2025-6-23 18.97.9.175
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 16507.3-2022
GB/T 16507.3-2022   Water-tube boilers—Part 3: Structure design (English Version)
Standard No.: GB/T 16507.3-2022 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 9000 words Price(USD):270.0 remind me the price change

Email:

Implemented on:2022-10-1 Delivery: via email in 1 business day
,,
Standard No.: GB/T 16507.3-2022
English Name: Water-tube boilers—Part 3: Structure design
Chinese Name: 水管锅炉 第3部分:结构设计
Chinese Classification: J98    Boiler and its auxiliary equipment
Professional Classification: GB    National Standard
ICS Classification: 27.060.30 27.060.30    Boilers and heat exchangers 27.060.30
Issued by: SAMR; SAC
Issued on: 2022-03-09
Implemented on: 2022-10-1
Status: valid
Superseding:GB/T 16507.3-2013 Water-tube Boilers - Part 3: Structure Design
Language: English
File Format: PDF
Word Count: 9000 words
Price(USD): 270.0
Delivery: via email in 1 business day
Water-tube boilers - Part 3: Structure design English 1 Scope This document specifies the structure design requirements for water-tube boiler drum, start-up (steam-water) separator, water storage tank, header, desuperheater, pipe, water wall, superheater, reheater, economizer, tube joint, hanger rod, opening, door hole, rigid beam, steel structure, escalator and platform, etc. This document is applicable to the structure design of water-tube boilers as defined in GB/T 16507.1. 2 Normative references The following normative documents contain provisions which, through reference in this text, constitute indispensable provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 985.1 Recommended joint preparation for gas welding, manual metal arc welding, gas-shield arc welding and beam welding GB/T 985.2 Recommended joint preparation for submerged arc welding GB/T 2900.48 Electrotechnical terminology of boilers GB 4053 (All parts) Safety requirements for fixed steel ladders and platform GB/T 16507.1 Water-tube boilers - Part 1: General requirements GB/T 16507.2 Water-tube boilers - Part 2: Materials GB/T 16507.4 Water-tube boilers - Part 4: Strength calculation of pressure parts GB/T 22395 Specification for design of boiler steel structures JB/T 6734 Calculation method of strength of boiler fillet welding seam JB/T 6735 Calculation method of strength of boiler hanger rod 3 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 2900.48 and GB/T1 6507.1 apply. 4 Basic requirements 4.1 The basic principles of boiler design shall meet the requirements of GB/T 16507.1. 4.2 The calculation load to be considered and the required load calculation shall be determined according to the requirements of this document and the special requirements of GB/T 16507.1 and GB/T 16507.4. 4.3 During design, the wall temperature of the element shall not exceed the allowable temperature of the materials used. In addition, the temperature difference between the inner and outer walls of the heating surface tube and the steam oxidation resistance of the inner wall shall be considered. The selection of materials shall meet the requirements of GB/T 16507.2. 4.4 During design, the minimum required thickness of pressure element shall be determined according to the relevant strength calculation equation or stress analysis calculation equation and requirements in GB/T 16507.4. For non-pressure elements under load, their calculation dimensions shall be determined according to relevant requirements. 4.5 During design, it shall be ensured that the evaporation heating surface, superheater, reheater and economizer system work reliably under the expected working conditions, and the hydrodynamic characteristics are stabilized to prevent the heat transfer from deteriorating. 4.6 The structure of furnace, enclosure and tail flue shall have sufficient bearing capacity to prevent permanent deformation and furnace wall collapse, and shall have good sealing performance. 4.7 The expansion coefficient of flat steel in membrane wall structure shall be similar to that of tubes. The width of flat steel shall be so determined to ensure that it does not exceed the allowable temperature of its material in boiler operation, and the weld structure shall ensure effective cooling of flat steel. 4.8 The load-bearing structure shall have sufficient strength, rigidity, stability and corrosion resistance when bearing the design load. 4.9 The boiler wall shall have good heat insulation and good sealing performance. 4.10 The design of each component shall ensure that it is able to freely expand in the predetermined direction during operation. The expansion center determined by the design of the suspended boiler proper shall be fixed, and an expansion guide device shall be set to ensure that the boiler proper expands in the predetermined direction. For boilers with rated pressure not less than 9.8MPa, when the equipment and fixed structure fail to bear the instantaneous load such as the reaction force discharged by the safety valve and the earthquake force, damping devices shall be arranged in appropriate positions to reduce the impact force and prevent the equipment from being damaged. 4.11 The following parts of the boiler with a rated pressure of not less than 3.8MPa shall be provided with expansion indicators: ——boiler drum/water storage tank, ——superheater outlet, ——reheater inlet/outlet, ——near the burner, ——lower part of downcomer, ——lower header of water wall, ——lower header of tail enclosure, ——economizer inlet header, ——ash hopper of economizer, etc. 4.12 The structure, arrangement and combustion mode of the furnace and combustion equipment shall be suitable for the designed fuel, so as to prevent the flame from directly burning the heating surface and prevent the furnace from slagging or coking. 4.13 During design, the structural type as well as opening and weld arrangement of pressure elements shall avoid or reduce compound stress and stress concentration as much as possible. 4.14 The boiler drum or start-up (steam-water) separator with frequent start-up and stop and other parameters with large fluctuation shall be subjected to fatigue strength check in accordance with GB/T 16507.4.
Foreword i Introduction iv 1 Scope 2 Normative references 3 Terms and definitions 4 Basic requirements 5 Welding connection requirements 6 Opening 7 Boiler drum 8 Start-up (steam-water) separator and water storage tank 9 Header and pipe 10 Desuperheater 11 Furnace (water wall) 12 Superheater and reheater 13 Economizer 14 Supporting and hoisting devices 15 Rigid beam 16 Boiler steel structure as well as escalator and platform Bibliography
Referred in GB/T 16507.3-2022:
*GB/T 985.1-2008 Recommended Joint Preparation for Gas Welding, Manual Metal Arc
*GB/T 985.2-2008 Recommended Joint Preparation for Submerged Arc Welding
*GB/T 2900.48-2008 Electrotechnical terminology of boilers
*GB4053-
*GB/T 16507.1-2022 Water-tube boilers—Part 1: General requirements
*GB/T 16507.2-2022 Water-tube boilers—Part 2: Materials
*GB/T 16507.4-2022 Water-tube boilers—Part 4: Strength calculation of pressure parts
*GB/T 22395-2022 Specification for design of boiler steel structures
*JB/T 6734-1993 Calculation Method of Strength of Boiler Fillet Welding Seam
*JB/T 6735-1993 Calculation Method for Strength of Boiler Hanger Rod
GB/T 16507.3-2022 is referred in:
*GB/T 16508.3-2022 Shell boilers—Part 3: Design and strength calculation
*GB/T 16507.1-2013 Water-tube Boilers - Part 1: General Requirement
*GB/T 16507.1-2022 Water-tube boilers—Part 1: General requirements
*GB/T 16508-2022 Shell boilers
*GB/T 16508.1-2022 Shell boilers—Part 1: General requirements
*GB/T 16507.5-2022 Water-tube boilers—Part 5: Fabrication
*GB/T 16507.5-2013 Water-tube Boilers - Part 5: Fabrication
*GB/T 16507.4-2022 Water-tube boilers—Part 4: Strength calculation of pressure parts
*GB/T 44907-2024 Technical criteria for quality evaluation of biomass fired boilers
*GB/T 16507-2013 Water-tube boilers
Code of China
Standard
GB/T 16507.3-2022  Water-tube boilers—Part 3: Structure design (English Version)
Standard No.GB/T 16507.3-2022
Statusvalid
LanguageEnglish
File FormatPDF
Word Count9000 words
Price(USD)270.0
Implemented on2022-10-1
Deliveryvia email in 1 business day
Detail of GB/T 16507.3-2022
Standard No.
GB/T 16507.3-2022
English Name
Water-tube boilers—Part 3: Structure design
Chinese Name
水管锅炉 第3部分:结构设计
Chinese Classification
J98
Professional Classification
GB
ICS Classification
Issued by
SAMR; SAC
Issued on
2022-03-09
Implemented on
2022-10-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB/T 16507.3-2013 Water-tube Boilers - Part 3: Structure Design
Language
English
File Format
PDF
Word Count
9000 words
Price(USD)
270.0
Keywords
GB/T 16507.3-2022, GB 16507.3-2022, GBT 16507.3-2022, GB/T16507.3-2022, GB/T 16507.3, GB/T16507.3, GB16507.3-2022, GB 16507.3, GB16507.3, GBT16507.3-2022, GBT 16507.3, GBT16507.3
Introduction of GB/T 16507.3-2022
Water-tube boilers - Part 3: Structure design English 1 Scope This document specifies the structure design requirements for water-tube boiler drum, start-up (steam-water) separator, water storage tank, header, desuperheater, pipe, water wall, superheater, reheater, economizer, tube joint, hanger rod, opening, door hole, rigid beam, steel structure, escalator and platform, etc. This document is applicable to the structure design of water-tube boilers as defined in GB/T 16507.1. 2 Normative references The following normative documents contain provisions which, through reference in this text, constitute indispensable provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 985.1 Recommended joint preparation for gas welding, manual metal arc welding, gas-shield arc welding and beam welding GB/T 985.2 Recommended joint preparation for submerged arc welding GB/T 2900.48 Electrotechnical terminology of boilers GB 4053 (All parts) Safety requirements for fixed steel ladders and platform GB/T 16507.1 Water-tube boilers - Part 1: General requirements GB/T 16507.2 Water-tube boilers - Part 2: Materials GB/T 16507.4 Water-tube boilers - Part 4: Strength calculation of pressure parts GB/T 22395 Specification for design of boiler steel structures JB/T 6734 Calculation method of strength of boiler fillet welding seam JB/T 6735 Calculation method of strength of boiler hanger rod 3 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 2900.48 and GB/T1 6507.1 apply. 4 Basic requirements 4.1 The basic principles of boiler design shall meet the requirements of GB/T 16507.1. 4.2 The calculation load to be considered and the required load calculation shall be determined according to the requirements of this document and the special requirements of GB/T 16507.1 and GB/T 16507.4. 4.3 During design, the wall temperature of the element shall not exceed the allowable temperature of the materials used. In addition, the temperature difference between the inner and outer walls of the heating surface tube and the steam oxidation resistance of the inner wall shall be considered. The selection of materials shall meet the requirements of GB/T 16507.2. 4.4 During design, the minimum required thickness of pressure element shall be determined according to the relevant strength calculation equation or stress analysis calculation equation and requirements in GB/T 16507.4. For non-pressure elements under load, their calculation dimensions shall be determined according to relevant requirements. 4.5 During design, it shall be ensured that the evaporation heating surface, superheater, reheater and economizer system work reliably under the expected working conditions, and the hydrodynamic characteristics are stabilized to prevent the heat transfer from deteriorating. 4.6 The structure of furnace, enclosure and tail flue shall have sufficient bearing capacity to prevent permanent deformation and furnace wall collapse, and shall have good sealing performance. 4.7 The expansion coefficient of flat steel in membrane wall structure shall be similar to that of tubes. The width of flat steel shall be so determined to ensure that it does not exceed the allowable temperature of its material in boiler operation, and the weld structure shall ensure effective cooling of flat steel. 4.8 The load-bearing structure shall have sufficient strength, rigidity, stability and corrosion resistance when bearing the design load. 4.9 The boiler wall shall have good heat insulation and good sealing performance. 4.10 The design of each component shall ensure that it is able to freely expand in the predetermined direction during operation. The expansion center determined by the design of the suspended boiler proper shall be fixed, and an expansion guide device shall be set to ensure that the boiler proper expands in the predetermined direction. For boilers with rated pressure not less than 9.8MPa, when the equipment and fixed structure fail to bear the instantaneous load such as the reaction force discharged by the safety valve and the earthquake force, damping devices shall be arranged in appropriate positions to reduce the impact force and prevent the equipment from being damaged. 4.11 The following parts of the boiler with a rated pressure of not less than 3.8MPa shall be provided with expansion indicators: ——boiler drum/water storage tank, ——superheater outlet, ——reheater inlet/outlet, ——near the burner, ——lower part of downcomer, ——lower header of water wall, ——lower header of tail enclosure, ——economizer inlet header, ——ash hopper of economizer, etc. 4.12 The structure, arrangement and combustion mode of the furnace and combustion equipment shall be suitable for the designed fuel, so as to prevent the flame from directly burning the heating surface and prevent the furnace from slagging or coking. 4.13 During design, the structural type as well as opening and weld arrangement of pressure elements shall avoid or reduce compound stress and stress concentration as much as possible. 4.14 The boiler drum or start-up (steam-water) separator with frequent start-up and stop and other parameters with large fluctuation shall be subjected to fatigue strength check in accordance with GB/T 16507.4.
Contents of GB/T 16507.3-2022
Foreword i Introduction iv 1 Scope 2 Normative references 3 Terms and definitions 4 Basic requirements 5 Welding connection requirements 6 Opening 7 Boiler drum 8 Start-up (steam-water) separator and water storage tank 9 Header and pipe 10 Desuperheater 11 Furnace (water wall) 12 Superheater and reheater 13 Economizer 14 Supporting and hoisting devices 15 Rigid beam 16 Boiler steel structure as well as escalator and platform Bibliography
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 16507.3-2022, GB 16507.3-2022, GBT 16507.3-2022, GB/T16507.3-2022, GB/T 16507.3, GB/T16507.3, GB16507.3-2022, GB 16507.3, GB16507.3, GBT16507.3-2022, GBT 16507.3, GBT16507.3