2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL 5190.5-2012
DL 5190.5-2012   The specification of erection of electric power construction Part 5: Piping and system (English Version)
Standard No.: DL 5190.5-2012 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 16000 words Translation Price(USD):320.0 remind me the price change

Email:

Implemented on:2012-3-1 Delivery: via email in 1 business day

→ → →

,2019-10-1,2012-3-1,14113778648633FF78B64AB30EED9
Standard No.: DL 5190.5-2012
English Name: The specification of erection of electric power construction Part 5: Piping and system
Chinese Name: 电力建设施工技术规范 第5部分:管道及系统
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NEA
Issued on: 2012-1-4
Implemented on: 2012-3-1
Status: superseded
Superseded by:DL 5190.5-2019 Technical specification for thermal power erection and construction - Part 5: Piping and system
Superseded on:2019-10-1
Superseding:DL 5031-1994 The code of erection and acceptance for electirc power construction piping section
Target Language: English
File Format: PDF
Word Count: 16000 words
Translation Price(USD): 320.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This Part was revised with a view to strengthening the technical management of the pipe engineering construction and further improving the engineering quality. 1.0.2 This Part is applicable to the erection and construction of process pipes of the new-built, extended or reconstructed 1,000MW or below thermal power generation, gas turbine generation, biomass electric power generation and garbage power generation stations and the conventional islands of nuclear power. 1.0.3 This Part is not applicable to the process pipes made of the following materials: 1 Cast iron pipes and reinforced concrete pipes; 2 Nonmetallic pipe (plastics and glass reinforced plastic, etc.); 3 Non-ferrous metal pipe (titanium and copper, etc.); 4 Lined pipe; 5 Pipes of composite materials; 6 Pipes of other special materials. 1.0.4 In addition to complying with the technical requirements stated in this Part, the special erection and construction of various pipes also shall meet those specified in the relevant professional parts in the national standards and the "Technical Specification for Thermal Power Erection and Construction".
1 General Provisions 2 Terms 3 Basic Requirements 4 Inspection of Pipes, Pipe Fittings, Pipe Accessories and Valves 4.1 General Requirements 4.2 Inspection of Pipes 4.3 Inspection of Pipe Fittings 4.4 Inspection of Pipe Accessories 4.5 Factory Prefabrication of High Pressure Pipes 4.6 Inspection of Pipes after Factory Prefabrication 4.7 Inspection of Valves 5 Pipe Installation 5.1 General Requirements 5.2 Installation of High Pressure Pipes 5.3 Installation of Medium and Low Pressure Pipes 5.4 Installation of Drain and Discharge Pipes 5.5 Installation of Pipes with Φ76 and Below 5.6 Installation of Valves and Flanges 5.7 Installation of Supports and Hangers 6 Testing and Cleaning of Piping System 6.1 General Requirements 6.2 Leak Test of Piping System 6.3 Cleaning of Piping System 7 Project Documents Provided before Quality Acceptance Appendix A Requirement of Pipe Painting Color Appendix B Common Steels Data of Power Station Pipes Appendix C Material Selection of Flange Gaskets Appendix D Selection of Valve Seal Packing Appendix E Type and Gap of Common Pipe Groove Appendix F Installation Requirements of Oxygen and Acetylene Pipes Appendix G Calculation of Pipe Head Thickness Explanation of Wording in this Specification List of Quoted Standards
Code of China
Standard
DL 5190.5-2012  The specification of erection of electric power construction Part 5: Piping and system (English Version)
Standard No.DL 5190.5-2012
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count16000 words
Price(USD)320.0
Implemented on2012-3-1
Deliveryvia email in 1 business day
Detail of DL 5190.5-2012
Standard No.
DL 5190.5-2012
English Name
The specification of erection of electric power construction Part 5: Piping and system
Chinese Name
电力建设施工技术规范 第5部分:管道及系统
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
NEA
Issued on
2012-1-4
Implemented on
2012-3-1
Status
superseded
Superseded by
DL 5190.5-2019 Technical specification for thermal power erection and construction - Part 5: Piping and system
Superseded on
2019-10-1
Abolished on
Superseding
DL 5031-1994 The code of erection and acceptance for electirc power construction piping section
Language
English
File Format
PDF
Word Count
16000 words
Price(USD)
320.0
Keywords
DL 5190.5-2012, DL/T 5190.5-2012, DLT 5190.5-2012, DL5190.5-2012, DL 5190.5, DL5190.5, DL/T5190.5-2012, DL/T 5190.5, DL/T5190.5, DLT5190.5-2012, DLT 5190.5, DLT5190.5
Introduction of DL 5190.5-2012
1 General Provisions 1.0.1 This Part was revised with a view to strengthening the technical management of the pipe engineering construction and further improving the engineering quality. 1.0.2 This Part is applicable to the erection and construction of process pipes of the new-built, extended or reconstructed 1,000MW or below thermal power generation, gas turbine generation, biomass electric power generation and garbage power generation stations and the conventional islands of nuclear power. 1.0.3 This Part is not applicable to the process pipes made of the following materials: 1 Cast iron pipes and reinforced concrete pipes; 2 Nonmetallic pipe (plastics and glass reinforced plastic, etc.); 3 Non-ferrous metal pipe (titanium and copper, etc.); 4 Lined pipe; 5 Pipes of composite materials; 6 Pipes of other special materials. 1.0.4 In addition to complying with the technical requirements stated in this Part, the special erection and construction of various pipes also shall meet those specified in the relevant professional parts in the national standards and the "Technical Specification for Thermal Power Erection and Construction".
Contents of DL 5190.5-2012
1 General Provisions 2 Terms 3 Basic Requirements 4 Inspection of Pipes, Pipe Fittings, Pipe Accessories and Valves 4.1 General Requirements 4.2 Inspection of Pipes 4.3 Inspection of Pipe Fittings 4.4 Inspection of Pipe Accessories 4.5 Factory Prefabrication of High Pressure Pipes 4.6 Inspection of Pipes after Factory Prefabrication 4.7 Inspection of Valves 5 Pipe Installation 5.1 General Requirements 5.2 Installation of High Pressure Pipes 5.3 Installation of Medium and Low Pressure Pipes 5.4 Installation of Drain and Discharge Pipes 5.5 Installation of Pipes with Φ76 and Below 5.6 Installation of Valves and Flanges 5.7 Installation of Supports and Hangers 6 Testing and Cleaning of Piping System 6.1 General Requirements 6.2 Leak Test of Piping System 6.3 Cleaning of Piping System 7 Project Documents Provided before Quality Acceptance Appendix A Requirement of Pipe Painting Color Appendix B Common Steels Data of Power Station Pipes Appendix C Material Selection of Flange Gaskets Appendix D Selection of Valve Seal Packing Appendix E Type and Gap of Common Pipe Groove Appendix F Installation Requirements of Oxygen and Acetylene Pipes Appendix G Calculation of Pipe Head Thickness Explanation of Wording in this Specification List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL 5190.5-2012, DL/T 5190.5-2012, DLT 5190.5-2012, DL5190.5-2012, DL 5190.5, DL5190.5, DL/T5190.5-2012, DL/T 5190.5, DL/T5190.5, DLT5190.5-2012, DLT 5190.5, DLT5190.5