2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 899-2004
DL/T 899-2004   Loading tests on tower and pole structures of overhead line (English Version)
Standard No.: DL/T 899-2004 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 3000 words Translation Price(USD):60.0 remind me the price change

Email:

Implemented on:2005-6-1 Delivery: via email in 1 business day

→ → →

,2012-12-1,2005-6-1,1411374237827317B395910641745
Standard No.: DL/T 899-2004
English Name: Loading tests on tower and pole structures of overhead line
Chinese Name: 架空线路杆塔结构荷载试验
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NDRC
Issued on: 2004-12-14
Implemented on: 2005-6-1
Status: superseded
Superseded by:DL/T 899-2012 Loading tests on tower and pole structures of overhead line
Superseded on:2012-12-1
Target Language: English
File Format: PDF
Word Count: 3000 words
Translation Price(USD): 60.0
Delivery: via email in 1 business day
Loading Tests on Tower and Pole Structures of Overhead Line 架空线路杆塔结构荷载试验 1 Scope This standard specifies the test method on tower and pole structures of overhead line. This standard is applicable to loading tests on full-scale tower and pole structures of overhead line with voltage grade of 35kV or above. Loading tests on power transformation framework, tower and pole with low voltage grade, tower and pole for communication, overhead electrification framework for railway or rail, support for street lighting, wind turbine tower or sling framework may be carried out by reference to this standard. This standard is not applicable to model test. Materials used for tower and pole in this standard include (but not limited to) metal, concrete, wood, plywood and synthetic materials. 2 Normative References The following documents contain provisions which, through reference in this standard, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding corrections to), or revisions of, any of these publications do not apply. However, the parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards. For undated references, the latest edition of the normative document referred to applies. GB/T 228-2002 Metallic Materials - Tensile Testing at Ambient Temperature [eqv ISO 6892:1998 (E)] GB/T 15481-2000 General Requirements for the Competence of Testing and Calibration Laboratories (ISO/IEC 17025:1990, idt) 3 General 3.1 This standard is hereby formulated with a view to standardizing loading tests on tower and pole structures. 3.2 Limit state design theory based on probability theory is uniformly adopted to analyze and judge whether the tested tower and pole pass the test. 4 Terms and Definitions For the purpose of this standard, the following terms and definitions apply. 4.1 Client Organization that signs the contract with the test station and provides the technical requirements of the test. 4.2 Design load Design load of towers and poles. 4.3 Loading case Load combination used for design of tower and pole structures. 4.4 Main control loading case A kind of or several kinds of loading case controlling the strength or stability of primary member under normal operation. 4.5 Failure load Critical load at the failure of tower and pole structures. 4.6 Test report Summary document of information, data and conclusion relevant to the test. 5 Test Classification According to different test purposes and acceptance criteria, tests on tower and pole are classified into verification test and sampling test. 5.1 Verification test Verification test is used to design and verify full-scale tower and pole, the test purposes are as follows: a) As part of the study or development of new tower and pole; b) To inspect the conformance of design characteristics for tower and pole structures (may be regarded as type test); c) To study and verify new design criteria or design methods; d) To study and verify new manufacturing process. Integral structure should be adopted for verification test on tower and pole, partial or local structure may also be adopted. Design load shall be at least carried out for main control loading case of verification test. 5.2 Sampling test Sampling test is used to inspect the manufacturing quality and material quality of the batch of tower and pole prior to use or in the production process. The tested tower and pole shall be randomly chosen from the towers and poles. Sampling test shall be carried out to the load specified in the technical requirements of the test (provided by client). 6 Basic Requirements 6.1 For verification test [about b) and c) of 5.1], materials and manufacturing process used for the tested tower and pole shall be of the same technical conditions and technical requirements with towers and poles. These technical conditions and requirements include property of member section, connection construction (such as bolt specification and weld size), material grade and production process. Whether tower and pole members used for verification test contain anticorrosive coating shall be determined by client. Client or representative of client shall enter the test station to supervise the whole process of the test, and may directly propose specific requirements relevant to the test to the test station in the test process. 6.2 For sampling test, samples shall be randomly chosen from the batch of towers and poles. 6.3 Whether verification test or sampling test, the tested tower and pole shall bear the load specified in the technical requirements for the test. 6.4 The test station shall pass the examination recognition and measurement certification of external agency in accordance with "General requirements for the competence of testing and calibration laboratories" (GB/T 15481-2000). 7 Technical Requirements for the Test
Foreword I 1 Scope 2 Normative References 3 General 4 Terms and Definitions 5 Test Classification 6 Basic Requirements 7 Technical Requirements of the Test 8 Test Scheme 9 Installation 10 Load 11 Measurement 12 Loading Case Order 13 Image Record 14 Early Failure 15 Acceptance 16 Member Inspection 17 Test Report 18 Record and Traceability
Referred in DL/T 899-2004:
*GB/T 228-2002 Metallic Materials – Tensile Testing at Ambient Temperature
*GB/T 15481-2000 General requirements for the competence of testing and calibration laboratories
Code of China
Standard
DL/T 899-2004   Loading tests on tower and pole structures of overhead line (English Version)
Standard No.DL/T 899-2004
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count3000 words
Price(USD)60.0
Implemented on2005-6-1
Deliveryvia email in 1 business day
Detail of DL/T 899-2004
Standard No.
DL/T 899-2004
English Name
Loading tests on tower and pole structures of overhead line
Chinese Name
架空线路杆塔结构荷载试验
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2004-12-14
Implemented on
2005-6-1
Status
superseded
Superseded by
DL/T 899-2012 Loading tests on tower and pole structures of overhead line
Superseded on
2012-12-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
3000 words
Price(USD)
60.0
Keywords
DL/T 899-2004, DL 899-2004, DLT 899-2004, DL/T899-2004, DL/T 899, DL/T899, DL899-2004, DL 899, DL899, DLT899-2004, DLT 899, DLT899
Introduction of DL/T 899-2004
Loading Tests on Tower and Pole Structures of Overhead Line 架空线路杆塔结构荷载试验 1 Scope This standard specifies the test method on tower and pole structures of overhead line. This standard is applicable to loading tests on full-scale tower and pole structures of overhead line with voltage grade of 35kV or above. Loading tests on power transformation framework, tower and pole with low voltage grade, tower and pole for communication, overhead electrification framework for railway or rail, support for street lighting, wind turbine tower or sling framework may be carried out by reference to this standard. This standard is not applicable to model test. Materials used for tower and pole in this standard include (but not limited to) metal, concrete, wood, plywood and synthetic materials. 2 Normative References The following documents contain provisions which, through reference in this standard, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding corrections to), or revisions of, any of these publications do not apply. However, the parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards. For undated references, the latest edition of the normative document referred to applies. GB/T 228-2002 Metallic Materials - Tensile Testing at Ambient Temperature [eqv ISO 6892:1998 (E)] GB/T 15481-2000 General Requirements for the Competence of Testing and Calibration Laboratories (ISO/IEC 17025:1990, idt) 3 General 3.1 This standard is hereby formulated with a view to standardizing loading tests on tower and pole structures. 3.2 Limit state design theory based on probability theory is uniformly adopted to analyze and judge whether the tested tower and pole pass the test. 4 Terms and Definitions For the purpose of this standard, the following terms and definitions apply. 4.1 Client Organization that signs the contract with the test station and provides the technical requirements of the test. 4.2 Design load Design load of towers and poles. 4.3 Loading case Load combination used for design of tower and pole structures. 4.4 Main control loading case A kind of or several kinds of loading case controlling the strength or stability of primary member under normal operation. 4.5 Failure load Critical load at the failure of tower and pole structures. 4.6 Test report Summary document of information, data and conclusion relevant to the test. 5 Test Classification According to different test purposes and acceptance criteria, tests on tower and pole are classified into verification test and sampling test. 5.1 Verification test Verification test is used to design and verify full-scale tower and pole, the test purposes are as follows: a) As part of the study or development of new tower and pole; b) To inspect the conformance of design characteristics for tower and pole structures (may be regarded as type test); c) To study and verify new design criteria or design methods; d) To study and verify new manufacturing process. Integral structure should be adopted for verification test on tower and pole, partial or local structure may also be adopted. Design load shall be at least carried out for main control loading case of verification test. 5.2 Sampling test Sampling test is used to inspect the manufacturing quality and material quality of the batch of tower and pole prior to use or in the production process. The tested tower and pole shall be randomly chosen from the towers and poles. Sampling test shall be carried out to the load specified in the technical requirements of the test (provided by client). 6 Basic Requirements 6.1 For verification test [about b) and c) of 5.1], materials and manufacturing process used for the tested tower and pole shall be of the same technical conditions and technical requirements with towers and poles. These technical conditions and requirements include property of member section, connection construction (such as bolt specification and weld size), material grade and production process. Whether tower and pole members used for verification test contain anticorrosive coating shall be determined by client. Client or representative of client shall enter the test station to supervise the whole process of the test, and may directly propose specific requirements relevant to the test to the test station in the test process. 6.2 For sampling test, samples shall be randomly chosen from the batch of towers and poles. 6.3 Whether verification test or sampling test, the tested tower and pole shall bear the load specified in the technical requirements for the test. 6.4 The test station shall pass the examination recognition and measurement certification of external agency in accordance with "General requirements for the competence of testing and calibration laboratories" (GB/T 15481-2000). 7 Technical Requirements for the Test
Contents of DL/T 899-2004
Foreword I 1 Scope 2 Normative References 3 General 4 Terms and Definitions 5 Test Classification 6 Basic Requirements 7 Technical Requirements of the Test 8 Test Scheme 9 Installation 10 Load 11 Measurement 12 Loading Case Order 13 Image Record 14 Early Failure 15 Acceptance 16 Member Inspection 17 Test Report 18 Record and Traceability
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 899-2004, DL 899-2004, DLT 899-2004, DL/T899-2004, DL/T 899, DL/T899, DL899-2004, DL 899, DL899, DLT899-2004, DLT 899, DLT899