2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DB6101/T 3023-2018
DB6101/T 3023-2018   Code for design of medium capacity of straddle monorail transit (English Version)
Standard No.: DB6101/T 3023-2018 Status:abolished remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: Translation Price(USD): remind me the price change

Email:

Implemented on:2018-6-28 Delivery:

→ → →

2025-07-17 ,,2018-6-28,E6B4C1A54B7EFD9F1754793235987
Standard No.: DB6101/T 3023-2018
English Name: Code for design of medium capacity of straddle monorail transit
Chinese Name: 中运量跨座式单轨交通系统设计规范
Chinese Classification: P51    Urban traffic engineering
Professional Classification: DB    Provincial Standard
ICS Classification: 43.040.01 43.040.01    Road vehicle systems in general 43.040.01
Source Content Issued by: Xian Municipal Administration for Market Regulation
Issued on: 2018-06-08
Implemented on: 2018-6-28
Status: abolished
Abolished on:2025-07-17
Target Language: English
File Format: PDF
为合理设计中运量跨座式单轨交通工程,使其符合安全可靠、经济适用、功能完善、技术先进、节能环保等要求,制定本规范。
本规范适用于轨道梁宽度700mm,车辆构造速度不超过90km/h全封闭运营的中运量跨座式单轨交通新建工程设计。
中运量跨座式单轨交通工程的设计应符合政府主管部门批准的城市总体规划、城市轨道交通线网规划及近期建设规划,并应与城市综合交通规划相协调。
中运量跨座式单轨交通线路的功能定位、服务水平、系统运能及起讫点、车辆基地选址、主变电站及控制中心等资源共享,应依据远景线网规划确定。与其他交通系统间的衔接,应做到层次分明、衔接有序、换乘安全便捷。
工程的设计年限应分为初期、近期、远期。初期按建成通车后第3年确定,近期按建成通车后第10年确定,远期按建成通车后第25年确定。
工程建设规模、系统容量及设施用地应按预测的客流控制期客流量、系统能力确定,可分期建设的工程和可分期配置的设备,宜分期建设。
主体工程结构,以及因结构损坏或大修时对系统运营产生重大影响的其他工程结构的设计使用年限不应低于100年。
中运量跨座式单轨交通设计除应遵循本规范外,尚应符合国家现行有关标准的规定。
极端气候条件,轨道、道岔应设有防冻、融雪设施。
本规范适应西安饱和软黄土、湿陷性黄土、砂层等地质条件。
按相关规定对文物进行保护。
Code of China
Standard
DB6101/T 3023-2018  Code for design of medium capacity of straddle monorail transit (English Version)
Standard No.DB6101/T 3023-2018
Statusabolished
LanguageEnglish
File FormatPDF
Word Count words
Price(USD)
Implemented on2018-6-28
Deliveryvia email in business day
Detail of DB6101/T 3023-2018
Standard No.
DB6101/T 3023-2018
English Name
Code for design of medium capacity of straddle monorail transit
Chinese Name
中运量跨座式单轨交通系统设计规范
Chinese Classification
P51
Professional Classification
DB
ICS Classification
Issued by
Xian Municipal Administration for Market Regulation
Issued on
2018-06-08
Implemented on
2018-6-28
Status
abolished
Superseded by
Superseded on
Abolished on
2025-07-17
Superseding
Language
English
File Format
PDF
Word Count
words
Price(USD)
Keywords
DB6101/T 3023-2018, DB6101 3023-2018, DB6101T 3023-2018, DB6101/T3023-2018, DB6101/T 3023, DB6101/T3023, DB61013023-2018, DB6101 3023, DB61013023, DB6101T3023-2018, DB6101T 3023, DB6101T3023
Introduction of DB6101/T 3023-2018
为合理设计中运量跨座式单轨交通工程,使其符合安全可靠、经济适用、功能完善、技术先进、节能环保等要求,制定本规范。
本规范适用于轨道梁宽度700mm,车辆构造速度不超过90km/h全封闭运营的中运量跨座式单轨交通新建工程设计。
中运量跨座式单轨交通工程的设计应符合政府主管部门批准的城市总体规划、城市轨道交通线网规划及近期建设规划,并应与城市综合交通规划相协调。
中运量跨座式单轨交通线路的功能定位、服务水平、系统运能及起讫点、车辆基地选址、主变电站及控制中心等资源共享,应依据远景线网规划确定。与其他交通系统间的衔接,应做到层次分明、衔接有序、换乘安全便捷。
工程的设计年限应分为初期、近期、远期。初期按建成通车后第3年确定,近期按建成通车后第10年确定,远期按建成通车后第25年确定。
工程建设规模、系统容量及设施用地应按预测的客流控制期客流量、系统能力确定,可分期建设的工程和可分期配置的设备,宜分期建设。
主体工程结构,以及因结构损坏或大修时对系统运营产生重大影响的其他工程结构的设计使用年限不应低于100年。
中运量跨座式单轨交通设计除应遵循本规范外,尚应符合国家现行有关标准的规定。
极端气候条件,轨道、道岔应设有防冻、融雪设施。
本规范适应西安饱和软黄土、湿陷性黄土、砂层等地质条件。
按相关规定对文物进行保护。
Contents of DB6101/T 3023-2018
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DB6101/T 3023-2018, DB6101 3023-2018, DB6101T 3023-2018, DB6101/T3023-2018, DB6101/T 3023, DB6101/T3023, DB61013023-2018, DB6101 3023, DB61013023, DB6101T3023-2018, DB6101T 3023, DB6101T3023