2025-12-15 10.1.14.108
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DB 11/1025-2013
DB 11/1025-2013   Code for Design, Construction and Acceptance of Natural Smoke Ventilation System (English Version)
Standard No.: DB 11/1025-2013 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 10,000 words Translation Price(USD):200.0 remind me the price change

Email:

Implemented on:2014-5-1 Delivery: via email in 1~3 business day

→ → →

,,2014-5-1,14113804315283134913C0FAE1189
Standard No.: DB 11/1025-2013
English Name: Code for Design, Construction and Acceptance of Natural Smoke Ventilation System
Chinese Name: 自然排烟系统设计、施工及验收规范
Professional Classification: DB    Provincial Standard
Source Content Issued by: Beijing Bureau of Quality and Technical Supervision
Issued on: 2014-5-1
Implemented on: 2014-5-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 10,000 words
Translation Price(USD): 200.0
Delivery: via email in 1~3 business day
1 General Provisions 1.0.1 This code is formulated in view of reasonably setting natural smoke ventilation system, standardizing such links as design, construction, acceptance and maintenance of natural smoke ventilation system, controlling the extension of smoke from building fire and protecting personal and property safety. 1.0.2 This code is applicable to the design, construction, acceptance and maintenance management for natural smoke ventilation system in constructed, reconstructed and extended civil building engineering. 1.0.3 Natural smoke ventilation system shall be designed according to the fire smoke flow characteristics from different building spaces by adopting reliable technical measures so as to achieve the purpose of safety and usability, advanced technology, economy and rationality. 1.0.4 The modules and components adopted for natural smoke ventilation system must satisfy the requirements of current national, professional and local standards. 1.0.5 The design, construction, commissioning and acceptance of natural smoke ventilation system shall comply with not only the requirements of this code but also those specified in relevant current national and Beijing standards. 2 Terms and Symbols 2.1 Terms 2.1.1 Automatic natural smoke ventilator Device capable of automatically opening through automatic fire alarm system linkage control and exhausting the smog and hot smoke in case of a fire. Automatic natural smoke ventilator may be classified into split natural smoke ventilator, single-opening natural smoke ventilator and louver natural smoke ventilator by ventilator style. 2.1.2 Natural smoke ventilation system Smoke ventilation system consisting of such devices as pivoted external window, ventilating louver or automatic natural smoke ventilator connecting outside of building and relevant modules and exhausting the fire smoke out of the building by using the flotage of fire hot smoke airflow and the outside wind action. 2.1.3 Smoke vent opening The part connecting the devices (including manual pivoted external window, fixed ventilating louver or automatic natural smoke ventilator which compose the natural smoke ventilation system) to outdoor space. 2.1.4 Smoke barriers, smoke curtains Smoke blocking separate facilities made of incombustible material, vertically installed under building ceiling, cross beam or suspended ceiling and capable of forming certain smoke reserving space. 2.1.5 Depth of the smoke layer Design legible height necessary for satisfying personnel evacuation and depth of the smoke layer determined for ensuring the smoke ventilation effectiveness. 2.1.6 Smoke reservoir Space formed by smoke barriers (smoke curtains), structural beam and space building envelope on the top of the building and used for smoke accumulation. The height of smoke reservoir is the depth of the smoke layer. 2.2 Symbols H-the clearance height of building space, m; the height from building space ceiling or soffit to floor (ground); d-the depth of the smoke layer, m; the design depth of the smoke layer (smoke reservoir height) equals to the space clearance height subtracting the design legible height; z-the design legible height, m, which shall not be less than 1.8m. 3 System Design 3.1 General Regulation 3.1.1 Various building sites or parts provided with the conditions for natural smoke ventilation setting should adopt with natural smoke ventilation system. The following sites or parts shall not adopt with natural smoke ventilation system: 1 High rise building with building height exceeding 100m; 2 Inside walkway in such entertainment venues for singing, dancing and broadcasting as KTV, video hall, night club kara ok hull and game house with the length exceeding 40m; inside walkway in other buildings with the length exceeding 60m. 3.1.2 As for courtyard and such public sites with large space as business hall, exhibition hall, auditorium, theater, stage, gymnasium, passenger station and terminal with the building area larger than 500 m2 and building clearance height larger than 6m, where the natural smoke ventilation is adopted, automatic natural smoke ventilator or fixed shutter shall be arranged as the smoke vent opening modules. 3.1.3 Automatic natural smoke ventilator shall be linked to automatic fire alarm system. The design of automatic fire alarm system linked to automatic natural smoke ventilator shall meet the requirements of "Code for Design of Automatic Fire Alarm System" (GB 50116).
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 System Design 3.1 General Regulation 3.2 Design Requirement 3.3 Calculation Method 4 Essential Smoke Control Equipment 4.1 Automatic Natural Smoke Ventilator 4.2 Smoke Curtain 4.3 Fire-fighting Access Openings 5 Construction and Installation of System 6 Testing and Commissioning of System 7 Acceptance Criteria of System 8 Service and Management of System Explanation of Wording in This Code List of Quoted Standards
Code of China
Standard
DB 11/1025-2013  Code for Design, Construction and Acceptance of Natural Smoke Ventilation System (English Version)
Standard No.DB 11/1025-2013
Statusvalid
LanguageEnglish
File FormatPDF
Word Count10,000 words
Price(USD)200.0
Implemented on2014-5-1
Deliveryvia email in 1~3 business day
Detail of DB 11/1025-2013
Standard No.
DB 11/1025-2013
English Name
Code for Design, Construction and Acceptance of Natural Smoke Ventilation System
Chinese Name
自然排烟系统设计、施工及验收规范
Chinese Classification
Professional Classification
DB
ICS Classification
Issued by
Beijing Bureau of Quality and Technical Supervision
Issued on
2014-5-1
Implemented on
2014-5-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
10,000 words
Price(USD)
200.0
Keywords
DB 11/1025-2013, DBT 11/1025-2013, DBT 111025-2013, DB11/1025-2013, DB 11/1025, DB11/1025, DBT11/1025-2013, DBT 11/1025, DBT11/1025, DBT111025-2013, DBT 111025, DBT111025
Introduction of DB 11/1025-2013
1 General Provisions 1.0.1 This code is formulated in view of reasonably setting natural smoke ventilation system, standardizing such links as design, construction, acceptance and maintenance of natural smoke ventilation system, controlling the extension of smoke from building fire and protecting personal and property safety. 1.0.2 This code is applicable to the design, construction, acceptance and maintenance management for natural smoke ventilation system in constructed, reconstructed and extended civil building engineering. 1.0.3 Natural smoke ventilation system shall be designed according to the fire smoke flow characteristics from different building spaces by adopting reliable technical measures so as to achieve the purpose of safety and usability, advanced technology, economy and rationality. 1.0.4 The modules and components adopted for natural smoke ventilation system must satisfy the requirements of current national, professional and local standards. 1.0.5 The design, construction, commissioning and acceptance of natural smoke ventilation system shall comply with not only the requirements of this code but also those specified in relevant current national and Beijing standards. 2 Terms and Symbols 2.1 Terms 2.1.1 Automatic natural smoke ventilator Device capable of automatically opening through automatic fire alarm system linkage control and exhausting the smog and hot smoke in case of a fire. Automatic natural smoke ventilator may be classified into split natural smoke ventilator, single-opening natural smoke ventilator and louver natural smoke ventilator by ventilator style. 2.1.2 Natural smoke ventilation system Smoke ventilation system consisting of such devices as pivoted external window, ventilating louver or automatic natural smoke ventilator connecting outside of building and relevant modules and exhausting the fire smoke out of the building by using the flotage of fire hot smoke airflow and the outside wind action. 2.1.3 Smoke vent opening The part connecting the devices (including manual pivoted external window, fixed ventilating louver or automatic natural smoke ventilator which compose the natural smoke ventilation system) to outdoor space. 2.1.4 Smoke barriers, smoke curtains Smoke blocking separate facilities made of incombustible material, vertically installed under building ceiling, cross beam or suspended ceiling and capable of forming certain smoke reserving space. 2.1.5 Depth of the smoke layer Design legible height necessary for satisfying personnel evacuation and depth of the smoke layer determined for ensuring the smoke ventilation effectiveness. 2.1.6 Smoke reservoir Space formed by smoke barriers (smoke curtains), structural beam and space building envelope on the top of the building and used for smoke accumulation. The height of smoke reservoir is the depth of the smoke layer. 2.2 Symbols H-the clearance height of building space, m; the height from building space ceiling or soffit to floor (ground); d-the depth of the smoke layer, m; the design depth of the smoke layer (smoke reservoir height) equals to the space clearance height subtracting the design legible height; z-the design legible height, m, which shall not be less than 1.8m. 3 System Design 3.1 General Regulation 3.1.1 Various building sites or parts provided with the conditions for natural smoke ventilation setting should adopt with natural smoke ventilation system. The following sites or parts shall not adopt with natural smoke ventilation system: 1 High rise building with building height exceeding 100m; 2 Inside walkway in such entertainment venues for singing, dancing and broadcasting as KTV, video hall, night club kara ok hull and game house with the length exceeding 40m; inside walkway in other buildings with the length exceeding 60m. 3.1.2 As for courtyard and such public sites with large space as business hall, exhibition hall, auditorium, theater, stage, gymnasium, passenger station and terminal with the building area larger than 500 m2 and building clearance height larger than 6m, where the natural smoke ventilation is adopted, automatic natural smoke ventilator or fixed shutter shall be arranged as the smoke vent opening modules. 3.1.3 Automatic natural smoke ventilator shall be linked to automatic fire alarm system. The design of automatic fire alarm system linked to automatic natural smoke ventilator shall meet the requirements of "Code for Design of Automatic Fire Alarm System" (GB 50116).
Contents of DB 11/1025-2013
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 System Design 3.1 General Regulation 3.2 Design Requirement 3.3 Calculation Method 4 Essential Smoke Control Equipment 4.1 Automatic Natural Smoke Ventilator 4.2 Smoke Curtain 4.3 Fire-fighting Access Openings 5 Construction and Installation of System 6 Testing and Commissioning of System 7 Acceptance Criteria of System 8 Service and Management of System Explanation of Wording in This Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DB 11/1025-2013, DBT 11/1025-2013, DBT 111025-2013, DB11/1025-2013, DB 11/1025, DB11/1025, DBT11/1025-2013, DBT 11/1025, DBT11/1025, DBT111025-2013, DBT 111025, DBT111025