CQC-C0302-2014 IMPLEMENTATION REGULATION ON COMPULSORY PRODUCT CERTIFICATION Low Voltage Apparatus – Low-voltage Components and Elements (English Version)
0. Terms and Definitions
Testing at Manufacturer's Premises (Hereinafter Referred to as TMP)
Designated certification body dispatches qualified engineer from designated laboratory to conduct testing with the testing equipment of factory laboratory, and the factory shall dispatch testing personnel to assist. Relevant designated laboratory shall be responsible for approval and issuing of testing report.
Witnessed Manufacturer's Testing (Hereinafter Referred to as WMT)
Qualified engineers of designated laboratory appointed by the designated certification body witness the testing conditions of factory laboratory and all the tests completed by the factory laboratory with its own equipment, or witness partial testing conditions and inspection items about the testing scheme submitted by the factory to the certification body. Testing personnel of the factory laboratory are responsible for issuing original records and drafting testing report with the designated laboratory engineer according to the prescribed format. Testing report will be examined, approved and issued by designated laboratory concerned.
1. Application Scope
Implementation Regulation on Low-voltage Apparatus - Low-voltage Components and Elements (hereinafter referred to as the Regulation) was prepared as per the requirements of "Implementation Rule on Compulsory Certification (CNCA-C03-02: 2014) (hereinafter referred to as the Rule); as an auxiliary document for certification implementation rules, it works together with the Rule.
Product range and certification basis applicable for the Regulation shall comply with relevant provisions in the Implementation Rule and shall be adapted in accordance with announcements on the definition and adjustment of contents issued by the Certification and Accreditation Administration of the People's Republic of China (hereinafter referred to as “CNCA”)
CQC, under the principles of maintaining the product certification validity, promoting product quality, serving certification industry and controlling certification risk, etc., formulates and issues the certification implementation regulations according to the requirements of certification implementation rules, establishes the manufacturer's classification management requirements and specifies the implementation requirements of product certification of low-voltage components and elements by combining the classification of manufacturers.
2. Certification Basis
See Article 2 of the Implementation Rule.
3. Certification Mode
Optional certification modes for switchgear and control gear of low voltage apparatus and the protection equipment for complete machines:
Mode 1: type test + post-certification supervision.
Mode 2: type test + initial factory inspection + post-certification supervision.
The post-certification supervision above refers to one of or the combination of the three modes, i.e. post-certification follow-up inspection, sampling testing/inspection on production site and market sampling testing/inspection.
According to the product risk and in combination with classified management of manufacturers, specific requirements are as follows:
Contents
0. Terms and Definitions
1. Application Scope
2. Certification Basis
3. Certification Mode
4. Certification Unit Division
5. Certification Entrustment
5.1 Proposal and Acceptance of Certification Entrustment
5.2 Application Information
5.3 Implementation Arrangement
6 Certification Implementation
6.1 Type Test
6.1.1 Type Test Scheme
6.1.2 Requirements of Type Test Samples
6.1.3 Inspection Items for Type Test
6.1.4 Implementation of Type Test
6.1.5 Type Test Report
6.2 Certification Evaluation and Decision
6.3 Certification Time Limit
6.4 Initial Factory Inspection
6.4.1 Definition for Object and Requirements for Coverage of Factory Inspection
6.4.2 Factory Quality Assurance Capacity Inspection
6.4.3 Product Conformity Inspection
6.4.4 Inspection Time
6.4.5 Inspection Conclusion
7. Post-certification Supervision
7.1 Post-certification Follow-up Inspection
7.1.1 Principle
7.1.2 Contents
7.2 Sample Testing/Inspection on Production Site
7.2.1 Principle
7.2.2 Content
7.3 Market and/or User Sampling Testing or Inspection
7.3.1 Principle
7.3.2 Content
7.4 Post-certification Supervision Frequency and Time
7.5 Record of Post-certification Supervision
7.6 Assessment on Post-certification Supervision Result
8. Certificate
8.1 Certificate Maintenance
8.2 Change of Products Covered by Certificate
8.2.1 Change Application
8.2.2 Change Evaluation and Approval
8.2.3 Change Documentation
8.2.3.1 Requirements on Technical Director of Manufacturer
8.2.3.2 Management on Technical Director by Certification Body
8.3 Expansion of Products Covered by Certificate
8.4 Suspension, Cancellation and Revocation of Certificate
8.5 Use of Certificate
9. Certification Mark
10. Charge Basis and Requirements
11. Certification Responsibility
12. Principle for Manufacturer Classification
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Standard
CQC-C0302-2014 IMPLEMENTATION REGULATION ON COMPULSORY PRODUCT CERTIFICATION Low Voltage Apparatus – Low-voltage Components and Elements (English Version)
Standard No.
CQC-C0302-2014
Status
valid
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
370.0
Implemented on
2014-9-1
Delivery
via email in 1 business day
Detail of CQC-C0302-2014
Standard No.
CQC-C0302-2014
English Name
IMPLEMENTATION REGULATION ON COMPULSORY PRODUCT CERTIFICATION Low Voltage Apparatus – Low-voltage Components and Elements
Chinese Name
强制性产品认证实施细则 低压电器——低压元器件
Chinese Classification
Professional Classification
CQ
ICS Classification
Issued by
China Quality Certification Center
Issued on
2014-09-01
Implemented on
2014-9-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
370.0
Keywords
CQC-C0302-2014, , CQC-C0302-2014, CQC,
Introduction of CQC-C0302-2014
0. Terms and Definitions
Testing at Manufacturer's Premises (Hereinafter Referred to as TMP)
Designated certification body dispatches qualified engineer from designated laboratory to conduct testing with the testing equipment of factory laboratory, and the factory shall dispatch testing personnel to assist. Relevant designated laboratory shall be responsible for approval and issuing of testing report.
Witnessed Manufacturer's Testing (Hereinafter Referred to as WMT)
Qualified engineers of designated laboratory appointed by the designated certification body witness the testing conditions of factory laboratory and all the tests completed by the factory laboratory with its own equipment, or witness partial testing conditions and inspection items about the testing scheme submitted by the factory to the certification body. Testing personnel of the factory laboratory are responsible for issuing original records and drafting testing report with the designated laboratory engineer according to the prescribed format. Testing report will be examined, approved and issued by designated laboratory concerned.
1. Application Scope
Implementation Regulation on Low-voltage Apparatus - Low-voltage Components and Elements (hereinafter referred to as the Regulation) was prepared as per the requirements of "Implementation Rule on Compulsory Certification (CNCA-C03-02: 2014) (hereinafter referred to as the Rule); as an auxiliary document for certification implementation rules, it works together with the Rule.
Product range and certification basis applicable for the Regulation shall comply with relevant provisions in the Implementation Rule and shall be adapted in accordance with announcements on the definition and adjustment of contents issued by the Certification and Accreditation Administration of the People's Republic of China (hereinafter referred to as “CNCA”)
CQC, under the principles of maintaining the product certification validity, promoting product quality, serving certification industry and controlling certification risk, etc., formulates and issues the certification implementation regulations according to the requirements of certification implementation rules, establishes the manufacturer's classification management requirements and specifies the implementation requirements of product certification of low-voltage components and elements by combining the classification of manufacturers.
2. Certification Basis
See Article 2 of the Implementation Rule.
3. Certification Mode
Optional certification modes for switchgear and control gear of low voltage apparatus and the protection equipment for complete machines:
Mode 1: type test + post-certification supervision.
Mode 2: type test + initial factory inspection + post-certification supervision.
The post-certification supervision above refers to one of or the combination of the three modes, i.e. post-certification follow-up inspection, sampling testing/inspection on production site and market sampling testing/inspection.
According to the product risk and in combination with classified management of manufacturers, specific requirements are as follows:
Contents of CQC-C0302-2014
Contents
0. Terms and Definitions
1. Application Scope
2. Certification Basis
3. Certification Mode
4. Certification Unit Division
5. Certification Entrustment
5.1 Proposal and Acceptance of Certification Entrustment
5.2 Application Information
5.3 Implementation Arrangement
6 Certification Implementation
6.1 Type Test
6.1.1 Type Test Scheme
6.1.2 Requirements of Type Test Samples
6.1.3 Inspection Items for Type Test
6.1.4 Implementation of Type Test
6.1.5 Type Test Report
6.2 Certification Evaluation and Decision
6.3 Certification Time Limit
6.4 Initial Factory Inspection
6.4.1 Definition for Object and Requirements for Coverage of Factory Inspection
6.4.2 Factory Quality Assurance Capacity Inspection
6.4.3 Product Conformity Inspection
6.4.4 Inspection Time
6.4.5 Inspection Conclusion
7. Post-certification Supervision
7.1 Post-certification Follow-up Inspection
7.1.1 Principle
7.1.2 Contents
7.2 Sample Testing/Inspection on Production Site
7.2.1 Principle
7.2.2 Content
7.3 Market and/or User Sampling Testing or Inspection
7.3.1 Principle
7.3.2 Content
7.4 Post-certification Supervision Frequency and Time
7.5 Record of Post-certification Supervision
7.6 Assessment on Post-certification Supervision Result
8. Certificate
8.1 Certificate Maintenance
8.2 Change of Products Covered by Certificate
8.2.1 Change Application
8.2.2 Change Evaluation and Approval
8.2.3 Change Documentation
8.2.3.1 Requirements on Technical Director of Manufacturer
8.2.3.2 Management on Technical Director by Certification Body
8.3 Expansion of Products Covered by Certificate
8.4 Suspension, Cancellation and Revocation of Certificate
8.5 Use of Certificate
9. Certification Mark
10. Charge Basis and Requirements
11. Certification Responsibility
12. Principle for Manufacturer Classification
Appendix 1
Appendix 2
Appendix 3
Appendix 4