2023-6-1 3.235.147.50
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SH/T 3528-2005
SH/T 3528-2005   Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry (English Version)
Standard No.: SH/T 3528-2005 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 15000 words Price(USD):370.0 remind me the price change

Email:

Implemented on:2006-7-1 Delivery: via email in 1 business day
,,
Standard No.: SH/T 3528-2005
English Name: Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry
Chinese Name: 石油化工钢储罐地基与基础施工及验收规范
Chinese Classification: P72    Petrochemical and chemical industry engineering
Professional Classification: SH    Professional Standard - Petrochemical
ICS Classification: 93.02 93.02    Earthworks. Excavations. Foundation construction. Underground works 93.02
Issued by: NDRC
Issued on: 2006-1-17
Implemented on: 2006-7-1
Status: superseded
Superseded by:SH/T 3528-2014 Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry
Superseded on:2014-11-1
Superseding:SH 3528-1993 Code for construction and acceptance of petrochemical steel storage tank subgrade and forndation
Language: English
File Format: PDF
Word Count: 15000 words
Price(USD): 370.0
Delivery: via email in 1 business day
This specification specifies requirements for observation and acceptance of the foundation treatment, foundation construction and foundation settlement. It is applicable to the construction and acceptance of vertical cylindrical steel storage tank subgrade and foundation but not applicable to the construction and acceptance of low temperature and low pressure steel storage tank foundation and steel storage tank foundation whose medium temperature is higher than 95℃.
Foreword III 1 Scope 2 Normative References 3 Subgrade and Foundation Construction 3.1 General Requirements 3.2 Earth Excavation and Backfilling 3.3 Sand (Stone Chip) Cushion 3.4 Bituminous-sand Insulating Layer 3.5 Reinforced Concrete Ring Wall (Ring Beam) 3.6 Apron, Slope protection and Final Encapsulation 4 Foundation Treatment 4.1 Plain Soil Foundation 4.2 Lime Soil Foundation 4.3 Sand and Sandstone Foundation 4.4 Dynamic Consolidation Foundation 4.5 Stone Chip Foundation 4.6 Graded Crushed Stone Foundation 4.7 Sand Pile 4.8 Vibroflotation Foundation 5 Water-filling Preloading Foundation 5.1 General Requirements 5.2 Water-filling Preloading 6 Pile Foundation 6.1 General Requirements 6.2 Reinforced Concrete Driven Pile 6.3 Bored Concrete Pile 6.4 Inspection and Acceptance of Pile Foundation 7 Settlement Observation of Tank Foundation 7.1 General Requirements 7.2 Water-filling Preloading Foundation 7.3 Non-water-filling Preloading Foundation 7.4 Settlement Observation Result 8 Restoration of Tank Foundation 9 Acceptance of Tank Foundation Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H Explanation of Wording
Referred in SH/T 3528-2005:
*GB 50204-2015 Code for acceptance of constructional quallty of concrete structures
*JGJ 94-2008 Technical Code for Building Pile Foundations
*JGJ 104-1997 Specification for winter construction of building engineering
*SH 3503-2001 Regulation of Technical Document for Construction Completion of Petrochemical Industry Project
*SH3505-
Code of China
Standard
SH/T 3528-2005  Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry (English Version)
Standard No.SH/T 3528-2005
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count15000 words
Price(USD)370.0
Implemented on2006-7-1
Deliveryvia email in 1 business day
Detail of SH/T 3528-2005
Standard No.
SH/T 3528-2005
English Name
Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry
Chinese Name
石油化工钢储罐地基与基础施工及验收规范
Chinese Classification
P72
Professional Classification
SH
ICS Classification
Issued by
NDRC
Issued on
2006-1-17
Implemented on
2006-7-1
Status
superseded
Superseded by
SH/T 3528-2014 Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry
Superseded on
2014-11-1
Abolished on
Superseding
SH 3528-1993 Code for construction and acceptance of petrochemical steel storage tank subgrade and forndation
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
370.0
Keywords
SH/T 3528-2005, SH 3528-2005, SHT 3528-2005, SH/T3528-2005, SH/T 3528, SH/T3528, SH3528-2005, SH 3528, SH3528, SHT3528-2005, SHT 3528, SHT3528
Introduction of SH/T 3528-2005
This specification specifies requirements for observation and acceptance of the foundation treatment, foundation construction and foundation settlement. It is applicable to the construction and acceptance of vertical cylindrical steel storage tank subgrade and foundation but not applicable to the construction and acceptance of low temperature and low pressure steel storage tank foundation and steel storage tank foundation whose medium temperature is higher than 95℃.
Contents of SH/T 3528-2005
Foreword III 1 Scope 2 Normative References 3 Subgrade and Foundation Construction 3.1 General Requirements 3.2 Earth Excavation and Backfilling 3.3 Sand (Stone Chip) Cushion 3.4 Bituminous-sand Insulating Layer 3.5 Reinforced Concrete Ring Wall (Ring Beam) 3.6 Apron, Slope protection and Final Encapsulation 4 Foundation Treatment 4.1 Plain Soil Foundation 4.2 Lime Soil Foundation 4.3 Sand and Sandstone Foundation 4.4 Dynamic Consolidation Foundation 4.5 Stone Chip Foundation 4.6 Graded Crushed Stone Foundation 4.7 Sand Pile 4.8 Vibroflotation Foundation 5 Water-filling Preloading Foundation 5.1 General Requirements 5.2 Water-filling Preloading 6 Pile Foundation 6.1 General Requirements 6.2 Reinforced Concrete Driven Pile 6.3 Bored Concrete Pile 6.4 Inspection and Acceptance of Pile Foundation 7 Settlement Observation of Tank Foundation 7.1 General Requirements 7.2 Water-filling Preloading Foundation 7.3 Non-water-filling Preloading Foundation 7.4 Settlement Observation Result 8 Restoration of Tank Foundation 9 Acceptance of Tank Foundation Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Appendix H Explanation of Wording
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Foryou Tech Co., Ltd. 2008-2040
 
 
Keywords:
SH/T 3528-2005, SH 3528-2005, SHT 3528-2005, SH/T3528-2005, SH/T 3528, SH/T3528, SH3528-2005, SH 3528, SH3528, SHT3528-2005, SHT 3528, SHT3528