2025-5-25 18.97.14.82
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JTG B01-2014
JTG B01-2014   Technical Standard of Highway Engineering (English Version)
Standard No.: JTG B01-2014 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 20,000 words Price(USD):350.0 remind me the price change

Email:

Implemented on:2015-1-1 Delivery: via email in 1 business day
,,
Standard No.: JTG B01-2014
English Name: Technical Standard of Highway Engineering
Chinese Name: 公路工程技术标准
Professional Classification: JT    Professional Standard - Transport
Issued by: Ministry of Transport
Issued on: 2014-09-30
Implemented on: 2015-1-1
Status: valid
Superseding:JTG BOl-2003
JTG B01-2003 Technical Standard of Highway Engineering
Language: English
File Format: PDF
Word Count: 20,000 words
Price(USD): 350.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This standard was developed with a view to standardizing construction of highway engineering. 1.0.2 This standard is applicable to highway construction, reconstruction and extension. 1.0.3 For highway construction, highway functions shall be determined by comprehensive analysis on regional characteristics, traffic characteristics and road network structure, and technical levels and key technical indexes shall be selected according to functions in combination with traffic volume, and topographic conditions, etc. 1.0.4 Favorable overall design is required for highway construction project to make the main works coordinated and supporting with traffic engineering and roadside facilities and give full play to their respective functions and overall function of the project. 1.0.5 Highway construction shall follow the principle of arable land protection and land conservation and shall meet the following requirements while determining the scope of highway land: 1 Land within at least 1m scope outside outer edge of the gutter on both sides of the highway embankment (without gutter, slope toe of embankment or berm) or outside outer edge of the intercepting ditch on cutting slope crest (without intercepting ditch, slope crest) is highway land; if conditions permit, highway land covers the land within at least 3m scope for expressway and Grade I highway, and at least 2m scope for Grade II highway. 2 Land area shall be determined according to actual demand, where adverse geological areas such as sand storm, snow hazard, landslide and debris flow are arranged with protection and improvement area works or areas with special soil such as expansive soil and saline soil are treated. 3 Land area shall be determined according to actual demand, for bridge, tunnel, interchange, separate flyover crossing, grade crossing, safety facilities, service facilities, management facilities greening and other off-line engineering. 1.0.6 Highway construction must follow the national environmental protection and resource conservation laws and regulations and shall meet the following requirements: 1 Environmental protection for highway shall follow the principle of "comprehensive treatment taking priority of prevention over treatment". 2 Greening, beautifying and environmental protection shall be carried out for highway construction according to natural conditions. 3 Environmental impact assessment and water and soil conservation program assessment shall be carried out for expressway, Grade I and Grade II highways and highway construction project with special requirements. 4 Environmental protection design shall be carried out in the areas with fragile ecological environment or in the areas hard to be recovered in short term due to highway construction. 5 Engineering construction resources shall be saved by making the best of highway waste and scrap in highway reconstruction & extension project. 1.0.7 Overall design must be carried out in the principle of overall planning and phased implementation for highway construction by phases which shall meet the following requirements: 1 Advance engineering shall be made the best of in later stage. 2 Expressway section with integral-type cross-section shall not be constructed transversely by breadths or by stages. 3 Expressway section with separate cross-section may be constructed by breadths or by stages; the breadth earlier constructed shall be administrated according to conditions of Grade II highway open to traffic when it is open to traffic as two-way traffic. 1.0.8 During highway reconstruction & extension, demonstration, comparison and selection shall be carried out construction, reconstruction and extension schemes. Reconstruction and extension schemes, if adopted, shall meet the following requirements:
Contents 1 General Provisions 2 Terminologies 3 Basic Requirements 3.1 Highway Grading 3.2 Design Vehicle 3.3 Traffic Volume 3.4 Level of Service 3.5 Speed 3.6 Construction Gauge 3.7 Seismic Design 4 Route 5 Subgrade and Pavement 6 Bridge and Culvert 7 Vehicle and Crowd Load 8 Tunnels 9 Route Crossing 9.1 Highway and Highway Grade Crossing 9.2 Highway and Highway Flyover Crossing 9.3 Highway and Railway Crossing 9.4 Highway and Rural Road Crossing 9.5 Crossing of Highway and Pipeline and Others 9.6 Animal Passage 10 Traffic Engineering and Roadside Facilities 10.1 General Requirements 10.2 Traffic Safety Facilities 10.3 Service Facilities 10.4 Management Facilities Appendix A Classification of Highway Service Level Appendix B Stopping Sight Distance of Trucks and Identifying Sight Distance Explanation of Wording
JTG B01-2014 is referred in:
*GB 3096-2008 Environmental Quality Standard for Noise
*GB/T 4352-2007 Fuel consumption for trucks in operation
*SL 265-2016 Design specification for sluice
*QJ 3316-2008 General Specification for 50t Launching and Transporting & Transferring Vehicle Chassis of Missile
*JB/T 12388-2015 Tyred Self-propelled Platform Transporter
*GB/T 33577-2017 Intelligent transportation systems -- Forward vehicle collision warning systems -- Performance requirements and test procedures
*GB/T 4570-2022 Test method of durability for motorcycles and mopeds
*GB/T 43758.1-2024 Technical specifications for driving safety test environment for intelligent and connected vehicles—Part 1: Public road
Code of China
Standard
JTG B01-2014  Technical Standard of Highway Engineering (English Version)
Standard No.JTG B01-2014
Statusvalid
LanguageEnglish
File FormatPDF
Word Count20,000 words
Price(USD)350.0
Implemented on2015-1-1
Deliveryvia email in 1 business day
Detail of JTG B01-2014
Standard No.
JTG B01-2014
English Name
Technical Standard of Highway Engineering
Chinese Name
公路工程技术标准
Chinese Classification
Professional Classification
JT
ICS Classification
Issued by
Ministry of Transport
Issued on
2014-09-30
Implemented on
2015-1-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
JTG BOl-2003
JTG B01-2003 Technical Standard of Highway Engineering
Language
English
File Format
PDF
Word Count
20,000 words
Price(USD)
350.0
Keywords
JTG B01-2014, JTG/T B01-2014, JTGT B01-2014, JTGB01-2014, JTG B01, JTGB01, JTG/TB01-2014, JTG/T B01, JTG/TB01, JTGTB01-2014, JTGT B01, JTGTB01
Introduction of JTG B01-2014
1 General Provisions 1.0.1 This standard was developed with a view to standardizing construction of highway engineering. 1.0.2 This standard is applicable to highway construction, reconstruction and extension. 1.0.3 For highway construction, highway functions shall be determined by comprehensive analysis on regional characteristics, traffic characteristics and road network structure, and technical levels and key technical indexes shall be selected according to functions in combination with traffic volume, and topographic conditions, etc. 1.0.4 Favorable overall design is required for highway construction project to make the main works coordinated and supporting with traffic engineering and roadside facilities and give full play to their respective functions and overall function of the project. 1.0.5 Highway construction shall follow the principle of arable land protection and land conservation and shall meet the following requirements while determining the scope of highway land: 1 Land within at least 1m scope outside outer edge of the gutter on both sides of the highway embankment (without gutter, slope toe of embankment or berm) or outside outer edge of the intercepting ditch on cutting slope crest (without intercepting ditch, slope crest) is highway land; if conditions permit, highway land covers the land within at least 3m scope for expressway and Grade I highway, and at least 2m scope for Grade II highway. 2 Land area shall be determined according to actual demand, where adverse geological areas such as sand storm, snow hazard, landslide and debris flow are arranged with protection and improvement area works or areas with special soil such as expansive soil and saline soil are treated. 3 Land area shall be determined according to actual demand, for bridge, tunnel, interchange, separate flyover crossing, grade crossing, safety facilities, service facilities, management facilities greening and other off-line engineering. 1.0.6 Highway construction must follow the national environmental protection and resource conservation laws and regulations and shall meet the following requirements: 1 Environmental protection for highway shall follow the principle of "comprehensive treatment taking priority of prevention over treatment". 2 Greening, beautifying and environmental protection shall be carried out for highway construction according to natural conditions. 3 Environmental impact assessment and water and soil conservation program assessment shall be carried out for expressway, Grade I and Grade II highways and highway construction project with special requirements. 4 Environmental protection design shall be carried out in the areas with fragile ecological environment or in the areas hard to be recovered in short term due to highway construction. 5 Engineering construction resources shall be saved by making the best of highway waste and scrap in highway reconstruction & extension project. 1.0.7 Overall design must be carried out in the principle of overall planning and phased implementation for highway construction by phases which shall meet the following requirements: 1 Advance engineering shall be made the best of in later stage. 2 Expressway section with integral-type cross-section shall not be constructed transversely by breadths or by stages. 3 Expressway section with separate cross-section may be constructed by breadths or by stages; the breadth earlier constructed shall be administrated according to conditions of Grade II highway open to traffic when it is open to traffic as two-way traffic. 1.0.8 During highway reconstruction & extension, demonstration, comparison and selection shall be carried out construction, reconstruction and extension schemes. Reconstruction and extension schemes, if adopted, shall meet the following requirements:
Contents of JTG B01-2014
Contents 1 General Provisions 2 Terminologies 3 Basic Requirements 3.1 Highway Grading 3.2 Design Vehicle 3.3 Traffic Volume 3.4 Level of Service 3.5 Speed 3.6 Construction Gauge 3.7 Seismic Design 4 Route 5 Subgrade and Pavement 6 Bridge and Culvert 7 Vehicle and Crowd Load 8 Tunnels 9 Route Crossing 9.1 Highway and Highway Grade Crossing 9.2 Highway and Highway Flyover Crossing 9.3 Highway and Railway Crossing 9.4 Highway and Rural Road Crossing 9.5 Crossing of Highway and Pipeline and Others 9.6 Animal Passage 10 Traffic Engineering and Roadside Facilities 10.1 General Requirements 10.2 Traffic Safety Facilities 10.3 Service Facilities 10.4 Management Facilities Appendix A Classification of Highway Service Level Appendix B Stopping Sight Distance of Trucks and Identifying Sight Distance Explanation of Wording
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
JTG B01-2014, JTG/T B01-2014, JTGT B01-2014, JTGB01-2014, JTG B01, JTGB01, JTG/TB01-2014, JTG/T B01, JTG/TB01, JTGTB01-2014, JTGT B01, JTGTB01