspection on a specific item in a designated inspection lot.
2.0.4 Random sampling examination
It refers to the inspection on certain percentage of a specific item in a designated inspection lot.
2.0.5 Local sampling examination
It refers to specified local inspection on every certain item in a designated inspection lot.
3 Basic Requirement
3.1 Division for Acceptance of Constructional Quality
3.1.1 The quality acceptance of industrial metallic piping project may be divided according to sub-item project, subsection (sub-subsection) project, unit (sub-unit) project.
3.1.2 The sub-item project shall be divided according to the piping grades and materials.
3.1.3 The industrial metallic piping project in one unit project may be divided into one or several subsection (sub-subsection) projects.
3.1.4 Where the industrial metallic piping project has independent construction conditions or functions of use, one or several subsection (sub-subsection) projects also may constitutes one unit (sun-unit) project.
1 General Provision
2 Terms
3 Basic Requirement
3.1 Division for Acceptance of Constructional Quality
3.2 Acceptance of Constructional Quality
3.3 Procedure and Organization for Acceptance of Constructional Quality
4 Examination of Pipe Work Components and Materials
5 Machining of Piping
5.1 Bending Fabrication
5.2 Machining of Rolling Pipe
5.3 Flanging Edge of Pipe
5.4 Machining of Jacket Pipe
5.5 Production of Miter Elbow
5.6 Fabrication of Piping Support and Hanger
6 Welding and Heat-treatment after Welding of Piping
7 Piping Installation
7.1 General Requirement
7.2 Piping Prefabricate
7.3 Steel Piping Installation
7.4 Installation for Piping of Coupling Equipment
7.5 Cast Iron Piping Installation
7.6 Installation of Stainless Steel Piping and Non-ferrous Piping
7.7 Installation of Heating Piping
7.8 Jacket Piping Installation
7.9 Installation of Anticorrosive Lining Piping
7.10 Valve Installation
7.11 Expansion Joint Installation
7.12 Installation of Piping Support and Hanger
7.13 Installation of Static Electricity Grounding
8 Inspection, Examination and Test for Piping
8.1 Visual Inspection of Welded Seam
8.2 Radiographic and Ultrasonic Examinations of Welded Seam
8.3 Non-destructive Examination of Welded Seam Surface
8.4 Hardness Examination and Other Inspections
8.5 Pressure Test
9 Blowing and Cleaning of Piping
9.1 Water Flushing
9.2 Air Blowing
9.3 Steam Blowing
9.4 Degreasing of Piping
9.5 Chemical Cleaning
9.6 Oil Cleaning
Appendix A Record of Sub-item Project's Quality Acceptance
Appendix B Record of Subsection (Sub-subsection) Project's Quality Acceptance
Appendix C Record of Unit (Sub-unit) Project's Quality Acceptance
Appendix D Record for Check of Project's Quality Guarantee Materials
Explanation of Wording in This Code
List of Quoted Standards
1 General Provision
1.0.1 This Code is formulated in order to unify the quality acceptance method for industrial metallic piping construction, strengthen the technical management and ensure the engineering quality.
1.0.2 This Code is applicable to acceptance of construction quality of industrial metallic piping with design pressure no greater than 42MPa and the design temperature no greater than the allowable operating temperature of materials.
1.0.3 This Code shall be used in conjunction with the current national standards "Unified Standard for Constructional Quality Acceptance of Industrial Installation Engineering" (GB 50252) and "Code for Construction of Industrial Metallic Piping Engineering" (GB 50235).
l.0.4 Acceptance of construction quality of industrial metallic piping shall comply with not only this Code, but also those specified in the relevant current standards of the State.
2 Terms
2.0.1 Inspection lot
It refers to inspection bodies consisted of certain quantity samples gathered according to the same working condition or required mode for inspection.
2.0.2 Visual inspection
It refers to inspection on the inspected object by visual observation in conjunction of practical experience to judge whether the object meet those specified in this code or not.
2.0.3 100% examination
It refers to the complete inspection on a specific item in a designated inspection lot.
2.0.4 Random sampling examination
It refers to the inspection on certain percentage of a specific item in a designated inspection lot.
2.0.5 Local sampling examination
It refers to specified local inspection on every certain item in a designated inspection lot.
3 Basic Requirement
3.1 Division for Acceptance of Constructional Quality
3.1.1 The quality acceptance of industrial metallic piping project may be divided according to sub-item project, subsection (sub-subsection) project, unit (sub-unit) project.
3.1.2 The sub-item project shall be divided according to the piping grades and materials.
3.1.3 The industrial metallic piping project in one unit project may be divided into one or several subsection (sub-subsection) projects.
3.1.4 Where the industrial metallic piping project has independent construction conditions or functions of use, one or several subsection (sub-subsection) projects also may constitutes one unit (sun-unit) project.
Contents of GB 50184-2011
1 General Provision
2 Terms
3 Basic Requirement
3.1 Division for Acceptance of Constructional Quality
3.2 Acceptance of Constructional Quality
3.3 Procedure and Organization for Acceptance of Constructional Quality
4 Examination of Pipe Work Components and Materials
5 Machining of Piping
5.1 Bending Fabrication
5.2 Machining of Rolling Pipe
5.3 Flanging Edge of Pipe
5.4 Machining of Jacket Pipe
5.5 Production of Miter Elbow
5.6 Fabrication of Piping Support and Hanger
6 Welding and Heat-treatment after Welding of Piping
7 Piping Installation
7.1 General Requirement
7.2 Piping Prefabricate
7.3 Steel Piping Installation
7.4 Installation for Piping of Coupling Equipment
7.5 Cast Iron Piping Installation
7.6 Installation of Stainless Steel Piping and Non-ferrous Piping
7.7 Installation of Heating Piping
7.8 Jacket Piping Installation
7.9 Installation of Anticorrosive Lining Piping
7.10 Valve Installation
7.11 Expansion Joint Installation
7.12 Installation of Piping Support and Hanger
7.13 Installation of Static Electricity Grounding
8 Inspection, Examination and Test for Piping
8.1 Visual Inspection of Welded Seam
8.2 Radiographic and Ultrasonic Examinations of Welded Seam
8.3 Non-destructive Examination of Welded Seam Surface
8.4 Hardness Examination and Other Inspections
8.5 Pressure Test
9 Blowing and Cleaning of Piping
9.1 Water Flushing
9.2 Air Blowing
9.3 Steam Blowing
9.4 Degreasing of Piping
9.5 Chemical Cleaning
9.6 Oil Cleaning
Appendix A Record of Sub-item Project's Quality Acceptance
Appendix B Record of Subsection (Sub-subsection) Project's Quality Acceptance
Appendix C Record of Unit (Sub-unit) Project's Quality Acceptance
Appendix D Record for Check of Project's Quality Guarantee Materials
Explanation of Wording in This Code
List of Quoted Standards