2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5056-2007
DL/T 5056-2007   Technical code of general plan design for substation (English Version)
Standard No.: DL/T 5056-2007 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 35000 words Translation Price(USD):490.0 remind me the price change

Email:

Implemented on:2008-6-1 Delivery: via email in 1 business day

→ → →

,2024-11-24,2008-6-1,141137531201734CD95C038BFD135
Standard No.: DL/T 5056-2007
English Name: Technical code of general plan design for substation
Chinese Name: 变电站总布置设计技术规程
Chinese Classification: P63    Power supply and distribution engineering
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NDRC
Issued on: 2007-12-3
Implemented on: 2008-6-1
Status: superseded
Superseded by:DL/T 5056-2024
Superseded on:2024-11-24
Superseding:DL/T 5056-1996 Technical Code of General Plan Design for Substation
Target Language: English
File Format: PDF
Word Count: 35000 words
Translation Price(USD): 490.0
Delivery: via email in 1 business day
Technical code of general plan design for substation 1 Scope This standard specifies the basic technical requirements of general plan design for substation. This standard is applicable to the general plan design for new or expanded substations with voltage levels of 110 kV~750 kV. It can be reference for the general plan design for substations with voltage levels of 750 kV above and rebuilt substations and converter stations.   2 Normative references The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated references, subsequent amendments (excluding corrections) to, or revisions of, any of these publications do not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition applies. GB 50007 Code for design of building foundation GB 50016 Code for fire protection design of buildings GB 50187 Code for design of general plan of industrial enterprises GB 50201 Flood control criteria GB 50229 Code for design of fire protection for fossil fuel power plants and substations GB 50330 Technical code for building slope engineering GBJ 22 Code for design of roads in factories and mining areas DL/T 5032 Technical code of general plan transportation design for fossil fuel power plants   3 General 3.0.1 The general plan design for substation must fully implement the national basic construction policy, reflect the national technical and economic policies, unify and define the construction standards, and ensure the safety, reliability, advanced technology, economic applicability and conformity with the national conditions of the new (expanded) substation. 3.0.2 The general plan design for substation must establish a global concept, with in-depth investigation and research, rely on technical progress for well-designed, constantly sum up experiences, actively and prudently promote advanced technologies at home and abroad, and adopt mature new materials, new processes and new plan based on local conditions so as to meet the requirements of sustainable development. 3.0.3 The general plan design for substation shall comply with the relevant provisions of Land Administration Law of the People's Republic of China, and conform to the national land use policy, adjust measures to local conditions, save land, use land rationally, improve land utilization rate, and make full use of wasteland, poor land, sloping land, and does not occupy or occupies less farmland; shall make rational use of the terrain, reduce the amount of leveling earthwork (stonework) and the demolition of existing facilities and buildings (structures) to avoid or reduce the land requisition, upon the technical and economic comparison for various schemes optimize the design scheme, reduce the project cost, shorten the construction period, and create conditions for civilized construction. 3.0.4 This standard is prepared in accordance with the principle of GB 50187 Code for design of general plan of industrial enterprises. In addition to the implementation of this standard, the general plan design for substations constructed under special natural conditions such as mountainous and earthquake areas, collapsible loess areas, expansive soil areas, soft soil areas, permafrost areas, saline soil areas, etc., shall still conform to the requirements of relevant current national standards and professional standards. 3.0.5 The general plan design for the expanded and rebuilt substation shall be combined with the existing general plan, vertical plan and equipment plan characteristics to facilitate the overall coordination and unity.   4 General planning 4.0.1 The general planning of the substation shall be coordinated with the local town planning, industrial area planning, nature reserve planning or tourism planning area planning. The station shall not be built in the existing geological disaster areas such as landslide, debris flow, large karst cave and goaf. The station should not cover the mineral resources and cultural relics and shall avoid mutual interference with military, aviation and communication facilities. The traffic outside the station shall meet the transportation requirements for large equipment. It shall make full use of the nearby public facilities such as living, culture and education, health, transportation, firefighting, water supply and drainage, etc. For substations with special topography such as mountainous areas, the general planning shall consider the influences of topography, mountain stability, slope excavation, flood and waterlogging. During the construction in areas affected by mountain torrents and waterlogging, the existing flood control and waterlogging prevention facilities should be applied fully.
Foreword i 1 Scope 2 Normative references 3 General 4 General planning 5 General plan 6 Vertical plan 7 Plan of underground pipeline (ditch) 8 Road 9 Outdoor power distribution device site treatment and afforestation 10 Technical and economic indexes
Referred in DL/T 5056-2007:
*GB 50007-2011 Code for design of building foundation
*GB 50016-2014(2018)-Provisions Provisions of Code for Fire Protection Design of Buildings
*GB 50187-2012 Code for Design of General Layout of Industrial Enterprises
*GB 50201-2014 Standard for flood control
*GB 50229-2019 Standard for design of fire protection for fossil fuel power plants and substations
*GB 50330-2013 Technical code for building slope engineering
*GBJ 22-1987 Specifications for the Design of Factory and Mine Roads
*DL/T 5032-2018 Code for design of general layout and transportation for power plant
Code of China
Standard
DL/T 5056-2007   Technical code of general plan design for substation (English Version)
Standard No.DL/T 5056-2007
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count35000 words
Price(USD)490.0
Implemented on2008-6-1
Deliveryvia email in 1 business day
Detail of DL/T 5056-2007
Standard No.
DL/T 5056-2007
English Name
Technical code of general plan design for substation
Chinese Name
变电站总布置设计技术规程
Chinese Classification
P63
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2007-12-3
Implemented on
2008-6-1
Status
superseded
Superseded by
DL/T 5056-2024
Superseded on
2024-11-24
Abolished on
Superseding
DL/T 5056-1996 Technical Code of General Plan Design for Substation
Language
English
File Format
PDF
Word Count
35000 words
Price(USD)
490.0
Keywords
DL/T 5056-2007, DL 5056-2007, DLT 5056-2007, DL/T5056-2007, DL/T 5056, DL/T5056, DL5056-2007, DL 5056, DL5056, DLT5056-2007, DLT 5056, DLT5056
Introduction of DL/T 5056-2007
Technical code of general plan design for substation 1 Scope This standard specifies the basic technical requirements of general plan design for substation. This standard is applicable to the general plan design for new or expanded substations with voltage levels of 110 kV~750 kV. It can be reference for the general plan design for substations with voltage levels of 750 kV above and rebuilt substations and converter stations.   2 Normative references The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated references, subsequent amendments (excluding corrections) to, or revisions of, any of these publications do not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition applies. GB 50007 Code for design of building foundation GB 50016 Code for fire protection design of buildings GB 50187 Code for design of general plan of industrial enterprises GB 50201 Flood control criteria GB 50229 Code for design of fire protection for fossil fuel power plants and substations GB 50330 Technical code for building slope engineering GBJ 22 Code for design of roads in factories and mining areas DL/T 5032 Technical code of general plan transportation design for fossil fuel power plants   3 General 3.0.1 The general plan design for substation must fully implement the national basic construction policy, reflect the national technical and economic policies, unify and define the construction standards, and ensure the safety, reliability, advanced technology, economic applicability and conformity with the national conditions of the new (expanded) substation. 3.0.2 The general plan design for substation must establish a global concept, with in-depth investigation and research, rely on technical progress for well-designed, constantly sum up experiences, actively and prudently promote advanced technologies at home and abroad, and adopt mature new materials, new processes and new plan based on local conditions so as to meet the requirements of sustainable development. 3.0.3 The general plan design for substation shall comply with the relevant provisions of Land Administration Law of the People's Republic of China, and conform to the national land use policy, adjust measures to local conditions, save land, use land rationally, improve land utilization rate, and make full use of wasteland, poor land, sloping land, and does not occupy or occupies less farmland; shall make rational use of the terrain, reduce the amount of leveling earthwork (stonework) and the demolition of existing facilities and buildings (structures) to avoid or reduce the land requisition, upon the technical and economic comparison for various schemes optimize the design scheme, reduce the project cost, shorten the construction period, and create conditions for civilized construction. 3.0.4 This standard is prepared in accordance with the principle of GB 50187 Code for design of general plan of industrial enterprises. In addition to the implementation of this standard, the general plan design for substations constructed under special natural conditions such as mountainous and earthquake areas, collapsible loess areas, expansive soil areas, soft soil areas, permafrost areas, saline soil areas, etc., shall still conform to the requirements of relevant current national standards and professional standards. 3.0.5 The general plan design for the expanded and rebuilt substation shall be combined with the existing general plan, vertical plan and equipment plan characteristics to facilitate the overall coordination and unity.   4 General planning 4.0.1 The general planning of the substation shall be coordinated with the local town planning, industrial area planning, nature reserve planning or tourism planning area planning. The station shall not be built in the existing geological disaster areas such as landslide, debris flow, large karst cave and goaf. The station should not cover the mineral resources and cultural relics and shall avoid mutual interference with military, aviation and communication facilities. The traffic outside the station shall meet the transportation requirements for large equipment. It shall make full use of the nearby public facilities such as living, culture and education, health, transportation, firefighting, water supply and drainage, etc. For substations with special topography such as mountainous areas, the general planning shall consider the influences of topography, mountain stability, slope excavation, flood and waterlogging. During the construction in areas affected by mountain torrents and waterlogging, the existing flood control and waterlogging prevention facilities should be applied fully.
Contents of DL/T 5056-2007
Foreword i 1 Scope 2 Normative references 3 General 4 General planning 5 General plan 6 Vertical plan 7 Plan of underground pipeline (ditch) 8 Road 9 Outdoor power distribution device site treatment and afforestation 10 Technical and economic indexes
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5056-2007, DL 5056-2007, DLT 5056-2007, DL/T5056-2007, DL/T 5056, DL/T5056, DL5056-2007, DL 5056, DL5056, DLT5056-2007, DLT 5056, DLT5056