DL/T 5210.3-2009   Code for construction quality acceptance and evlauation of electric power construct Part 3:turbine generator unit (English Version)
Standard No.: DL/T 5210.3-2009 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 105000 words Translation Price(USD):1000.0 remind me the price change

Email:

Implemented on:2009-12-1 Delivery: via email in 1 business day

→ → →

2018-07-01,2018-7-1,2009-12-1,14113764107303217728D142A1376
Standard No.: DL/T 5210.3-2009
English Name: Code for construction quality acceptance and evlauation of electric power construct Part 3:turbine generator unit
Chinese Name: 电力建设施工质量验收及评价规程 第3部分:汽轮发电机组
Chinese Classification: F20    
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NDRC
Issued on: 2009-7-22
Implemented on: 2009-12-1
Status: superseded
Superseded by:DL/T 5210.3-2018 Code for construction quality acceptance of electric power construct Part 3: steam turbine generator unit
Superseded on:2018-7-1
Abolished on:2018-07-01
Target Language: English
File Format: PDF
Word Count: 105000 words
Translation Price(USD): 1000.0
Delivery: via email in 1 business day
1 Scope This Part in DL/T 5210 specifies the relevant requirements in construction quality acceptance standard, quality evalution of single project, quality evalution of single unit, and quality evalution of overal project of steam turbine generator units in thermal power generation engineering. This part is applicable to construction quality acceptance and engineering quality assessment of new construction, extension and renovation of thermal power generation project steam turbine generator units with unit capacity of 300MW ~ 1000MW thermal power generation project and fuel gas - steam combined cycles machine unit. This part can be referanced for assessment of thermal power generating unit and nuclear power station conventional Island under 300MW and the BOP engineering. 2 Normative references For dated reference, subsequent amendments to (excluding corrigenda), or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this standard are encouraged to study whether the latest edition of these documents is applicable. For undated references, the latest edition of the normative document is applicable to this standard. GB/T 7596 Quality criteria of turbine oils in service for power plants GB 50205 Code for Acceptance of Construction Quality of Steel Structures GB/T 50375 Evaluating standard for excellent quality of building engineering DL 5011 The Code of Election and Acceptance for Power Plant Construction - steam turbine unit part DL/T 5161.1~5161.17 Specification for construction quality checkout and evaluation of electric equipment installation DL/T 5210.1 Specification for construction quality acceptance and evaluation of electric power construct Part 1: Civil construction engineering DL/T 869 The Code of the Welding for Power Plant 3 General Provisions 3.0.1 This standard is formualted with a view to intensifying construction engineering quality control in electric power inducstry, improving construction quality level, and unifying the relevant requirements in construction quality acceptance standard and evaluation for thermal power generation engineering. 3.0.2 The construction quality acceptance for thermal power generation project shall be conducted by inspection lot, subitem project, subsection project, and unit project. the construction quality acceptance is only applied with a quality grade "qualified"; in case of any nonconformity, it shall comply with Article 4.1.12 in this Part. 3.0.3 The engineering quality evaluation shall be conducted for the projects with the "high quality" engineering objective. 3.0.4 The engineering quality evaluation shall be conducted by the three phases (stage) - single project, single unit and overal project. 3.0.5 The construction quality evaluation for single project shall be conducted upon that the construction quality acceptance for all unit projects is qualified and the collection and rearrangement of engineering technical document is completed, and the evaluation shall cover the whole work content before 168-h trial operation with full load. 3.0.6 The quality evalution for single unit shall be con ducted after the construction quality acceptance for all single projects and the 168-h trial operation of the unit with full load are completed and the environmental protection projects suppoted are normally put into operation. the synergic system shall be bought into the evaluation for the first unit. 3.0.7 The quality evalution for overal project shall be conducted after the quality evalution for all single units, the performance tests of the units and the engineering archives evaluation are completed.
Foreword 1 Scope 2 Normative references 3 General Provisions 4 Construction quality acceptance 4.1 Requirements for construction quality acceptance 4.2 Division of construction quality acceptance range and general tables 4.3 General parts of steam turbine generator units 4.4 Steam turbine main body installation 4.5 Adjustment and lubricating oil system installation 4.6 Generator and exciter installation 4.7 Assembly and installation of water-cooled condenser 4.8 Installation of air-cooling condenser system 4.9 Installation of deaerator (water tank) equipment installation 4.10 Installation of high- and low-pressure heater 4.11 Installation of bypass system equipment 4.12 Installation of steam feed pump unit 4.13 Installation of electrically driven feed pump group 4.14 Installation of condensate pump 4.15 Installation of desuperheater and decompressor 4.16 Installation of hoisting appliance 4.17 Installation of diesel generator 4.18 Installation of water circulating pump 4.19 Rotary sieve installation 4.20 Trash remover equipment installation 4.21 Installation of large-scale flat steel gate 4.22 Deep water pump installation 4.23 Installation of water purifying plant 4.24 Main body installation of combustion engine 4.25 Combustion engine auxiliary device and accessory machinery installation 4.26 Construction Identification and approval 5 Construction Quality Evaluation of Single Project 5.1 Basic requirements 5.2 Evaluation provisions 5.3 Evaluation content 5.4 Evaluation methods 5.5 Construction quality evaluation for main body and sub-system of turbine generator 5.6 Evaluation on installation and construction quality of accessory machinery and auxiliary device in main power house 5.7 Evaluation on Installation and Construction Quality of Accessory Machines and Auxiliary Equipments outside the Main Building 5.8 Evaluation on Pipe Installation Quality of Steam Turbine 5.9 Evaluation on Construction Quality of Steam Turbine Main Body (Including Steam Feed Pump), Equipment, Pipe Insulation and Paint 5.10 Evaluation on Installation and Construction Quality of Combustion Engine and Its Auxiliary Equipments and Accessory Machines 5.11 Summarizing of Evaluation Score of Project Position (Scope) of Single Project 5.12 Evaluation Report on the Quality of Single Project 6 Quality Evaluation of Single Unit 7 Quality Evaluation of Overall Project Annex A (Informative) Typical Data of Flow Passage Part Annex B (Informative) Grading Standard of Oil Quality Annex C (Normative) Vibration of Accessory Machines Annex D (Normative) Centre Alignment of Accessory Machines
Referred in DL/T 5210.3-2009:
*GB/T 7596-2008 In-service quality criteria of turbine oils used in power plants
*GB 50205-2001 Code for acceptance of construction quality of steel structures
*GB/T 50375-2006 Evaluating standard for excellent quality of building engineering
*DL 5011-1992 The code of erection and acceptance of electric power construction section of steam turbine set
*DL/T 5161.1-2002 Specification for construction quality checkout and evaluation of electric equipment installation
*DL/T 5161.2-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 2: High voltage electric power equipment
*DL/T 5161.3-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 3:Power transformer Oil immersed reactor and Mutual inductor
*DL/T 5161.4-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 4:Bus bar installation
*DL/T 5161.5-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 5: Cable line
*DL/T 5161.6-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 6: Earthing device
*DL/T 5161.7-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 7: Electrical rotating machines
*DL/T 5161.8-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 8: Switchboard outfit complete cubicle and secondary circuit
*DL/T 5161.9-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 9: Battery
*DL/T 5161.10-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 10: 35kV and under over-head power line
*DL/T 5161.11-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 11: Elevator
*DL/T 5161.12-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 12: Low-voltage apparatus
*DL/T 5161.13-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 13: Power converter equipment
*DL/T 5161.14-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 14: Crane
*DL/T 5161.15-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 15: Electric device of explosion atmospheres
*DL/T 5161.16-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 16: 1kV and under feeder cable engineering
*DL/T 5161.17-2002 Specification for construction quality checkout and evaluation of electric equipment installation Part 17: Electric lighting device
*DL/T 5210.1-2012 Specification for construction quality acceptance and evaluation of electric power construct Part 1: Civil construction engineering
*DL/T 869-2012 The code of Welding for Power Plant
DL/T 5210.3-2009 is referred in:
* DL/T 5210.6-2009 Specification for construction quality acceptance and evaluation of electric power construct Part 6:The equipment and the system with the water treatment and hydrogen generation
Code of China
Standard
DL/T 5210.3-2009  Code for construction quality acceptance and evlauation of electric power construct Part 3:turbine generator unit (English Version)
Standard No.DL/T 5210.3-2009
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count105000 words
Price(USD)1000.0
Implemented on2009-12-1
Deliveryvia email in 1 business day
Detail of DL/T 5210.3-2009
Standard No.
DL/T 5210.3-2009
English Name
Code for construction quality acceptance and evlauation of electric power construct Part 3:turbine generator unit
Chinese Name
电力建设施工质量验收及评价规程 第3部分:汽轮发电机组
Chinese Classification
F20
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2009-7-22
Implemented on
2009-12-1
Status
superseded
Superseded by
DL/T 5210.3-2018 Code for construction quality acceptance of electric power construct Part 3: steam turbine generator unit
Superseded on
2018-7-1
Abolished on
2018-07-01
Superseding
Language
English
File Format
PDF
Word Count
105000 words
Price(USD)
1000.0
Keywords
DL/T 5210.3-2009, DL 5210.3-2009, DLT 5210.3-2009, DL/T5210.3-2009, DL/T 5210.3, DL/T5210.3, DL5210.3-2009, DL 5210.3, DL5210.3, DLT5210.3-2009, DLT 5210.3, DLT5210.3
Introduction of DL/T 5210.3-2009
1 Scope This Part in DL/T 5210 specifies the relevant requirements in construction quality acceptance standard, quality evalution of single project, quality evalution of single unit, and quality evalution of overal project of steam turbine generator units in thermal power generation engineering. This part is applicable to construction quality acceptance and engineering quality assessment of new construction, extension and renovation of thermal power generation project steam turbine generator units with unit capacity of 300MW ~ 1000MW thermal power generation project and fuel gas - steam combined cycles machine unit. This part can be referanced for assessment of thermal power generating unit and nuclear power station conventional Island under 300MW and the BOP engineering. 2 Normative references For dated reference, subsequent amendments to (excluding corrigenda), or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this standard are encouraged to study whether the latest edition of these documents is applicable. For undated references, the latest edition of the normative document is applicable to this standard. GB/T 7596 Quality criteria of turbine oils in service for power plants GB 50205 Code for Acceptance of Construction Quality of Steel Structures GB/T 50375 Evaluating standard for excellent quality of building engineering DL 5011 The Code of Election and Acceptance for Power Plant Construction - steam turbine unit part DL/T 5161.1~5161.17 Specification for construction quality checkout and evaluation of electric equipment installation DL/T 5210.1 Specification for construction quality acceptance and evaluation of electric power construct Part 1: Civil construction engineering DL/T 869 The Code of the Welding for Power Plant 3 General Provisions 3.0.1 This standard is formualted with a view to intensifying construction engineering quality control in electric power inducstry, improving construction quality level, and unifying the relevant requirements in construction quality acceptance standard and evaluation for thermal power generation engineering. 3.0.2 The construction quality acceptance for thermal power generation project shall be conducted by inspection lot, subitem project, subsection project, and unit project. the construction quality acceptance is only applied with a quality grade "qualified"; in case of any nonconformity, it shall comply with Article 4.1.12 in this Part. 3.0.3 The engineering quality evaluation shall be conducted for the projects with the "high quality" engineering objective. 3.0.4 The engineering quality evaluation shall be conducted by the three phases (stage) - single project, single unit and overal project. 3.0.5 The construction quality evaluation for single project shall be conducted upon that the construction quality acceptance for all unit projects is qualified and the collection and rearrangement of engineering technical document is completed, and the evaluation shall cover the whole work content before 168-h trial operation with full load. 3.0.6 The quality evalution for single unit shall be con ducted after the construction quality acceptance for all single projects and the 168-h trial operation of the unit with full load are completed and the environmental protection projects suppoted are normally put into operation. the synergic system shall be bought into the evaluation for the first unit. 3.0.7 The quality evalution for overal project shall be conducted after the quality evalution for all single units, the performance tests of the units and the engineering archives evaluation are completed.
Contents of DL/T 5210.3-2009
Foreword 1 Scope 2 Normative references 3 General Provisions 4 Construction quality acceptance 4.1 Requirements for construction quality acceptance 4.2 Division of construction quality acceptance range and general tables 4.3 General parts of steam turbine generator units 4.4 Steam turbine main body installation 4.5 Adjustment and lubricating oil system installation 4.6 Generator and exciter installation 4.7 Assembly and installation of water-cooled condenser 4.8 Installation of air-cooling condenser system 4.9 Installation of deaerator (water tank) equipment installation 4.10 Installation of high- and low-pressure heater 4.11 Installation of bypass system equipment 4.12 Installation of steam feed pump unit 4.13 Installation of electrically driven feed pump group 4.14 Installation of condensate pump 4.15 Installation of desuperheater and decompressor 4.16 Installation of hoisting appliance 4.17 Installation of diesel generator 4.18 Installation of water circulating pump 4.19 Rotary sieve installation 4.20 Trash remover equipment installation 4.21 Installation of large-scale flat steel gate 4.22 Deep water pump installation 4.23 Installation of water purifying plant 4.24 Main body installation of combustion engine 4.25 Combustion engine auxiliary device and accessory machinery installation 4.26 Construction Identification and approval 5 Construction Quality Evaluation of Single Project 5.1 Basic requirements 5.2 Evaluation provisions 5.3 Evaluation content 5.4 Evaluation methods 5.5 Construction quality evaluation for main body and sub-system of turbine generator 5.6 Evaluation on installation and construction quality of accessory machinery and auxiliary device in main power house 5.7 Evaluation on Installation and Construction Quality of Accessory Machines and Auxiliary Equipments outside the Main Building 5.8 Evaluation on Pipe Installation Quality of Steam Turbine 5.9 Evaluation on Construction Quality of Steam Turbine Main Body (Including Steam Feed Pump), Equipment, Pipe Insulation and Paint 5.10 Evaluation on Installation and Construction Quality of Combustion Engine and Its Auxiliary Equipments and Accessory Machines 5.11 Summarizing of Evaluation Score of Project Position (Scope) of Single Project 5.12 Evaluation Report on the Quality of Single Project 6 Quality Evaluation of Single Unit 7 Quality Evaluation of Overall Project Annex A (Informative) Typical Data of Flow Passage Part Annex B (Informative) Grading Standard of Oil Quality Annex C (Normative) Vibration of Accessory Machines Annex D (Normative) Centre Alignment of Accessory Machines
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5210.3-2009, DL 5210.3-2009, DLT 5210.3-2009, DL/T5210.3-2009, DL/T 5210.3, DL/T5210.3, DL5210.3-2009, DL 5210.3, DL5210.3, DLT5210.3-2009, DLT 5210.3, DLT5210.3