2025-6-16 18.97.14.84
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 1040-2007
DL/T 1040-2007   The grid operation code (English Version)
Standard No.: DL/T 1040-2007 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 30000 words Price(USD):750.0 remind me the price change

Email:

Implemented on:2007-12-1 Delivery: via email in 1 business day
,,
Standard No.: DL/T 1040-2007
English Name: The grid operation code
Chinese Name: 电网运行准则
Chinese Classification: F21    Electric power system
Professional Classification: DL    Professional Standard - Electricity
ICS Classification: 29.240.20 29.240.20    Power transmission and distribution lines 29.240.20
Issued by: NDRC
Issued on: 2007-7-20
Implemented on: 2007-12-1
Status: valid
Language: English
File Format: PDF
Word Count: 30000 words
Price(USD): 750.0
Delivery: via email in 1 business day
1 Scope This standard specifies the basic technical requirements and basic principles that shall be followed by grid operation. This standard is applicable to all the grid enterprises, power generation enterprises and power customers participating in grid operation as well as the planning and design, development and construction, test and debugging as well as research and development organizations related to grid operation and the relevant management departments. 2 Normative References The following standards contain provisions which, through reference in this text, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding correction to), or revisions of, any of these publications do not apply. However, the parties who enter into agreement according to this standard are encouraged to research whether the latest editions of these documents are applied or not. For undated reference, its latest edition of the normative document is applicable to this standard. GB 755-2000 "Rotating Electrical Machines-Rating and Performance" GB/T 2900.49 "Electrotechnical Terminology-Power System Protection" GB/T 2900.50 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - General" GB/T 2900.52 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - Generation" GB/T 2900.57 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - Operation" GB/T 2900.58 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - Power System Planning and Management" GB/T 2900.59 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - Substations" GB/T 7064 "Requirements for Turbine Type Synchronous Machine" GB/T 7409.1~7409.3 "Excitation Systems for Synchronous Machines" GB/T 7894 "Fundamental Technical Specifications for Hydro Generators" GB/T 12325 "Power Quality-Deviation of Supply Voltage" GB/T 12326 "Power Quality-Voltage Fluctuation and Flicker" GB/T 13498 "Terminology for High-voltage Direct Current (HVDC) Transmission" GB/T 13729 "General Specification for Remote Terminal Unit" GB 14285 "Technical Code for Relaying Protection and Security Automatic Equipment" GB/T 14429 "Telecontrol Equipment and Systems- Glossary" GB/T 14549 "Quality of Electric Energy Supply-Harmonics in Public Supply Network" GB/T 15148 "General Specification for Load Control Systems" GB/T 15149 "Performance and Testing of Teleprotection Equipment of Power Systems" GB/T 15153.1 "Telecontrol Equipment and Systems - Part 2: Operating Conditions - Section 1: Power Supply and Electromagnetic Compatibility" GB/T 15543 "Quality of Electric Energy Supply - Admissible Three-phase Voltage Unbalance Factor" GB/T 15945 "Power Quality-Frequency Deviation for Power System" GB 17621 "Specification of Reservoir Operation for Large and Medium-scale Hydropower Stations" GB 17859 "Classified Criteria for Security Protection of Computer Information System" GB/Z 20996.1-2007 "Performance of High-voltage Direct Current (HVDC) Systems-Part 1: Steady-state Conditions" (idt IEC/TR60919-1: 1991) GB/Z 20996.2-2007 "Performance of High-voltage Direct Current (HVDC) Systems-Part 2: Faults and Switching" (idt IEC/TR 60919-2: 1991) GB/Z 20996.3-2007 "Performance of High-voltage Direct Current (HVDC) Systems-Part 3: Dynamic Conditions" (idt IEC/TR 60919-3: 1999) GB/T 50293 "Code for Urban Electric Power Planning" DL 428 "Rules of Automatic Low-frequency Technology for Electric Power System" DL 436 "Technical Guide for HVDC Overhead Transmission Lines" DL 437 "Technical Guidelines for High Voltage Direct Current Buried Electrode" DL 497 "Management Code for Automatic Low-frequency Load Shedding of Power Systems" DL 516 "Code for Operation and Administration of Power Dispatching Automation System" DL/T 448 "Technical Administrative Code of Electric Energy Metering" DL/T 544 "Rules of Management of Communication in Electric Power System" DL/T 545 "Rules of Operational Management of Microwave Communication in Electric Power System" DL/T 545 "Rules of Operational Management of Carrier Communication in Electric Power System" DL/T 547 "Rules of Operational Management of fiber optic communication in Electric Power System" DL/T 548 "Rules of Operational Management of Lightning Protection at Signal Stations of Electric Power System" DL/T 559 "Setting Guide for 220kV~500kV Power System Protection Equipment" DL/T 583 "Specification for Static Commutated Excitation Systems and Devices for Large and Medium Hydraulic Generators" DL/T 584 "Code for Setting of 3kV~110kV Relaying Protection Equipment" DL/T 598 "The Technical Specifications for Automatic Exchange Network of Electric Power System Communication" DL/T 614 "Multifunction Electricity Metering Equipment (A.C.)" DL/T 623 "Evaluation Rules of Protection Equipment and Power System Stability Control Devices" DL/T 650 "Specification for Potential Source Static Exciter Systems for Large Turbine Generators" DL/T 684 "Guide of Calculating Settings of Relay Protection for Large Generator and Transformer" DL/T 687 "General Specification for Prevent Electric Mal-operation Device with Computer" DL/Z 713 "Immunity Requirement for Protection and Control Equipment in 500kV Substation" DL/T 723 "Technical Guide for Electric Power System Security and Stability Control" DL/T 730 "Specifications for Imported Equipment of Hydro-generators and Generator-motors" DL/T 741 "Operating Code for Overhead Transmission Line" DL/T 751 "Code for Hydraulic Turbine Generator" DL 755 "Guide on Security and Stability for Power System" DL/T 769 "Technical Guide for Microprocessor-based Protection Equipment of Power System" DL/T 842 "Ordering Specification for Low-voltage Shunt Capacitor Installation" DL/T 970 "Guide for Abnormal and Special Operations and Maintenances of Large Turbo-generators" DL/T 5131 "The Rural Electric Network Construct and Reconstruct Technical Guide" DL/T 5137 "Technical Code for Designing Electrical Measuring and Energy Metering Device" DL/T 5147 "Designing Technical Rules for Security and Automaticity Equipment of Power System" DLGJ 107 "Technical Code for Designing Computerized Monitoring and Control System of Substations" SD 131 "Technical Guidelines for Power Systems" SD 325 "Technical Guide for Voltage and Reactive Power of Power System" SDGJ 60 "Regulation for Content and Depth of Power System Design" SDGJ 84 "Design Regulations of Content and Profundity for Hydro and Fossil Fuel Power Plant Connecting to the System" SDJ 161 "Technical Code of Design for the Electric Power System" NENGYUANDIAN (1993) No.228 "The Code of Planning and Design of Urban Electric Network" DIANJI (1997) No.730 "Preparation Principles for Power Development Planning" DIANJI (1997)No.580 "Regulation for Content and Depth of Feasibility Study on Power System Interconnection" No.30 Order of State Economic and Trade commission "Regulation for Safety Protection of Computer Monitoring System and Dispatching Data Network of Power Grid and Plant" GUODIANGUI (1999)No.521 "Regulation for Content and Depth of Preliminary Feasibility Study on Power System Interconnection" No.4 Order of State Electricity Regulatory Commission (SERC) "Interim Provisions on the Investigation of Electric Power Generation Accidents" No.5 Order of State Electricity Regulatory Commission (SERC) "Rules for Electricity Secondary System Safety Protection" No.10 Order of State Electricity Regulatory Commission (SERC) "Basic Operating Rules for the Electric Power Market" No.11 Order of State Electricity Regulatory Commission (SERC) "Measures for the Supervision of Electric Power Market" No.22 Order of State Electricity Regulatory Commission (SERC) "Rules on Operation of Power Grids" 3 Terms and Definitions For the purpose of this standard, the terms and definitions established in GB/T 2900.49, GB/T 2900.50, GB/T 2900.52, GB/T 2900.57, GB/T 2900.58, GB/T 2900.59, GB/T 13498 and GB/T 14429 as well as the following ones are apply. 3.1 Basic Names 3.1.1 Power System Power system is an entirety composed of the power generation, supply (transmission, transformation and distribution) and electric facilities as well as, for ensuring their normal operation, the relaying protection and automatic safety devices, metering devices, electric power communication facilities and automation facilities, etc. 3.1.2 Power System Operator It is responsible for organizing, commanding, directing and coordinating the grid operation and is responsible for the operating organizations of electricity market. 3.1.3 Electricity Regulatory Institution The State Electricity Regulatory Commission and its detached offices. 3.1.4 Grid Enterprise The electric power enterprises owning, managing or operating the power grid. 3.1.5 User of Grid The units, like the power generation enterprises (including self-supply power plants) completing the power generation or consumption through power grid as well as the bulk grid customers. 3.1.6 Power Generation Enterprise The power generation companies connected into the grid operation (owning one or several power plants), or the electric power enterprises owning power plants. 3.1.7 Customer The units or individuals consuming electric energy through the power grid. 3.1.8 Bulk Grid Customers The customers directly signing the Power Purchase Agreement with the grid enterprises above provincial level (municipality and autonomous region) or the customers directly purchasing electric power from the power generation enterprises through the power grid. 3.2 Connection (Interconnection) Part 3.2.1 Interconnection The physical coupling among power grids. 3.2.2 Connection The physical coupling between the power plant (machine unit) and the power grid or between the electric equipment of power customer and the power grid. 3.2.3 Entry Point The coupling point at which the power plant (machine unit) is connected into the power grid or the coupling point of the electric equipment of power customer with the power grid. 3.2.4 The First Connection Day The first synchronous coupling date of the generator unit and power grid, as agreed by the grid enterprise and the intended connection party. 3.2.5 Connection Application The written application document submitted by the intended connection party to the grid enterprise for the purpose of requiring connecting its equipment with the power grid. 3.2.6 Area Control Error (ACE) Generally, the evaluation standard of the control performance of (ACE) Area Control Error adopts the A1 and A2 or CPS1 and CPS2.
1 Scope 2 Normative References 3 Terms and Definitions 3.1 Basic Names 3.2 Connection (Interconnection) Part 3.3 Operation and Control 3.4 Security 3.5 Others 4 Requirements of Grid Operation on Planning, Design and Construction Phases 4.1 Primary Part 4.2 Secondary Part 5 Connection, Interconnection and Access Conditions 5.1 Connection Procedure 5.2 Technical Characteristics and Operation Characteristics of Power Grid to Meet 5.3 Universal Technical Conditions of Connection (Interconnection) 5.4 Classified Connection (Interconnection) Clauses 5.5 Start of New Equipments 6 Grid Operation 6.1 General 6.2 Load Prediction 6.3 Equipment Maintenance 6.4 Power Generation and Utilization Balancing 6.5 Ancillary Services 6.6 Frequency and Voltage Control 6.7 Load Control 6.8 Grid Operation 6.9 Stability and Security Countermeasures of System 6.10 Hydropower Operation 6.11 Relay-protection Operation 6.12 Operation of DC Transmission System 6.13 Operation of Electric Power Communication 6.14 Operation of Dispatching Automation System 6.15 Grid Dispatching Operation under Emergency Circumstances 6.16 Accident Report and Accident Information Notification 6.17 System Test 6.18 Equipment Performance Test Appendix A (Informative) Data and Information Exchange Appendix B (Normative) Debugging Test Items of Connection (Interconnection) Appendix C (Normative) Numbering and Naming Procedure of Equipments Appendix D (Informative) Basic Data Required for System Calculation Appendix E (Informative) Data Required for Calculation of Short-circuit Current Appendix F (Informative) Data Required for Electromagnetic Transient Calculation Appendix G (Informative) Data Required for Power Quality Appendix H (Informative) Data Required for Calculation of Voltage Stability and Long-Term and Middle-Term Process Simulation Appendix I (Informative) Time Sequence in Connection Procedure
Referred in DL/T 1040-2007:
*GB 755-2000 Rotating electrical machines--Rating and performance
*GB/T 2900.49-2004 Electrotechnical terminology - Power system protection
*GB/T 2900.50-2008 Electrotechnical terminology - Generation transmission and distribution of electricity - General
*GB/T 2900.52-2008 Electrotechnical terminology - Generation transmission and distribution of electricity - Generation
*GB/T 2900.57-2008 Electrotechnical terminology - Generation transmission and distribution of electricity - Operation
*GB/T 2900.58-2008 Electrotechnical terminology - Generation transmission and distribution of electricity - Power system planning and management
*GB/T 2900.59-2008 Electrotechnical terminology - Generation transmission and distribution of electricity - Substations
*GB/T 7064-2008 Specific requirements for cylindrical rotor synchronous machines
*GB/T 7409.1-2008 Excitation systems for synchronous electrical machines - Definitions
*GB/T 7409.2-2008 Excitation systems for synchronous machines - Models for power system studies
*GB/T 7409.3-2007 Excitation system for synchronous electrical machines—Technical requirements of excitation system for large and medium synchronous generators
*GB/T 7894-2009/XG1-2015 Fundamental technical specifications for hydro generators
*GB/T 12325-2008 Power quality - Deviation of supply voltage
*GB/T 12326-2008 Power quality - Voltage fluctuation and flicker
*GB/T 13498-2007 Terminology for high-voltage direct current(HVDC)transmission
*GB/T 13729-2002 Remote terminal unit equipment
*GB 14285-2006 Technical Code for Relaying Protection and Security Automatic Equipment
*GB/T 14429-1993 Telecontrol equipment and systems. Glossary
*GB/T 14549-1993 Quality of Electric Energy Supply - Harmonics in Public Supply Network
*GB/T 15148-2008 Technical specification of power load management system
*GB/T 15149-1994 Performance and testing of teleprotection equipment of power systems narrow-band command systems
*GB/T 15153.1-1998 Telecontrol equipment and systems Part 2: Operating conditios Section 1: Power supply and electromagnetic compatibility
*GB/T 15543-2008 Power quality—Three-phase voltage
*GB/T 15945-2008 Power quality—Frequency deviation for power system
*GB 17621-1998 Specification of reservoir operation for large and medium-scale hydropower stations
*GB 17859-1999 Classified criteria for security protection of computer information system
*GB/Z 20996.1-2007 Performance of high-voltage direct current(HVDC) systems—Part 1:Steady-state conditions
*GB/Z 20996.2-2007 Performance of high-voltage direct current(HVDC)systems—Part 2:Faults and switching
*GB/Z 20996.3-2007 Performance of high-voltage direct current (HVDC)systems—Part 3:Dynamic conditions
*GB/T 50293-2014 Code for urban electric power planning
*DL 428-1991 Technical Rules for Power System Automatic Under-frequency Load Shedding
*DL 436-1991 Technical Guide for HVDC Overhead Transmission Lines
*-
*DL 497-1992 Rules for operational management of load reduction of electric power system through automatic low frequency
*DL 516-1993 Code for Operation and Administration of Power Dispatching Automation System
*DL/T 448-2016
*DL/T 544-2012 Operation management code for power system telecommunication
*DL/T 545-2012 Operation management code for microwave communication of power system
*DL/T 545-2012 Operation management code for microwave communication of power system
*DL/T 547-2010 Operation management code for optical-fiber communication of power system
*DL/T 548-2012 Overvoltage protection code for communication station of power system
*DL/T 559-2007 Setting guide for 220kV-750kV power system protections
*DL/T 583-2006 Specification for static commutated excitation systems and devices for large and medium hydraulic generators
*DL/T 584-2007 Code for setting of 3kV~110kV relaying protection equipment
*DL/T 598-2010 Technical specifications for automatic exchange telephone network of electric power system
*DL/T 614-2007 Multifunction electricity meterring equipment (A.C.)
*DL/T 623-2010 Evaluation rules of protection equipment and power system stability control devices
*DL/T 650-1998 Specification for potential source static exciter systems for large turbine generators
*DL/T 684-2012 Guide of calculating settings of relay protection for large generator and transformer
*DL/T 687-2010 General specification for preventing electric mal-operation system with computer
*DL/Z 713-2000 Immunity requirement for protection and control equipment in 500kV substation
*DL/T 723-2000 Technical guide for electric power system security and stability control
*DL/T 730-2000 Specifications for imported equipment of hydro-generators and generator-motors
*DL/T 741-2010 Operating code for overhead transmission line
*DL/T 751-2014 Code for Operation of Hydraulic Turbine Generator
*DL 755-2001 Guide on Security and Stability for Power System
*DL/T 769-2001 Technical guide for microprocessor-based protection equipment of power system
*DL/T 842-2015 Application Specification of Low-voltage Shunt Capactor Installation
*DL/T 970-2005 Guide for abnormal and special operations and maintenances of large turbo-generators
*DL/T 5131-2015 The rural electric network construction and reconstruct technical guide
*DL/T 5137-2001 Technical code for designing electrical measuring and energy metering device
*DL/T 5147-2001 Designing Technical Rules for Security and Automaticity Equipment
*DLGJ 107-1992 The design of microcomputer monitoring and control system for 550kV substation
*SD 131-1984 Technical Guidelines for Power Systems
*SD 325-1989 Guideline of power system voltage and reactive power technology
*-
*-
*SDJ 161-1985
DL/T 1040-2007 is referred in:
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* Q/GDW 392-2009 Technical rule for connecting wind farm to power network
* GB/T 19963-2011 Technical rule for connecting wind farm to power system
*GB/T 19964-2012 Technical requirements for connecting photovoltaic power station to power system
*Q/GDW 564-2010 Technical guideline for electric energy storage system interconnecting to distribution network
Code of China
Standard
DL/T 1040-2007  The grid operation code (English Version)
Standard No.DL/T 1040-2007
Statusvalid
LanguageEnglish
File FormatPDF
Word Count30000 words
Price(USD)750.0
Implemented on2007-12-1
Deliveryvia email in 1 business day
Detail of DL/T 1040-2007
Standard No.
DL/T 1040-2007
English Name
The grid operation code
Chinese Name
电网运行准则
Chinese Classification
F21
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2007-7-20
Implemented on
2007-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
30000 words
Price(USD)
750.0
Keywords
DL/T 1040-2007, DL 1040-2007, DLT 1040-2007, DL/T1040-2007, DL/T 1040, DL/T1040, DL1040-2007, DL 1040, DL1040, DLT1040-2007, DLT 1040, DLT1040
Introduction of DL/T 1040-2007
1 Scope This standard specifies the basic technical requirements and basic principles that shall be followed by grid operation. This standard is applicable to all the grid enterprises, power generation enterprises and power customers participating in grid operation as well as the planning and design, development and construction, test and debugging as well as research and development organizations related to grid operation and the relevant management departments. 2 Normative References The following standards contain provisions which, through reference in this text, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding correction to), or revisions of, any of these publications do not apply. However, the parties who enter into agreement according to this standard are encouraged to research whether the latest editions of these documents are applied or not. For undated reference, its latest edition of the normative document is applicable to this standard. GB 755-2000 "Rotating Electrical Machines-Rating and Performance" GB/T 2900.49 "Electrotechnical Terminology-Power System Protection" GB/T 2900.50 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - General" GB/T 2900.52 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - Generation" GB/T 2900.57 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - Operation" GB/T 2900.58 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - Power System Planning and Management" GB/T 2900.59 "Electrotechnical Terminology - Generation, Transmission and Distribution of Electricity - Substations" GB/T 7064 "Requirements for Turbine Type Synchronous Machine" GB/T 7409.1~7409.3 "Excitation Systems for Synchronous Machines" GB/T 7894 "Fundamental Technical Specifications for Hydro Generators" GB/T 12325 "Power Quality-Deviation of Supply Voltage" GB/T 12326 "Power Quality-Voltage Fluctuation and Flicker" GB/T 13498 "Terminology for High-voltage Direct Current (HVDC) Transmission" GB/T 13729 "General Specification for Remote Terminal Unit" GB 14285 "Technical Code for Relaying Protection and Security Automatic Equipment" GB/T 14429 "Telecontrol Equipment and Systems- Glossary" GB/T 14549 "Quality of Electric Energy Supply-Harmonics in Public Supply Network" GB/T 15148 "General Specification for Load Control Systems" GB/T 15149 "Performance and Testing of Teleprotection Equipment of Power Systems" GB/T 15153.1 "Telecontrol Equipment and Systems - Part 2: Operating Conditions - Section 1: Power Supply and Electromagnetic Compatibility" GB/T 15543 "Quality of Electric Energy Supply - Admissible Three-phase Voltage Unbalance Factor" GB/T 15945 "Power Quality-Frequency Deviation for Power System" GB 17621 "Specification of Reservoir Operation for Large and Medium-scale Hydropower Stations" GB 17859 "Classified Criteria for Security Protection of Computer Information System" GB/Z 20996.1-2007 "Performance of High-voltage Direct Current (HVDC) Systems-Part 1: Steady-state Conditions" (idt IEC/TR60919-1: 1991) GB/Z 20996.2-2007 "Performance of High-voltage Direct Current (HVDC) Systems-Part 2: Faults and Switching" (idt IEC/TR 60919-2: 1991) GB/Z 20996.3-2007 "Performance of High-voltage Direct Current (HVDC) Systems-Part 3: Dynamic Conditions" (idt IEC/TR 60919-3: 1999) GB/T 50293 "Code for Urban Electric Power Planning" DL 428 "Rules of Automatic Low-frequency Technology for Electric Power System" DL 436 "Technical Guide for HVDC Overhead Transmission Lines" DL 437 "Technical Guidelines for High Voltage Direct Current Buried Electrode" DL 497 "Management Code for Automatic Low-frequency Load Shedding of Power Systems" DL 516 "Code for Operation and Administration of Power Dispatching Automation System" DL/T 448 "Technical Administrative Code of Electric Energy Metering" DL/T 544 "Rules of Management of Communication in Electric Power System" DL/T 545 "Rules of Operational Management of Microwave Communication in Electric Power System" DL/T 545 "Rules of Operational Management of Carrier Communication in Electric Power System" DL/T 547 "Rules of Operational Management of fiber optic communication in Electric Power System" DL/T 548 "Rules of Operational Management of Lightning Protection at Signal Stations of Electric Power System" DL/T 559 "Setting Guide for 220kV~500kV Power System Protection Equipment" DL/T 583 "Specification for Static Commutated Excitation Systems and Devices for Large and Medium Hydraulic Generators" DL/T 584 "Code for Setting of 3kV~110kV Relaying Protection Equipment" DL/T 598 "The Technical Specifications for Automatic Exchange Network of Electric Power System Communication" DL/T 614 "Multifunction Electricity Metering Equipment (A.C.)" DL/T 623 "Evaluation Rules of Protection Equipment and Power System Stability Control Devices" DL/T 650 "Specification for Potential Source Static Exciter Systems for Large Turbine Generators" DL/T 684 "Guide of Calculating Settings of Relay Protection for Large Generator and Transformer" DL/T 687 "General Specification for Prevent Electric Mal-operation Device with Computer" DL/Z 713 "Immunity Requirement for Protection and Control Equipment in 500kV Substation" DL/T 723 "Technical Guide for Electric Power System Security and Stability Control" DL/T 730 "Specifications for Imported Equipment of Hydro-generators and Generator-motors" DL/T 741 "Operating Code for Overhead Transmission Line" DL/T 751 "Code for Hydraulic Turbine Generator" DL 755 "Guide on Security and Stability for Power System" DL/T 769 "Technical Guide for Microprocessor-based Protection Equipment of Power System" DL/T 842 "Ordering Specification for Low-voltage Shunt Capacitor Installation" DL/T 970 "Guide for Abnormal and Special Operations and Maintenances of Large Turbo-generators" DL/T 5131 "The Rural Electric Network Construct and Reconstruct Technical Guide" DL/T 5137 "Technical Code for Designing Electrical Measuring and Energy Metering Device" DL/T 5147 "Designing Technical Rules for Security and Automaticity Equipment of Power System" DLGJ 107 "Technical Code for Designing Computerized Monitoring and Control System of Substations" SD 131 "Technical Guidelines for Power Systems" SD 325 "Technical Guide for Voltage and Reactive Power of Power System" SDGJ 60 "Regulation for Content and Depth of Power System Design" SDGJ 84 "Design Regulations of Content and Profundity for Hydro and Fossil Fuel Power Plant Connecting to the System" SDJ 161 "Technical Code of Design for the Electric Power System" NENGYUANDIAN (1993) No.228 "The Code of Planning and Design of Urban Electric Network" DIANJI (1997) No.730 "Preparation Principles for Power Development Planning" DIANJI (1997)No.580 "Regulation for Content and Depth of Feasibility Study on Power System Interconnection" No.30 Order of State Economic and Trade commission "Regulation for Safety Protection of Computer Monitoring System and Dispatching Data Network of Power Grid and Plant" GUODIANGUI (1999)No.521 "Regulation for Content and Depth of Preliminary Feasibility Study on Power System Interconnection" No.4 Order of State Electricity Regulatory Commission (SERC) "Interim Provisions on the Investigation of Electric Power Generation Accidents" No.5 Order of State Electricity Regulatory Commission (SERC) "Rules for Electricity Secondary System Safety Protection" No.10 Order of State Electricity Regulatory Commission (SERC) "Basic Operating Rules for the Electric Power Market" No.11 Order of State Electricity Regulatory Commission (SERC) "Measures for the Supervision of Electric Power Market" No.22 Order of State Electricity Regulatory Commission (SERC) "Rules on Operation of Power Grids" 3 Terms and Definitions For the purpose of this standard, the terms and definitions established in GB/T 2900.49, GB/T 2900.50, GB/T 2900.52, GB/T 2900.57, GB/T 2900.58, GB/T 2900.59, GB/T 13498 and GB/T 14429 as well as the following ones are apply. 3.1 Basic Names 3.1.1 Power System Power system is an entirety composed of the power generation, supply (transmission, transformation and distribution) and electric facilities as well as, for ensuring their normal operation, the relaying protection and automatic safety devices, metering devices, electric power communication facilities and automation facilities, etc. 3.1.2 Power System Operator It is responsible for organizing, commanding, directing and coordinating the grid operation and is responsible for the operating organizations of electricity market. 3.1.3 Electricity Regulatory Institution The State Electricity Regulatory Commission and its detached offices. 3.1.4 Grid Enterprise The electric power enterprises owning, managing or operating the power grid. 3.1.5 User of Grid The units, like the power generation enterprises (including self-supply power plants) completing the power generation or consumption through power grid as well as the bulk grid customers. 3.1.6 Power Generation Enterprise The power generation companies connected into the grid operation (owning one or several power plants), or the electric power enterprises owning power plants. 3.1.7 Customer The units or individuals consuming electric energy through the power grid. 3.1.8 Bulk Grid Customers The customers directly signing the Power Purchase Agreement with the grid enterprises above provincial level (municipality and autonomous region) or the customers directly purchasing electric power from the power generation enterprises through the power grid. 3.2 Connection (Interconnection) Part 3.2.1 Interconnection The physical coupling among power grids. 3.2.2 Connection The physical coupling between the power plant (machine unit) and the power grid or between the electric equipment of power customer and the power grid. 3.2.3 Entry Point The coupling point at which the power plant (machine unit) is connected into the power grid or the coupling point of the electric equipment of power customer with the power grid. 3.2.4 The First Connection Day The first synchronous coupling date of the generator unit and power grid, as agreed by the grid enterprise and the intended connection party. 3.2.5 Connection Application The written application document submitted by the intended connection party to the grid enterprise for the purpose of requiring connecting its equipment with the power grid. 3.2.6 Area Control Error (ACE) Generally, the evaluation standard of the control performance of (ACE) Area Control Error adopts the A1 and A2 or CPS1 and CPS2.
Contents of DL/T 1040-2007
1 Scope 2 Normative References 3 Terms and Definitions 3.1 Basic Names 3.2 Connection (Interconnection) Part 3.3 Operation and Control 3.4 Security 3.5 Others 4 Requirements of Grid Operation on Planning, Design and Construction Phases 4.1 Primary Part 4.2 Secondary Part 5 Connection, Interconnection and Access Conditions 5.1 Connection Procedure 5.2 Technical Characteristics and Operation Characteristics of Power Grid to Meet 5.3 Universal Technical Conditions of Connection (Interconnection) 5.4 Classified Connection (Interconnection) Clauses 5.5 Start of New Equipments 6 Grid Operation 6.1 General 6.2 Load Prediction 6.3 Equipment Maintenance 6.4 Power Generation and Utilization Balancing 6.5 Ancillary Services 6.6 Frequency and Voltage Control 6.7 Load Control 6.8 Grid Operation 6.9 Stability and Security Countermeasures of System 6.10 Hydropower Operation 6.11 Relay-protection Operation 6.12 Operation of DC Transmission System 6.13 Operation of Electric Power Communication 6.14 Operation of Dispatching Automation System 6.15 Grid Dispatching Operation under Emergency Circumstances 6.16 Accident Report and Accident Information Notification 6.17 System Test 6.18 Equipment Performance Test Appendix A (Informative) Data and Information Exchange Appendix B (Normative) Debugging Test Items of Connection (Interconnection) Appendix C (Normative) Numbering and Naming Procedure of Equipments Appendix D (Informative) Basic Data Required for System Calculation Appendix E (Informative) Data Required for Calculation of Short-circuit Current Appendix F (Informative) Data Required for Electromagnetic Transient Calculation Appendix G (Informative) Data Required for Power Quality Appendix H (Informative) Data Required for Calculation of Voltage Stability and Long-Term and Middle-Term Process Simulation Appendix I (Informative) Time Sequence in Connection Procedure
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 1040-2007, DL 1040-2007, DLT 1040-2007, DL/T1040-2007, DL/T 1040, DL/T1040, DL1040-2007, DL 1040, DL1040, DLT1040-2007, DLT 1040, DLT1040