SY/T 0460-2010   Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities (English Version)
Standard No.: SY/T 0460-2010 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 20000 words Price(USD):400.0 remind me the price change

Email:

Implemented on:2010-12-15 Delivery: via email in 1 business day
,,
Standard No.: SY/T 0460-2010
English Name: Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
Chinese Name: 天然气净化装置设备与管道安装工程施工技术规范
Professional Classification: SY    Professional Standard - Oil & Gas
Issued by: National Energy Administration
Issued on: 2010-8-27
Implemented on: 2010-12-15
Status: superseded
Superseded by:SY/T 0460-2018 Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
Superseded on:2019-3-1
Superseding:SY/T 0460-2000 Specification for application and acceptance of equipment and pipeline installation engineering in natural gas purifying plant
Language: English
File Format: PDF
Word Count: 20000 words
Price(USD): 400.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated for the purpose of guaranteeing the construction quality of equipment and piping installation engineering for natural gas conditioning purification facilities and of making the installation engineering achieving advanced technology, economic rationality, safety and usability and reliable quality. 1.0.2 This code is applicable to the construction of the constructed, extended and renovated equipment and piping installation engineering for natural gas conditioning purification facilities. It is not applicable to the construction of the installation engineering of such purification facility technologies contacting with highly hydrogen sulfide gas (volume fraction of H2S in natural gas is larger than or equal to 5%) medium. 1.0.3 This code emphasizes the acceptance, storage, designation and dispensing of equipment and material, and strengthens the requirements on the assembling, welding and inspection of piping components, the purge and pressure test of piping system, and the final test. 1.0.4 In addition to this code, the construction of the equipment and piping installation engineering for natural gas conditioning purification facilities still shall meet those specified in the relevant current codes of the State. 2 Terms 2.0.1 Piping components The elements used for connecting or assembling pipeline, including: pipe, pipe fittings, flange, gasket, fastening piece, valve, expansion joint, flexible joint, pressure hose, and the in-line filter directly installed on the pipeline, etc. 2.0.2 Piping system It is the generic term of the connected piping system composed of pipeline, valve, filter, flowmeter and regulating valve, etc. 2.0.3 Single pipe axonometrical drawing The drawing showing the space of a certain pipeline and its components by using axonometric method, on which the spatial dimension of this pipeline, the specification, type and quantity of piping components, the code, quantity and detection method of weld crater, and the other technical requirements of pipeline are indicated. 2.0.4 Skid It is a combination of one or more functions by assembling one or more equipments, pipeline systems, instrument control systems and electrical systems on one common base. 2.0.5 Natural gas conditioning The technological process, during which the natural gas is desulfurized (decarburizd) and dehydrated, and the acid gas is treated. 2.0.6 Process unit The assembly composed of the production unit that at least completes one product or intermediate product according to the production flow, as well as the storage facilities and buildings (structures), for instance, desulfurization (decarburization) facility, sulfur recovery facility and tail gas cleanup unit, etc. 2.0.7 Semi-quantitative analysis of spectral Generally, the spectral line intensity (blackness) comparison method is adopted. The tested elements are prepared into standard series, the test sample and standard sample are placed on one same piece of spectrum plate under the same conditions, then the blackness of the sensitive line of tested element shall be compared with the blackness of this spectral line in standard sample on one spectrum projector, and the approximate content of this element in the test sample can be obtained. 3 Site Acceptance and Storage of Equipment and Material 3.1 General Requirement 3.1.1 The acceptance of equipment and material shall be carried out by the purchasing organization jointly with the professional representatives of development, supervision and construction organizations concerned, and the acceptance record shall be filled after completing the acceptance. 3.1.2 The field inspection and acceptance of equipment shall be carried out according to the list of arrivals, manufacturing drawing and contract document, the relevant technical documents, the quality proof documents, the supervision inspection certificate of special equipment, the parts and spare parts and the special tools shall be inspected, and the equipment shall be checked for its appearance and structural dimension, and the acceptance record shall be filled finally. 3.1.3 As for the field inspection of piping components, the material, specification, type, quality certificate, installation and operation instruction, appearance quality and necessary dimensions of the piping components shall be inspected for acceptance according to the requirements of design document or contract document. 3.1.4 The skid shall be inspected for acceptance according to the list of arrivals, manufacturing drawing and contract document, its spare products and parts, special tools, to-be-assembled electrical instruments and accessories shall be checked, and its appearance quality and necessary installation dimensions shall be inspected item by item. 3.1.5 For all the materials having sampling inspection as required, if any one is unqualified, the doubled amount of samples must be randomly inspected; if there still are unqualified ones, this batch of materials will not be used, and the designation and isolation shall be done well.
1 General Provisions 2 Terms 3 Site Acceptance and Storage of Equipment and Material 3.1 General Requirement 3.2 Acceptance and Storage of Piping Components 3.3 Acceptance and Storage of Rotating Equipment 3.4 Acceptance and Storage of Static Equipment 3.5 Acceptance and Storage of Skid 3.6 Other Materials 4 Installation of Equipment and Skid 4.1 General Requirement 4.2 Installation of Static Equipment and Skid 4.3 Installation of Tower 4.4 Installation of Rotating Equipment 5 Lining and Brickwork Furnaces 5.1 General Requirement 5.2 Lining 5.3 Brickwork Furnaces 5.4 Construction in Winter 5.5 Furnace Baking 6 Installation of Torch, Tail Gas Funnel and Tower Frame 6.1 Manufacture 6.2 Installation 6.3 Painting 7 Installation of Process Pipeline 7.1 General Requirement 7.2 Installation of Process Piping System 7.3 Installation of Buried Pipeline 7.4 Manufacture and Installation of Clip Casing 7.5 Manufacture and Installation of Pipeline Fittings 8 Welding and Heat Treatment 8.1 General Requirement 8.2 Welding 8.3 Heat Treatment after Welding 8.4 Welding Inspection 9 Purge, Cleaning and Pressure Test of Equipment and Process Piping System 9.1 General Requirement 9.2 Cleaning and Closing of Equipment 9.3 Purge and Cleaning of Process Piping System 9.4 Pressure Test of Equipment and Piping System 10 External Coating Work of Equipment and Pipeline 11 Thermal Insulation Work 12 Single Equipment Test-run 13 Work Handing-over Explanation of Wording in this Code Normative Standards
Referred in SY/T 0460-2010:
*GB 50126-2008 Code for construction of industrial equipment and pipeline insulation engineering
*GB 50205-2001 Code for acceptance of construction quality of steel structures
*GB 50211-2014 Code for construction and acceptance of industrial furnaces building
*GB 50231-2009 General code for construction and acceptance of mechanical equipment installation engineering
*GB 50235-2010 Code for construction of industrial metallic piping engineering
*GB 50236-2011 Code for Construction of Field Equipment, Industrial Pipe Welding Engineering
*GB 50270-2010 Code for Construction and Acceptance of Conveyor Equipment Installation Engineering
*GB 50275-2010 Code for construction and acceptance of computer, fan and pump installation engineering
*GB 50540-2009 Code for construction of pipe process in oil and gas transmission pipeline station
*SY/T 0043-2006 Standard for painting color of pinelines and equipments in oil-gas field
*SY/T 0407-97 Specification of steel surface preparation before application of paint
*SY/T 0452-2012 Standard for welding procedure qualification of oil and gas metal pipeline
*JB 4730-1994 Nondestructive Testing of Pressure Vessels
*SH/T 3115-2000 Engineering specification for light weight castable lining in petrochemical tubular fired heater
*-
*SH/T 3542-2007 Construction technical procedure for petrochemical static equipment installation work
SY/T 0460-2010 is referred in:
* SY 4209-2008 Code for Quality Acceptance of Oil and Gas Construction Engineering - Natural Gas Conditioning Plant
* SY 4118-2010 Technical Code for Construction of Gathering and Transmission Distributing Station Projects in Highly Hydrogen Sulfide Gas Field
* SY 4209-2008 Code for Quality Acceptance of Oil and Gas Construction Engineering - Natural Gas Conditioning Plant
Code of China
Standard
SY/T 0460-2010  Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities (English Version)
Standard No.SY/T 0460-2010
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count20000 words
Price(USD)400.0
Implemented on2010-12-15
Deliveryvia email in 1 business day
Detail of SY/T 0460-2010
Standard No.
SY/T 0460-2010
English Name
Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
Chinese Name
天然气净化装置设备与管道安装工程施工技术规范
Chinese Classification
Professional Classification
SY
ICS Classification
Issued by
National Energy Administration
Issued on
2010-8-27
Implemented on
2010-12-15
Status
superseded
Superseded by
SY/T 0460-2018 Technical code for construction of equipment and piping installation engineering for natural gas conditioning purification facilities
Superseded on
2019-3-1
Abolished on
Superseding
SY/T 0460-2000 Specification for application and acceptance of equipment and pipeline installation engineering in natural gas purifying plant
Language
English
File Format
PDF
Word Count
20000 words
Price(USD)
400.0
Keywords
SY/T 0460-2010, SY 0460-2010, SYT 0460-2010, SY/T0460-2010, SY/T 0460, SY/T0460, SY0460-2010, SY 0460, SY0460, SYT0460-2010, SYT 0460, SYT0460
Introduction of SY/T 0460-2010
1 General Provisions 1.0.1 This code is formulated for the purpose of guaranteeing the construction quality of equipment and piping installation engineering for natural gas conditioning purification facilities and of making the installation engineering achieving advanced technology, economic rationality, safety and usability and reliable quality. 1.0.2 This code is applicable to the construction of the constructed, extended and renovated equipment and piping installation engineering for natural gas conditioning purification facilities. It is not applicable to the construction of the installation engineering of such purification facility technologies contacting with highly hydrogen sulfide gas (volume fraction of H2S in natural gas is larger than or equal to 5%) medium. 1.0.3 This code emphasizes the acceptance, storage, designation and dispensing of equipment and material, and strengthens the requirements on the assembling, welding and inspection of piping components, the purge and pressure test of piping system, and the final test. 1.0.4 In addition to this code, the construction of the equipment and piping installation engineering for natural gas conditioning purification facilities still shall meet those specified in the relevant current codes of the State. 2 Terms 2.0.1 Piping components The elements used for connecting or assembling pipeline, including: pipe, pipe fittings, flange, gasket, fastening piece, valve, expansion joint, flexible joint, pressure hose, and the in-line filter directly installed on the pipeline, etc. 2.0.2 Piping system It is the generic term of the connected piping system composed of pipeline, valve, filter, flowmeter and regulating valve, etc. 2.0.3 Single pipe axonometrical drawing The drawing showing the space of a certain pipeline and its components by using axonometric method, on which the spatial dimension of this pipeline, the specification, type and quantity of piping components, the code, quantity and detection method of weld crater, and the other technical requirements of pipeline are indicated. 2.0.4 Skid It is a combination of one or more functions by assembling one or more equipments, pipeline systems, instrument control systems and electrical systems on one common base. 2.0.5 Natural gas conditioning The technological process, during which the natural gas is desulfurized (decarburizd) and dehydrated, and the acid gas is treated. 2.0.6 Process unit The assembly composed of the production unit that at least completes one product or intermediate product according to the production flow, as well as the storage facilities and buildings (structures), for instance, desulfurization (decarburization) facility, sulfur recovery facility and tail gas cleanup unit, etc. 2.0.7 Semi-quantitative analysis of spectral Generally, the spectral line intensity (blackness) comparison method is adopted. The tested elements are prepared into standard series, the test sample and standard sample are placed on one same piece of spectrum plate under the same conditions, then the blackness of the sensitive line of tested element shall be compared with the blackness of this spectral line in standard sample on one spectrum projector, and the approximate content of this element in the test sample can be obtained. 3 Site Acceptance and Storage of Equipment and Material 3.1 General Requirement 3.1.1 The acceptance of equipment and material shall be carried out by the purchasing organization jointly with the professional representatives of development, supervision and construction organizations concerned, and the acceptance record shall be filled after completing the acceptance. 3.1.2 The field inspection and acceptance of equipment shall be carried out according to the list of arrivals, manufacturing drawing and contract document, the relevant technical documents, the quality proof documents, the supervision inspection certificate of special equipment, the parts and spare parts and the special tools shall be inspected, and the equipment shall be checked for its appearance and structural dimension, and the acceptance record shall be filled finally. 3.1.3 As for the field inspection of piping components, the material, specification, type, quality certificate, installation and operation instruction, appearance quality and necessary dimensions of the piping components shall be inspected for acceptance according to the requirements of design document or contract document. 3.1.4 The skid shall be inspected for acceptance according to the list of arrivals, manufacturing drawing and contract document, its spare products and parts, special tools, to-be-assembled electrical instruments and accessories shall be checked, and its appearance quality and necessary installation dimensions shall be inspected item by item. 3.1.5 For all the materials having sampling inspection as required, if any one is unqualified, the doubled amount of samples must be randomly inspected; if there still are unqualified ones, this batch of materials will not be used, and the designation and isolation shall be done well.
Contents of SY/T 0460-2010
1 General Provisions 2 Terms 3 Site Acceptance and Storage of Equipment and Material 3.1 General Requirement 3.2 Acceptance and Storage of Piping Components 3.3 Acceptance and Storage of Rotating Equipment 3.4 Acceptance and Storage of Static Equipment 3.5 Acceptance and Storage of Skid 3.6 Other Materials 4 Installation of Equipment and Skid 4.1 General Requirement 4.2 Installation of Static Equipment and Skid 4.3 Installation of Tower 4.4 Installation of Rotating Equipment 5 Lining and Brickwork Furnaces 5.1 General Requirement 5.2 Lining 5.3 Brickwork Furnaces 5.4 Construction in Winter 5.5 Furnace Baking 6 Installation of Torch, Tail Gas Funnel and Tower Frame 6.1 Manufacture 6.2 Installation 6.3 Painting 7 Installation of Process Pipeline 7.1 General Requirement 7.2 Installation of Process Piping System 7.3 Installation of Buried Pipeline 7.4 Manufacture and Installation of Clip Casing 7.5 Manufacture and Installation of Pipeline Fittings 8 Welding and Heat Treatment 8.1 General Requirement 8.2 Welding 8.3 Heat Treatment after Welding 8.4 Welding Inspection 9 Purge, Cleaning and Pressure Test of Equipment and Process Piping System 9.1 General Requirement 9.2 Cleaning and Closing of Equipment 9.3 Purge and Cleaning of Process Piping System 9.4 Pressure Test of Equipment and Piping System 10 External Coating Work of Equipment and Pipeline 11 Thermal Insulation Work 12 Single Equipment Test-run 13 Work Handing-over Explanation of Wording in this Code Normative Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
SY/T 0460-2010, SY 0460-2010, SYT 0460-2010, SY/T0460-2010, SY/T 0460, SY/T0460, SY0460-2010, SY 0460, SY0460, SYT0460-2010, SYT 0460, SYT0460