2025-12-6 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/CJJ 11-2011
CJJ 11-2011   Code for design of the municipal bridge (English Version)
Standard No.: CJJ 11-2011 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 15000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on:2012-4-1 Delivery: via email in 1 business day

→ → →

,,2012-4-1,14113773284001E9F68F024252C32
Standard No.: CJJ 11-2011
English Name: Code for design of the municipal bridge
Chinese Name: 城市桥梁设计规范
Professional Classification: CJ    Professional Standard - Urban Construction
Source Content Issued by: MOC
Issued on: 2011-4-22
Implemented on: 2012-4-1
Status: valid
Superseding:CJJ 11-1993
Target Language: English
File Format: PDF
Word Count: 15000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with view to making the design of municipal bridge comply with the requirements of safety and reliability, applicability and endurance, advanced technology, economy and rationality and environmental coordination. 1.0.2 This code is applicable to the design of newly-built permanent bridge and underpass on urban roads, and the design of those on town (village) roads. 1.0.3 The municipal bridge shall be designed following the principle of being conducive to resource conservation, environmental protection, flood control and rescue and earthquake relief based on the road class determined according to urban and rural planning and the development demand of urban traffic. 1.0.4 The design of municipal bridge shall not only meet the requirements stipulated in this code, but also comply with those in the current relevant ones of the nation. 2 Terms and Symbols 2.1 Terms 2.1.1 Reliability The capacity of structure completing intended function under specified conditions within the specified time. 2.1.2 Degree of reliability The probability of structure completing intended function under specified conditions within the specified time. 2.1.3 Design flood frequency The monochronic average time interval of the flood of certain strength is adopted as the flood recurrence interval in the design, and its reciprocal is regarded as the flood frequency. 2.1.4 Design period The time parameter selected to determine the value of variable action and time-dependent material performance during the structural reliability analysis. 2.1.5 Design working life The service life for intended purpose of the structure or structural member without being overhauled, as specified in the design. 2.1.6 Action (load) The concentrated force or distributed force (direct action, also known as load) imposed on structure and the cause for imposed deformation or constrained deformation (indirect action) of structure. 2.1.7 Permanent action The action with the quantity not varying with time during the structure use period, or of which the variation may be neglected compared with the average. 2.1.8 Variable action The action with the quantity varying with time during the structure use period, or of which the variation may not be neglected compared with the average. 2.1.9 Accidental action The action with little occurrence probability during the structure use period, but once occurs, it will have a significant value and short duration. 2.1.10 Effect of action The reaction of structure or structural member caused by action, such as internal force, deformation, crack and etc. 2.1.11 Combination for action effects The random superposition of effects respectively generated by several actions on the structure or structural member. 2.1.12 Design situation A group of physical conditions representing a certain time interval. The structure shall live up to not exceeding the related limit state in the design. 2.1.13 Limit state A certain functional requirement specified in the design that the structure or member fails to meet when exceeding specific state, such state is the limit state of this function.
Foreword I 1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 4 Bridge Site Arrangement 5 Clearance above Bridge Deck 6 Horizontal Alignment, Vertical Alignment and Cross Section of Bridge Deck 7 Road Approach and Bridge Approach 8 Grade Separation Junction, Viaduct and Underpass 8.1 General Requirements 8.2 Grade Separation Junction and Viaduct 8.3 Underpass 9 Bridge Detail Structures and Attachments 9.1 Bridge Deck Pavement 9.2 Drainage and Waterproofing Design of Bridge Deck and Underpass 9.3 Bridge Expansion Joints 9.4 Bridge Bearing 9.5 Bridge Railing 9.6 Lighting, Energy Saving and Environmental Protection 9.7 Other Attachments 10 Loads on Bridge Appendix A Special Loads and Structure Checking Explanation of Wording in This Code List of Quoted Standards
Code of China
Standard
CJJ 11-2011  Code for design of the municipal bridge (English Version)
Standard No.CJJ 11-2011
Statusvalid
LanguageEnglish
File FormatPDF
Word Count15000 words
Price(USD)300.0
Implemented on2012-4-1
Deliveryvia email in 1 business day
Detail of CJJ 11-2011
Standard No.
CJJ 11-2011
English Name
Code for design of the municipal bridge
Chinese Name
城市桥梁设计规范
Chinese Classification
Professional Classification
CJ
ICS Classification
Issued by
MOC
Issued on
2011-4-22
Implemented on
2012-4-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
CJJ 11-1993
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
300.0
Keywords
CJJ 11-2011, CJJ/T 11-2011, CJJT 11-2011, CJJ11-2011, CJJ 11, CJJ11, CJJ/T11-2011, CJJ/T 11, CJJ/T11, CJJT11-2011, CJJT 11, CJJT11
Introduction of CJJ 11-2011
1.0.1 This code is formulated with view to making the design of municipal bridge comply with the requirements of safety and reliability, applicability and endurance, advanced technology, economy and rationality and environmental coordination. 1.0.2 This code is applicable to the design of newly-built permanent bridge and underpass on urban roads, and the design of those on town (village) roads. 1.0.3 The municipal bridge shall be designed following the principle of being conducive to resource conservation, environmental protection, flood control and rescue and earthquake relief based on the road class determined according to urban and rural planning and the development demand of urban traffic. 1.0.4 The design of municipal bridge shall not only meet the requirements stipulated in this code, but also comply with those in the current relevant ones of the nation. 2 Terms and Symbols 2.1 Terms 2.1.1 Reliability The capacity of structure completing intended function under specified conditions within the specified time. 2.1.2 Degree of reliability The probability of structure completing intended function under specified conditions within the specified time. 2.1.3 Design flood frequency The monochronic average time interval of the flood of certain strength is adopted as the flood recurrence interval in the design, and its reciprocal is regarded as the flood frequency. 2.1.4 Design period The time parameter selected to determine the value of variable action and time-dependent material performance during the structural reliability analysis. 2.1.5 Design working life The service life for intended purpose of the structure or structural member without being overhauled, as specified in the design. 2.1.6 Action (load) The concentrated force or distributed force (direct action, also known as load) imposed on structure and the cause for imposed deformation or constrained deformation (indirect action) of structure. 2.1.7 Permanent action The action with the quantity not varying with time during the structure use period, or of which the variation may be neglected compared with the average. 2.1.8 Variable action The action with the quantity varying with time during the structure use period, or of which the variation may not be neglected compared with the average. 2.1.9 Accidental action The action with little occurrence probability during the structure use period, but once occurs, it will have a significant value and short duration. 2.1.10 Effect of action The reaction of structure or structural member caused by action, such as internal force, deformation, crack and etc. 2.1.11 Combination for action effects The random superposition of effects respectively generated by several actions on the structure or structural member. 2.1.12 Design situation A group of physical conditions representing a certain time interval. The structure shall live up to not exceeding the related limit state in the design. 2.1.13 Limit state A certain functional requirement specified in the design that the structure or member fails to meet when exceeding specific state, such state is the limit state of this function.
Contents of CJJ 11-2011
Foreword I 1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 4 Bridge Site Arrangement 5 Clearance above Bridge Deck 6 Horizontal Alignment, Vertical Alignment and Cross Section of Bridge Deck 7 Road Approach and Bridge Approach 8 Grade Separation Junction, Viaduct and Underpass 8.1 General Requirements 8.2 Grade Separation Junction and Viaduct 8.3 Underpass 9 Bridge Detail Structures and Attachments 9.1 Bridge Deck Pavement 9.2 Drainage and Waterproofing Design of Bridge Deck and Underpass 9.3 Bridge Expansion Joints 9.4 Bridge Bearing 9.5 Bridge Railing 9.6 Lighting, Energy Saving and Environmental Protection 9.7 Other Attachments 10 Loads on Bridge Appendix A Special Loads and Structure Checking Explanation of Wording in This Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
CJJ 11-2011, CJJ/T 11-2011, CJJT 11-2011, CJJ11-2011, CJJ 11, CJJ11, CJJ/T11-2011, CJJ/T 11, CJJ/T11, CJJT11-2011, CJJT 11, CJJT11