2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5210.4-2009
DL/T 5210.4-2009   Code for construction quality acceptance and evaluation of electric power construct Part 4:instrumentation and control (English Version)
Standard No.: DL/T 5210.4-2009 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 65000 words Translation Price(USD):700.0 remind me the price change

Email:

Implemented on:2009-12-1 Delivery: via email in 1 business day

→ → →

2018-07-01,2018-7-1,2009-12-1,14113763897295F50F3568902BF05
Standard No.: DL/T 5210.4-2009
English Name: Code for construction quality acceptance and evaluation of electric power construct Part 4:instrumentation and control
Chinese Name: 电力建设施工质量验收及评价规程 第4部分:热工仪表及控制装置
Chinese Classification: F20    
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: Ministry of Railway
Issued on: 2009-7-22
Implemented on: 2009-12-1
Status: superseded
Superseded by:DL/T 5210.4-2018 Code for construction quality acceptance of electric power construct Part 4: Instrumentation and control equipment
Superseded on:2018-7-1
Abolished on:2018-07-01
Target Language: English
File Format: PDF
Word Count: 65000 words
Translation Price(USD): 700.0
Delivery: via email in 1 business day
1 Scope This Part in DL/T 5210 specifies the relevant requirements in the construction quality acceptance standard for instrumentation and control device ("instrumentation and control", or "I&C"), and quality evaluation for individual project, individual unit and overall project. This Part is applicable to the construction quality acceptance and engineering quality evaluation of I&C device for newly-built, extended and rebuilt thermal power generation projects with unit capacity 300MW~1000MW. The unit capacity construction quality acceptance and evaluation of I&C device for thermal power generation project with unit capacity under 300MW may comply with this Part by reference. 2 Normative References The following normative documents contain provision which, through reference in this text, constitute provisions of this Part. Subsequent amendments (excluding correction to) to, or revisions of, any of these publications do not apply. However, parties to agreements based on this Part are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. For undated references, the latest editions of the normative documents are applicable to this part. GB/T 2624.1-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 1: General principles and requirements GB/T 2624.2-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 2: Orifice plates GB/T 2624.3-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 3: Nozzles and Venturi nozzles GB/T 2624.4-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 4: Venturi tubes GB/T 2887 Specification for Electronic Computer Field GB/T 3733.1 24° cone connectors - Straight thread GB 4830 Pressure range and quality of air supply for the industrial process measurement and control instruments GB/T 5625~5653 Flared couplings - Straight thread GB/T 8624 Classification on burning behaviour for building materials GB/T 9261-1999 Electrical capacitance level meter GB/T 12666 Test method on electric wires or cables under fire conditions GB/T 13399-1992 Specification for steam turbine safety monitoring devices GB/T 13969-1992 Displacement type level instruments GB/T 15414-1994 Generic specification for furnace high-temperature television system GB/T 15415-1994 Methods of measurement for rurnace high-temperature television system GB/T 15479-1995 Technical requirements and test methods of insulation resistance and insulating strength for use in industrial process measurement and control instruments GB/T 50166 Code for installation and acceptance of fire alarm system GB 50168-2006 Code for construction and acceptance of cable system electric equipment installation engineering GB 50257 Code for construction and acceptance of electric device for explosion atmospheres and fire hazard electrical equipment installation engineering GB/T 50375-2006 Evaluating standard for excellent quality of building engineering DL/T 641-2005 Motor-driven valve actuators for power plant DL/T 665 The acceptance standard of water and steam integrated sampling and on-line analyzing unit DL/T 677-1999 Checking and calibration code for on-line chemical analysis instrument of fossil fuel power plant DL/T 855-2004 The code for maintenance and safekeeping of thermal power equipment in electric power construction DL/T 869-2004 The Code of the Welding for Power Plant DL 5009.1 Code of safety operation in power engineering construction Part 1: Steam power plants DL 5011-1992 The code of erection and acceptance of electric power construction - Part of steam turbine unit DL 5027 Specification for Fire Protection of Electric Power Installation DL/T 5035 Technical code for heating ventilation and air conditioning design of fossil fuel power plant DL/T 5047-1995 The Code of Election and Acceptance for Power Plant Construction - Part of boiler unit DL 5053 Design code of labor safety and industrial hygiene for fossil fuel power plants DL/T 5190.5–2004 The Code of Election and Acceptance for Power Plant Construction - Part 5: thermal automation CECS 31 Design specifications for steel cable bridge engineering CECS 81 Technical specification on interference resistance of monitor system for industrial computer CECS 87 Technical specification on wiring works of flexible metallic wire conduit JJG 74 Verification Regulation of selfbalance Display Instruments JJG 535-2004 Verification Regulation of Zirconia Oxygen Analyzers JJG 617-1996 Verification Regulation of Digital Temperature Indicators and Controllers 3 General Provisions 3.0.1 This standard is formulated with a view to intensifying construction engineering quality control in electric power industry, improving construction quality level, and unifying the relevant requirements in construction quality acceptance standard and evaluation for thermal power generation engineering. 3.0.2 The construction quality acceptance for thermal power generation project shall be conducted by batch, subitem, subsection, and subsystem. the construction quality acceptance is only applied with a quality grade "qualified"; in case of any nonconformity, it shall comply with the requirements in Article 4.1.12 in this Part. 3.0.3 The engineering quality evaluation shall be conducted for the projects that apply the "high quality" titles. 3.0.4 The engineering quality evaluation shall be conducted by the three phases (stage) - individual project, individual unit and overall project. 3.0.5 The construction quality evaluation for individual project shall be conducted upon that the construction quality acceptance for all subsystems is qualified and the collection and rearrangement of engineering technical document is completed, and the evaluation shall cover the whole work content before 168-h trial running with full load. 3.0.6 The quality evaluation for individual unit shall be conducted after the construction quality acceptance for all individual projects and the 168-h trial running of the unit with full load are completed and the environmental works supported are normally put into operation. The synergic system shall be bought into the evaluation for the first unit. 3.0.7 The quality evaluation for overall project shall be conducted after the quality evaluation for all individual units, the performance tests of the units and the engineering archives evaluation are completed.
1 Scope 2 Normative References 3 General Provisions 4 Construction quality acceptance 4.1 Requirements in construction quality acceptance 4.2 Division of Construction Quality Acceptance Range and General Tables 4.3 General criteria 4.4 Installation of Sampling element and sensitive element 4.5 Installation of Local Inspection and Control Instrument 4.6 Installation of Control Panel (Console, Box and Cabinet) 4.7 Laying and Wiring of Wire and Cable 4.8 Pipe laying and Connection 4.9 Protection and Grounding 4.10 Debugging and Acceptance of Measuring Instruments and Control Devices 5 Evaluation on the Construction Quality of Individual project 5.1 Basic Requirements 5.2 Evaluation Provisions 5.3 Evaluation Content 5.4 Evaluation Methods 5.5 Construction quality evaluation on installations of sampling element and sensitive element, local testing and control instrument 5.6 Construction quality evaluation of installing control panel (console, box, cabinet) 5.7 Evaluation on construction quality of installing bridge, wire, cable laying and connection 5.8 Evaluation on construction quality of instrument pipe laying and connection 5.9 Evaluation on construction quality of I&C device debugging 5.10 Evaluation score summarized table of each part of individual project 5.11 Report of individual project quality evaluation 6 Quality evaluation of individual unit 7 Overall project quality evaluation Annex A (Normative) Insulation resistance of industrial automation instrument Annex B (Normative) Selection of gasket material Annex C (Normative) The shortest straight pipe segment length shall be required by orifice plate, nozzle and venturi nozzle Annex D (Normative) Sealing test standard of pipe and valve Annex E (Normative) The minimum distance between signal cable and power cable Annex F (Normative) Selection of instrument pipe material and pipe diameter Annex G (Informative) General record table of sampling element and sensitive element installation engineering Annex H (Informative) General record table of local testing and control instrument installation engineering Annex I (Informative) Common record list for installation engineering of control panel (console, box, cabinet) Annex J (Informative) General record list of wire, cable laying and wiring installation Annex K (Informative) General record table of pipe laying and connection Annex L (Informative) General record table of protection and grounding Annex M (Informative) General record table of debugging and acceptance of measuring instrument and control devices for heating engineering
Referred in DL/T 5210.4-2009:
*GB/T 2624.1-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 1: General principles and requirements
*GB/T 2624.2-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 2: Orifice plates
*GB/T 2624.3-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 3: Nozzles and Venturi nozzles
*GB/T 2624.4-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 4: Venturi tubes
*GB/T 2887-2011 General specification for computer field
*GB/T 3733.1-
*GB 4830-
*GB/T 5625-2008 Flared couplings - Straight thread
*GB/T 5626-2008 Flared couplings - Male
*GB/T 5627-2008 Flared couplings - Male long
*GB/T 5628-2008 Flared couplings - Union
*GB/T 5629-2008 Flared couplings - Male elbow
*GB/T 5630-2008 Flared couplings - Union elbow
*GB/T 5631-2008 Flared couplings - Straight thread elbow
*GB/T 5632-2008 Flared couplings - Swivel elbow
*GB/T 5633-2008 Flared couplings - Straight thread branch tee
*GB/T 5634-2008 Flared couplings - Swivel run tee
*GB/T 5635-2008 Flared couplings - Male branch tee
*GB/T 5636-
*GB/T 5637-2008 Flared couplings - Straight thread run tee
*GB/T 5638-2008 Flared couplings - Swivel branch tee
*GB/T 5639-2008 Flared couplings - Union tee
*GB/T 5640-
*GB/T 5641-2008 Flared couplings - Union cross
*GB/T 5642-2008 Flared couplings - Weld male
*GB/T 5643-2008 Flared couplings - Bulkhead union
*GB/T 5644-2008 Flared couplings - Bulkhead union elbow
*GB/T 5645-2008 Flared couplings - Connector for pressure gauge
*GB/T 5646-2008 Flared couplings - Sleeve
*GB/T 5647-2008 Flared couplings - Style A nut
*GB/T 5648-2008 Flared couplings - Style B nut
*GB/T 5649-2008 Flared couplings - Lock nut and lockup washer
*GB/T 5650-2008 Flared couplings - Inverted flare bolts
*GB/T 5651-2008 Flared couplings - Seat insert
*GB/T 5652-2008 Flared couplings - Flared end
*GB/T 5653-2008 Flared couplings - Specification
*GB/T 8624-1997 Classification on burning behaviour for building materials
*GB/T 9261-1999 Electrical capacitance level meter
*GB/T 12666-1990
*GB/T 13399-1992 Specification for steam turbine safety monitoring devices
*GB/T 13969-1992 Displacement type level instruments
*GB/T 15414-1994 Generic specification for furnace high - Temperature television system
*GB/T 15415-1994 Methods of measurement for rurnace high - Temperature teleision system
*GB/T 15479-1995 Technical requirements and test methods of insulation resistance and insulating strength for use in industrial process measurement and control instruments
*GB/T 50166-
*GB 50168-2006 Code for construction and acceptance of cable system electric equipment installation engineering
*GB 50257-2014 Code for construction and acceptance of electric equipment on fire and explosion hazard electric equipment installation engineering
*GB/T 50375-2006 Evaluating standard for excellent quality of building engineering
*DL/T 641-2005 Electric valve actuators for power plant
*DL/T 665-2009 Inspection guide for water and steam integrated sampling and on-line analysing unit
*DL/T 677-1999 Checking and calibration code for on-line chemical analysis instrument of fossil fuel power plant
*DL/T 855-2004 The code for maintenance and safekeeping of thermal power equipment in electric power construction
*DL/T 869-2004 The code of welding for power plant
*DL 5009.1-2014 Safety work order for electric power construction - Part 1: Thermal power generation
*DL 5011-1992 The code of erection and acceptance of electric power construction section of steam turbine set
*DL/T 5035-2016 Code for design of heating ventilation and air conditioning in power plants
*DL/T 5047-1995 The Code of Erection and Acceptance of Electric Power Construction Section of Steam Boiler Set
*DL 5053-2012 Code for the design of occupational safety in fossil-fired power plant
*DL/T 5190.5–2004-
*CECS 31-2006 Code for design of steel cable tray engineering
*CECS 81-1996 Technical Standard on Anti-interference of industrial computer monitoring and controlling system
*CECS 87-1996 Flexible metal wire protection tube wiring project technical specification (with explanation)
*JJG 74-2005 Verification Regulation of Recorders for Industrial - Process Measurement
*JJG 535-2004 Verification Regulation of Zirconia Oxygen Analyzers
*JJG 617-1996 Verification Regulation of Digital Temperaure Indicators and Controllers
Code of China
Standard
DL/T 5210.4-2009  Code for construction quality acceptance and evaluation of electric power construct Part 4:instrumentation and control (English Version)
Standard No.DL/T 5210.4-2009
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count65000 words
Price(USD)700.0
Implemented on2009-12-1
Deliveryvia email in 1 business day
Detail of DL/T 5210.4-2009
Standard No.
DL/T 5210.4-2009
English Name
Code for construction quality acceptance and evaluation of electric power construct Part 4:instrumentation and control
Chinese Name
电力建设施工质量验收及评价规程 第4部分:热工仪表及控制装置
Chinese Classification
F20
Professional Classification
DL
ICS Classification
Issued by
Ministry of Railway
Issued on
2009-7-22
Implemented on
2009-12-1
Status
superseded
Superseded by
DL/T 5210.4-2018 Code for construction quality acceptance of electric power construct Part 4: Instrumentation and control equipment
Superseded on
2018-7-1
Abolished on
2018-07-01
Superseding
Language
English
File Format
PDF
Word Count
65000 words
Price(USD)
700.0
Keywords
DL/T 5210.4-2009, DL 5210.4-2009, DLT 5210.4-2009, DL/T5210.4-2009, DL/T 5210.4, DL/T5210.4, DL5210.4-2009, DL 5210.4, DL5210.4, DLT5210.4-2009, DLT 5210.4, DLT5210.4
Introduction of DL/T 5210.4-2009
1 Scope This Part in DL/T 5210 specifies the relevant requirements in the construction quality acceptance standard for instrumentation and control device ("instrumentation and control", or "I&C"), and quality evaluation for individual project, individual unit and overall project. This Part is applicable to the construction quality acceptance and engineering quality evaluation of I&C device for newly-built, extended and rebuilt thermal power generation projects with unit capacity 300MW~1000MW. The unit capacity construction quality acceptance and evaluation of I&C device for thermal power generation project with unit capacity under 300MW may comply with this Part by reference. 2 Normative References The following normative documents contain provision which, through reference in this text, constitute provisions of this Part. Subsequent amendments (excluding correction to) to, or revisions of, any of these publications do not apply. However, parties to agreements based on this Part are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. For undated references, the latest editions of the normative documents are applicable to this part. GB/T 2624.1-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 1: General principles and requirements GB/T 2624.2-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 2: Orifice plates GB/T 2624.3-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 3: Nozzles and Venturi nozzles GB/T 2624.4-2006 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 4: Venturi tubes GB/T 2887 Specification for Electronic Computer Field GB/T 3733.1 24° cone connectors - Straight thread GB 4830 Pressure range and quality of air supply for the industrial process measurement and control instruments GB/T 5625~5653 Flared couplings - Straight thread GB/T 8624 Classification on burning behaviour for building materials GB/T 9261-1999 Electrical capacitance level meter GB/T 12666 Test method on electric wires or cables under fire conditions GB/T 13399-1992 Specification for steam turbine safety monitoring devices GB/T 13969-1992 Displacement type level instruments GB/T 15414-1994 Generic specification for furnace high-temperature television system GB/T 15415-1994 Methods of measurement for rurnace high-temperature television system GB/T 15479-1995 Technical requirements and test methods of insulation resistance and insulating strength for use in industrial process measurement and control instruments GB/T 50166 Code for installation and acceptance of fire alarm system GB 50168-2006 Code for construction and acceptance of cable system electric equipment installation engineering GB 50257 Code for construction and acceptance of electric device for explosion atmospheres and fire hazard electrical equipment installation engineering GB/T 50375-2006 Evaluating standard for excellent quality of building engineering DL/T 641-2005 Motor-driven valve actuators for power plant DL/T 665 The acceptance standard of water and steam integrated sampling and on-line analyzing unit DL/T 677-1999 Checking and calibration code for on-line chemical analysis instrument of fossil fuel power plant DL/T 855-2004 The code for maintenance and safekeeping of thermal power equipment in electric power construction DL/T 869-2004 The Code of the Welding for Power Plant DL 5009.1 Code of safety operation in power engineering construction Part 1: Steam power plants DL 5011-1992 The code of erection and acceptance of electric power construction - Part of steam turbine unit DL 5027 Specification for Fire Protection of Electric Power Installation DL/T 5035 Technical code for heating ventilation and air conditioning design of fossil fuel power plant DL/T 5047-1995 The Code of Election and Acceptance for Power Plant Construction - Part of boiler unit DL 5053 Design code of labor safety and industrial hygiene for fossil fuel power plants DL/T 5190.5–2004 The Code of Election and Acceptance for Power Plant Construction - Part 5: thermal automation CECS 31 Design specifications for steel cable bridge engineering CECS 81 Technical specification on interference resistance of monitor system for industrial computer CECS 87 Technical specification on wiring works of flexible metallic wire conduit JJG 74 Verification Regulation of selfbalance Display Instruments JJG 535-2004 Verification Regulation of Zirconia Oxygen Analyzers JJG 617-1996 Verification Regulation of Digital Temperature Indicators and Controllers 3 General Provisions 3.0.1 This standard is formulated with a view to intensifying construction engineering quality control in electric power industry, improving construction quality level, and unifying the relevant requirements in construction quality acceptance standard and evaluation for thermal power generation engineering. 3.0.2 The construction quality acceptance for thermal power generation project shall be conducted by batch, subitem, subsection, and subsystem. the construction quality acceptance is only applied with a quality grade "qualified"; in case of any nonconformity, it shall comply with the requirements in Article 4.1.12 in this Part. 3.0.3 The engineering quality evaluation shall be conducted for the projects that apply the "high quality" titles. 3.0.4 The engineering quality evaluation shall be conducted by the three phases (stage) - individual project, individual unit and overall project. 3.0.5 The construction quality evaluation for individual project shall be conducted upon that the construction quality acceptance for all subsystems is qualified and the collection and rearrangement of engineering technical document is completed, and the evaluation shall cover the whole work content before 168-h trial running with full load. 3.0.6 The quality evaluation for individual unit shall be conducted after the construction quality acceptance for all individual projects and the 168-h trial running of the unit with full load are completed and the environmental works supported are normally put into operation. The synergic system shall be bought into the evaluation for the first unit. 3.0.7 The quality evaluation for overall project shall be conducted after the quality evaluation for all individual units, the performance tests of the units and the engineering archives evaluation are completed.
Contents of DL/T 5210.4-2009
1 Scope 2 Normative References 3 General Provisions 4 Construction quality acceptance 4.1 Requirements in construction quality acceptance 4.2 Division of Construction Quality Acceptance Range and General Tables 4.3 General criteria 4.4 Installation of Sampling element and sensitive element 4.5 Installation of Local Inspection and Control Instrument 4.6 Installation of Control Panel (Console, Box and Cabinet) 4.7 Laying and Wiring of Wire and Cable 4.8 Pipe laying and Connection 4.9 Protection and Grounding 4.10 Debugging and Acceptance of Measuring Instruments and Control Devices 5 Evaluation on the Construction Quality of Individual project 5.1 Basic Requirements 5.2 Evaluation Provisions 5.3 Evaluation Content 5.4 Evaluation Methods 5.5 Construction quality evaluation on installations of sampling element and sensitive element, local testing and control instrument 5.6 Construction quality evaluation of installing control panel (console, box, cabinet) 5.7 Evaluation on construction quality of installing bridge, wire, cable laying and connection 5.8 Evaluation on construction quality of instrument pipe laying and connection 5.9 Evaluation on construction quality of I&C device debugging 5.10 Evaluation score summarized table of each part of individual project 5.11 Report of individual project quality evaluation 6 Quality evaluation of individual unit 7 Overall project quality evaluation Annex A (Normative) Insulation resistance of industrial automation instrument Annex B (Normative) Selection of gasket material Annex C (Normative) The shortest straight pipe segment length shall be required by orifice plate, nozzle and venturi nozzle Annex D (Normative) Sealing test standard of pipe and valve Annex E (Normative) The minimum distance between signal cable and power cable Annex F (Normative) Selection of instrument pipe material and pipe diameter Annex G (Informative) General record table of sampling element and sensitive element installation engineering Annex H (Informative) General record table of local testing and control instrument installation engineering Annex I (Informative) Common record list for installation engineering of control panel (console, box, cabinet) Annex J (Informative) General record list of wire, cable laying and wiring installation Annex K (Informative) General record table of pipe laying and connection Annex L (Informative) General record table of protection and grounding Annex M (Informative) General record table of debugging and acceptance of measuring instrument and control devices for heating engineering
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5210.4-2009, DL 5210.4-2009, DLT 5210.4-2009, DL/T5210.4-2009, DL/T 5210.4, DL/T5210.4, DL5210.4-2009, DL 5210.4, DL5210.4, DLT5210.4-2009, DLT 5210.4, DLT5210.4