2023-3-23 3.239.117.1
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 16508.1-2022
GB/T 16508.1-2022   Shell boilers—Part 1: General requirements (English Version)
Standard No.: GB/T 16508.1-2022 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 9500 words Price(USD):285.0 remind me the price change

Email:

Implemented on:2022-10-1 Delivery: via email in 1 business day
,,
Standard No.: GB/T 16508.1-2022
English Name: Shell boilers—Part 1: General requirements
Chinese Name: 锅壳锅炉 第1部分:总则
Professional Classification: GB    National Standard
Issued by: SAMR, SAC
Issued on: 2022-03-09
Implemented on: 2022-10-1
Status: valid
Superseding:GB/T 16508.1-2013 Shell Boilers - Part 1: General Requirements
Language: English
File Format: PDF
Word Count: 9500 words
Price(USD): 285.0
Delivery: via email in 1 business day
Shell boilers — Part 1: General requirements 1 Scope 1.1 This document specifies the general technical requirements for the range, rated parameters, design and calculation, fabrication and inspection, installation and operation, performance test, energy conservation and environmental protection of shell boilers. 1.2 This document is applicable to the fixed shell boilers within the following range: a) Steam boilers with a rated steam pressure of larger than or equal to 0.1 MPa; b) Hot water boilers with a rated outlet pressure of larger than or equal to 0.1 MPa and rated thermal power of larger than or equal to 0.1 MW. 1.3 Once-through boilers and heat recovery boilers containing shell boiler elements shall be subjected to this document. 1.4 This document is not applicable to the following equipment: a) Movable shell boilers; b) Cooling devices for the cooling requirements of equipment and process flow. 1.5 This document may be used as a reference to fixed shell boilers with rated pressure of less than 0.1 MPa. 2 Normative references The following documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 753 Steam condition series for utility boilers GB/T 1921 Parameters for industrial steam boilers GB/T 2900.48 Electrotechnical terminology of boilers GB 3095 Ambient air quality standard GB 3096 Environmental quality standards for noise GB/T 3166 Parameters for hot water boilers GB 4053 (all parts) Safety requirements for fixed steel ladders and platform GB 8978 Integrated wastewater discharge standard GB/T 10180 Thermal performance test code for industrial boilers GB/T 10863 Thermal test method for gas pass heat recovery boiler GB 12348 Emission standard for industrial enterprises noise at boundary GB 13271 Emission standard of air pollutants for boiler GB/T 16507.3 Water-tube boilers — Part 3: Structure design GB/T 16507.4 Water-tube boilers — Part 4: Strength calculation of pressure parts GB/T 16508.2 Shell boilers — Part 2: Materials GB/T 16508.3 Shell boilers — Part 3: Design and strength calculation GB/T 16508.4 Shell boilers — Part 4: Fabrication, inspection and acceptance GB/T 16508.5 Shell boilers — Part 5: Safety appurtenances and instruments GB/T 16508.6 Shell boilers — Part 6: Combustion systems GB/T 16508.7 Shell boilers — Part 7: Installation GB/T 16508.8 Shell boilers — Part 8: Operation GB/T 22395 Specification for design of boiler steel structures GB 24500 Minimum allowable values of energy efficiency and energy efficiency grades of industrial boilers GB/T 28056 General specification for gas pass heat recovery boiler JB/T 2192 Specification for square cast-iron economizer JB/T 2932 Specification for water treatment equipments JB/T 6735 Calculation method of strength of boiler hanger rod JB/T 7985 Specification for small type boilers and atmospheric hot water boilers JB/T 8501 Boiler soot blowers and thermoprobe JB/T 9618 Design criteria for interior devices of industrial boiler drum JB/T 10325 Specification for boiler deaerator JB/T 10393 Specification for electric boilers NB/T 47034 Specification for industrial boilers NB/T 47040 Man-hole or hand-hole of boiler set NB/T 47049 Technical specification for the manufacture of tubular air preheaters NB/T 47051 Specification for industrial boiler control devices NB/T 47062 Biomass molded fuel fired boilers NB/T 47066 Thermal performance test method for condensing boiler 3 Terms, definitions and symbols 3.1 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 2900.48 and the following apply. 3.1.1 shell boiler boiler in which the evaporating heating surface is mainly set in the shell, the burning flame or flue gas is in the tube and the working substance flows outside the tube   3.1.2 boiler proper whole boiler composed of boiler shell steam-water separator, heating surface, header and its connecting tube, furnace, combustion equipment, air preheater, furnace wall, flue (air) duct, framework (including platform and escalator), etc. 3.1.3 pressure element element subjected to pressure of internal or external working substance Note: A pressure element is the basic unit to compose boiler pressure component. 3.1.4 pressure component relatively independent component composed of several pressure elements in a boiler system Note: Pressure components include boiler shell, furnace liner, reversal chamber, header, water wall, economizer, energy saver, condenser and superheater. 3.1.5 non-pressure element element not subjected to pressure of working substance Note: Non-pressure elements include load-bearing and non-load-bearing elements, and load-bearing non-pressure elements include tension braces, supports (hangers) and fasteners. 3.1.6 safety appurtenance appliance or device for protecting boiler from operating beyond design conditions 3.1.7 instrument device for displaying or measuring alone or together with other equipment 3.1.8 rated pressure pressure of working substance at the boiler outlet that shall be guaranteed during long-term continuous operation within the specified feed water pressure and load range, i.e. the rated working pressure or rated outlet pressure marked on the nameplate of the boiler 3.1.9 rated temperature temperature of working substance at the boiler outlet that shall be guaranteed during long-term continuous operation under the specified design conditions, i.e. the rated steam temperature or rated outlet water temperature marked on the nameplate of the boiler 3.2 Symbols For the purposes of this document, the following symbols apply. Rm——the lower limit of standard tensile strength of material at room temperature, MPa; ReL(Rp0.2)——the standard yield strength of material at room temperature, MPa; ——the yield strength of material at design temperature, MPa; ——the endurance strength of material at design temperature (105h), MPa; ——the creep strength of material at design temperature (1×10-5%/h), MPa; θ——the quality coefficient of cast steel. 4 Responsibilities 4.1 User unit The user unit shall determine the technical requirements of the boiler according to various factors related to the service conditions, and provide the manufacturer with the following conditions for design and fabrication in written form: a) The construction standards determined in consultation with the manufacturer; b) The main parameters and fuel characteristics of the boiler shall be given according to the design requirements, and other requirements shall be proposed. 4.2 Manufacturer The manufacturer shall ensure that the boiler meets the reasonable requirements of the user. It shall be responsible for implementing the requirements of this document, and meets the following requirements: a) Design the boiler according to the requirements of the user according to the principles of safety, energy conservation and environmental protection, and ensure that the energy efficiency and emission of the boiler in normal service meet the requirements of laws and regulations and of the user unit; b) Establish and operate a quality system effectively, and be responsible for the quality of boiler products designed and fabricated; c) Guarantee the correctness and completeness of the design documents, and the traceability of changes to the design documents; d) Provide the corresponding technical data to the user unit according to the requirements of GB/T 16508.4, when the boiler leaves the factory. 4.3 Installation unit The responsibilities of the installation unit are as follows: a) Boilers shall be installed according to the technical requirements of installation instructions provided by manufacturer and relevant requirements of GB/T 16508.7. b) The installation unit shall be responsible for the quality of its installation and construction.
Foreword i Introduction iv 1 Scope 2 Normative references 3 Terms, definitions and symbols 4 Responsibilities 5 Range and typical structural type of boiler 6 Rated parameters of boiler 7 Design and calculation 8 Fabrication and inspection 9 Installation and operation 10 Performance test 11 Energy conservation and environmental protection Appendix A (Informative) Typical structural types of boiler Bibliography
Referred in GB/T 16508.1-2022:
*GB/T 753-2012 Steam condition series for utility boilers
*GB/T 1921-2004 Parameters for industrial steam boilers
*GB/T 2900.48-2008 Electrotechnical terminology of boilers
*GB 3095-2012/XG1-2018
*GB 3096-2008 Environmental Quality Standard for Noise
*GB/T 3166-2004 Parameters for hot water boilers
*GB4053-
*GB 8978-1996 Integrated Wastewater Discharge Standard
*GB/T 10180-2017 Thermal performance test code for industrial boilers
*GB/T 10863-2011 Thermal test method for gas pass heat recovery boiler
*GB 12348-2008 Emission Standard for Industrial Enterprises Noise at Boundary
*GB 13271-2014 Emission standard of air pollutants for boiler
*GB/T 16507.3-2022 Water-tube boilers—Part 3: Structure design
*GB/T 16507.4-2022 Water-tube boilers—Part 4: Strength calculation of pressure parts
*GB/T 16508.2-2022 Shell boilers—Part 2:Materials
*GB/T 16508.3-2022 Shell boilers—Part 3: Design and strength calculation
*GB/T 16508.4-2022 Shell boilers—Part 4: Fabrication, inspection and acceptance
*GB/T 16508.5-2022 Shell boilers—Part 5:Safety appurtenances and instruments
*GB/T 16508.6-2022 Shell boilers—Part 6:Combustion systems
*GB/T 16508.7-2022 Shell boilers—Part 7:Installation
*GB/T 16508.8-2022 Shell boilers—Part 8: Operation
*GB/T 22395-2022 Specification for design of boiler steel structures
*GB 24500-2020 Minimum allowable values of energy efficiency and energy efficiency grades of industrial boilers
*GB/T 28056-2011 General specification for gas pass heat recovery boiler
*JB/T 2192-1993 Specification for Square Cast-iron Economizer
*JB/T 2932-1999 Specification for Water Treatment Equipments
*JB/T 6735-1993 Calculation Method for Strength of Boiler Hanger Rod
*JB/T 7985-2002 Specification for small type boilers and atmospheric hot water boilers
*JB/T 8501-1996 Boiler Soot Blowers and Thermoprobe
*JB/T 9618-1999 Design criteria for interior devices of industrial boiler drum
*JB/T 10325-2002 Specification for Boiler Deaerator
*JB/T 10393-2002 Specification for electric boilers
*NB/T 47034-2021
*NB/T 47040-2013 Man-hole and Hand-hole of Boiler Set
*NB/T 47049-2016 Technical specification for reciprocating grate
*NB/T 47051-2016 Technical specification for industrial boiler control devices
*NB/T 47062-2017 Biomass molded fuel fired boilers
*NB/T 47066-2018 Thermal performance test method for condensing boiler
GB/T 16508.1-2022 is referred in:
*GB/T 16508.3-2022 Shell boilers—Part 3: Design and strength calculation
*GB/T 16508.8-2022 Shell boilers—Part 8: Operation
*GB/T 16508.2-2022 Shell boilers—Part 2:Materials
*GB/T 16508.5-2022 Shell boilers—Part 5:Safety appurtenances and instruments
*GB/T 16508.7-2022 Shell boilers—Part 7:Installation
*GB/T 16508.2-2013 Shell Boilers - Part 2: Material
*GB/T 16508.4-2013 Shell Boilers - Part 4: Fabrication, Inspection and Acceptance
*GB/T 16508.4-2022 Shell boilers—Part 4: Fabrication, inspection and acceptance
*GB/T 16508.6-2022 Shell boilers—Part 6:Combustion systems
*GB/T 16508.7-2013 Shell Boilers - Part 7: Installation
Code of China
Standard
GB/T 16508.1-2022  Shell boilers—Part 1: General requirements (English Version)
Standard No.GB/T 16508.1-2022
Statusvalid
LanguageEnglish
File FormatPDF
Word Count9500 words
Price(USD)285.0
Implemented on2022-10-1
Deliveryvia email in 1 business day
Detail of GB/T 16508.1-2022
Standard No.
GB/T 16508.1-2022
English Name
Shell boilers—Part 1: General requirements
Chinese Name
锅壳锅炉 第1部分:总则
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
SAMR, SAC
Issued on
2022-03-09
Implemented on
2022-10-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB/T 16508.1-2013 Shell Boilers - Part 1: General Requirements
Language
English
File Format
PDF
Word Count
9500 words
Price(USD)
285.0
Keywords
GB/T 16508.1-2022, GB 16508.1-2022, GBT 16508.1-2022, GB/T16508.1-2022, GB/T 16508.1, GB/T16508.1, GB16508.1-2022, GB 16508.1, GB16508.1, GBT16508.1-2022, GBT 16508.1, GBT16508.1
Introduction of GB/T 16508.1-2022
Shell boilers — Part 1: General requirements 1 Scope 1.1 This document specifies the general technical requirements for the range, rated parameters, design and calculation, fabrication and inspection, installation and operation, performance test, energy conservation and environmental protection of shell boilers. 1.2 This document is applicable to the fixed shell boilers within the following range: a) Steam boilers with a rated steam pressure of larger than or equal to 0.1 MPa; b) Hot water boilers with a rated outlet pressure of larger than or equal to 0.1 MPa and rated thermal power of larger than or equal to 0.1 MW. 1.3 Once-through boilers and heat recovery boilers containing shell boiler elements shall be subjected to this document. 1.4 This document is not applicable to the following equipment: a) Movable shell boilers; b) Cooling devices for the cooling requirements of equipment and process flow. 1.5 This document may be used as a reference to fixed shell boilers with rated pressure of less than 0.1 MPa. 2 Normative references The following documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 753 Steam condition series for utility boilers GB/T 1921 Parameters for industrial steam boilers GB/T 2900.48 Electrotechnical terminology of boilers GB 3095 Ambient air quality standard GB 3096 Environmental quality standards for noise GB/T 3166 Parameters for hot water boilers GB 4053 (all parts) Safety requirements for fixed steel ladders and platform GB 8978 Integrated wastewater discharge standard GB/T 10180 Thermal performance test code for industrial boilers GB/T 10863 Thermal test method for gas pass heat recovery boiler GB 12348 Emission standard for industrial enterprises noise at boundary GB 13271 Emission standard of air pollutants for boiler GB/T 16507.3 Water-tube boilers — Part 3: Structure design GB/T 16507.4 Water-tube boilers — Part 4: Strength calculation of pressure parts GB/T 16508.2 Shell boilers — Part 2: Materials GB/T 16508.3 Shell boilers — Part 3: Design and strength calculation GB/T 16508.4 Shell boilers — Part 4: Fabrication, inspection and acceptance GB/T 16508.5 Shell boilers — Part 5: Safety appurtenances and instruments GB/T 16508.6 Shell boilers — Part 6: Combustion systems GB/T 16508.7 Shell boilers — Part 7: Installation GB/T 16508.8 Shell boilers — Part 8: Operation GB/T 22395 Specification for design of boiler steel structures GB 24500 Minimum allowable values of energy efficiency and energy efficiency grades of industrial boilers GB/T 28056 General specification for gas pass heat recovery boiler JB/T 2192 Specification for square cast-iron economizer JB/T 2932 Specification for water treatment equipments JB/T 6735 Calculation method of strength of boiler hanger rod JB/T 7985 Specification for small type boilers and atmospheric hot water boilers JB/T 8501 Boiler soot blowers and thermoprobe JB/T 9618 Design criteria for interior devices of industrial boiler drum JB/T 10325 Specification for boiler deaerator JB/T 10393 Specification for electric boilers NB/T 47034 Specification for industrial boilers NB/T 47040 Man-hole or hand-hole of boiler set NB/T 47049 Technical specification for the manufacture of tubular air preheaters NB/T 47051 Specification for industrial boiler control devices NB/T 47062 Biomass molded fuel fired boilers NB/T 47066 Thermal performance test method for condensing boiler 3 Terms, definitions and symbols 3.1 Terms and definitions For the purposes of this document, the terms and definitions given in GB/T 2900.48 and the following apply. 3.1.1 shell boiler boiler in which the evaporating heating surface is mainly set in the shell, the burning flame or flue gas is in the tube and the working substance flows outside the tube   3.1.2 boiler proper whole boiler composed of boiler shell steam-water separator, heating surface, header and its connecting tube, furnace, combustion equipment, air preheater, furnace wall, flue (air) duct, framework (including platform and escalator), etc. 3.1.3 pressure element element subjected to pressure of internal or external working substance Note: A pressure element is the basic unit to compose boiler pressure component. 3.1.4 pressure component relatively independent component composed of several pressure elements in a boiler system Note: Pressure components include boiler shell, furnace liner, reversal chamber, header, water wall, economizer, energy saver, condenser and superheater. 3.1.5 non-pressure element element not subjected to pressure of working substance Note: Non-pressure elements include load-bearing and non-load-bearing elements, and load-bearing non-pressure elements include tension braces, supports (hangers) and fasteners. 3.1.6 safety appurtenance appliance or device for protecting boiler from operating beyond design conditions 3.1.7 instrument device for displaying or measuring alone or together with other equipment 3.1.8 rated pressure pressure of working substance at the boiler outlet that shall be guaranteed during long-term continuous operation within the specified feed water pressure and load range, i.e. the rated working pressure or rated outlet pressure marked on the nameplate of the boiler 3.1.9 rated temperature temperature of working substance at the boiler outlet that shall be guaranteed during long-term continuous operation under the specified design conditions, i.e. the rated steam temperature or rated outlet water temperature marked on the nameplate of the boiler 3.2 Symbols For the purposes of this document, the following symbols apply. Rm——the lower limit of standard tensile strength of material at room temperature, MPa; ReL(Rp0.2)——the standard yield strength of material at room temperature, MPa; ——the yield strength of material at design temperature, MPa; ——the endurance strength of material at design temperature (105h), MPa; ——the creep strength of material at design temperature (1×10-5%/h), MPa; θ——the quality coefficient of cast steel. 4 Responsibilities 4.1 User unit The user unit shall determine the technical requirements of the boiler according to various factors related to the service conditions, and provide the manufacturer with the following conditions for design and fabrication in written form: a) The construction standards determined in consultation with the manufacturer; b) The main parameters and fuel characteristics of the boiler shall be given according to the design requirements, and other requirements shall be proposed. 4.2 Manufacturer The manufacturer shall ensure that the boiler meets the reasonable requirements of the user. It shall be responsible for implementing the requirements of this document, and meets the following requirements: a) Design the boiler according to the requirements of the user according to the principles of safety, energy conservation and environmental protection, and ensure that the energy efficiency and emission of the boiler in normal service meet the requirements of laws and regulations and of the user unit; b) Establish and operate a quality system effectively, and be responsible for the quality of boiler products designed and fabricated; c) Guarantee the correctness and completeness of the design documents, and the traceability of changes to the design documents; d) Provide the corresponding technical data to the user unit according to the requirements of GB/T 16508.4, when the boiler leaves the factory. 4.3 Installation unit The responsibilities of the installation unit are as follows: a) Boilers shall be installed according to the technical requirements of installation instructions provided by manufacturer and relevant requirements of GB/T 16508.7. b) The installation unit shall be responsible for the quality of its installation and construction.
Contents of GB/T 16508.1-2022
Foreword i Introduction iv 1 Scope 2 Normative references 3 Terms, definitions and symbols 4 Responsibilities 5 Range and typical structural type of boiler 6 Rated parameters of boiler 7 Design and calculation 8 Fabrication and inspection 9 Installation and operation 10 Performance test 11 Energy conservation and environmental protection Appendix A (Informative) Typical structural types of boiler Bibliography
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Foryou Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 16508.1-2022, GB 16508.1-2022, GBT 16508.1-2022, GB/T16508.1-2022, GB/T 16508.1, GB/T16508.1, GB16508.1-2022, GB 16508.1, GB16508.1, GBT16508.1-2022, GBT 16508.1, GBT16508.1