GBJ 148-1990   Code of Construction and Acceptance of Power Transformer, Oil-immersed Transformer and Current Transformer in Electrical Installation Engineering (English Version)
Standard No.: GBJ 148-1990 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 25000 words Price(USD):620.0 remind me the price change

Email:

Implemented on:1991-10-1 Delivery: via email in 1 business day
,,
Standard No.: GBJ 148-1990
English Name: Code of Construction and Acceptance of Power Transformer, Oil-immersed Transformer and Current Transformer in Electrical Installation Engineering
Chinese Name: 电气装置安装工程电力变压器、油浸电抗器、互感器施工及验收规范
Professional Classification: GB    National Standard
Issued by: MOC
Issued on: 1990-12-30
Implemented on: 1991-10-1
Status: superseded
Superseded by:GB 50148-2010 Code for Construction and Acceptance of Power Transformers, Oil Reactor and Mutual Inductor
Superseded on:2010-12-1
Language: English
File Format: PDF
Word Count: 25000 words
Price(USD): 620.0
Delivery: via email in 1 business day
1.0.1 This code is made for the purpose to guarantee installation quality of power transformers, oil-immersed reactors (hereinafter referred to as reactors), voltage transformers and current transformers (hereinafter referred to as transformers) in HV electrical construction, improve installation technology and ensure safe and reliable operation of the equipment. 1.0.2 This code is applicable for construction and acceptance of installation engineering for power transformers, reactors, transformers of AC 500 kV and lower, 50 Hz. For the installation of extinction coil, Section 2 of this Code can apply. The installation of special use transformers, reactors and transformers shall conform to the specification of the manufacturers and departments concerned. 1.0.3 The HV electrical apparatus shall be installed in the way that has been approved. 1.0.4 The equipment and material shall be transported and stored in compliance with this Code. In case that the product has special requirement, the special requirement shall be met. 1.0.5 Storage of equipment and material before installation shall be limited to 1 year or shorter. In case of long-term storage, special regulation for storage of equipment and material shall apply. 1.0.6 Equipment and material to be used shall conform to the applicable national technical standards, with qualified certificates and nameplates. 1.0.7 After equipment and material arrive at site, acceptance inspection shall be made timely as follows: 1.0.7.1 Package and sealing are good. 1.0.7.2 Open-box inspection, specifications meets the design requirement, accessories and spare parts are complete. 1.0.7.3 Technical documents of the product are complete. 1.0.7.4 Visual inspection shall be made as per this Code. 1.0.8 Safe technical measures used in the construction shall conform to this Code and relevant applicable safe technical standards and technical documents of the product. 1.0.9 Construction of buildings related to installation of power transformers, reactors and transformers shall meet the following requirements: 1.0.9.1 Construction quality of buildings and structures in connection with the installation of power transformers, reactors and transformers shall conform to the relevant specification predefined in the national applicable code of construction and acceptance of building construction. In case of special requirement in the equipment and design, special requirement shall be met. 1.0.9.2 Prior to installation of equipment, following conditions shall be made available: 1) Roofing and floor plates are completed without any leakage 2) The indoor flooring base is completed, and floor elevation is marked on the wall 3) Concrete foundation and structure reach the allowable strength and rigidity for installation, and quality of the welding assembly shall conform to the requirement. 4) The embedded parts and preformed holes shall conform to design and embedded parts shall be fastened. 5) The formwork, construction facilities and contaminants shall be cleared away, 6) To leave sufficient space for installation and to keep the roads for construction straightway. 1.0.9.3 After installation and before the equipment is put into use, the building works shall meet the following: 1) Doors and windows have been fixed. 2) The floor has been trowelled and outside yard leveled. 3) Facilites like protective guards and handrails are complete. 4) The oil sump of transformers and reactors shall be clean, the drain piping is unobstructed, and pebble paving is completed. 5) Ventilation and fire-protection facilities have been installed. 6) The work that cannot be performed or affects safe running after power is supplied shall be completed 1.0.10 The fasteners used for equipment installation shall be galvanized products except anchor bolts; the fasteners used outdoors shall be galvanized products; 1.0.11 The surface quality of power transformers, reactors and transformers shall conform to the applicable national standard “Technical Specification of Porcelain Unit of High-tension Insulator”. 1.0.12 In addition to this Code, construction and acceptance of power transformers, reactors and transformers shall conform to the relevant national applicable standards.
GBJ 148-1990 is referred in:
* SY 4206-2007 Code for Quality Acceptance of Oil and Gas Construction Engineering-Electrical Engineering
* DL/T 461-2004 Guide for operation and the maintenance of electrostatic precipitators for coal-fired power plants
* GB/T 17468-2008 The Guide for Choice Power Transformers
* DL/T 572-2010 Operation specification for power transformer
* MH 5012-2010 Code of Acceptance of Contruction Quality of Civil Airport Visual Aids
*GB/T 17495-2009 The harbour portal crane
*DL/T 574-2010 Guide to the Operation and the Maintenance of Tap-changers in the Transformer
Code of China
Standard
GBJ 148-1990  Code of Construction and Acceptance of Power Transformer, Oil-immersed Transformer and Current Transformer in Electrical Installation Engineering (English Version)
Standard No.GBJ 148-1990
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count25000 words
Price(USD)620.0
Implemented on1991-10-1
Deliveryvia email in 1 business day
Detail of GBJ 148-1990
Standard No.
GBJ 148-1990
English Name
Code of Construction and Acceptance of Power Transformer, Oil-immersed Transformer and Current Transformer in Electrical Installation Engineering
Chinese Name
电气装置安装工程电力变压器、油浸电抗器、互感器施工及验收规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOC
Issued on
1990-12-30
Implemented on
1991-10-1
Status
superseded
Superseded by
GB 50148-2010 Code for Construction and Acceptance of Power Transformers, Oil Reactor and Mutual Inductor
Superseded on
2010-12-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
25000 words
Price(USD)
620.0
Keywords
GBJ 148-1990, GBJ/T 148-1990, GBJT 148-1990, GBJ148-1990, GBJ 148, GBJ148, GBJ/T148-1990, GBJ/T 148, GBJ/T148, GBJT148-1990, GBJT 148, GBJT148
Introduction of GBJ 148-1990
1.0.1 This code is made for the purpose to guarantee installation quality of power transformers, oil-immersed reactors (hereinafter referred to as reactors), voltage transformers and current transformers (hereinafter referred to as transformers) in HV electrical construction, improve installation technology and ensure safe and reliable operation of the equipment. 1.0.2 This code is applicable for construction and acceptance of installation engineering for power transformers, reactors, transformers of AC 500 kV and lower, 50 Hz. For the installation of extinction coil, Section 2 of this Code can apply. The installation of special use transformers, reactors and transformers shall conform to the specification of the manufacturers and departments concerned. 1.0.3 The HV electrical apparatus shall be installed in the way that has been approved. 1.0.4 The equipment and material shall be transported and stored in compliance with this Code. In case that the product has special requirement, the special requirement shall be met. 1.0.5 Storage of equipment and material before installation shall be limited to 1 year or shorter. In case of long-term storage, special regulation for storage of equipment and material shall apply. 1.0.6 Equipment and material to be used shall conform to the applicable national technical standards, with qualified certificates and nameplates. 1.0.7 After equipment and material arrive at site, acceptance inspection shall be made timely as follows: 1.0.7.1 Package and sealing are good. 1.0.7.2 Open-box inspection, specifications meets the design requirement, accessories and spare parts are complete. 1.0.7.3 Technical documents of the product are complete. 1.0.7.4 Visual inspection shall be made as per this Code. 1.0.8 Safe technical measures used in the construction shall conform to this Code and relevant applicable safe technical standards and technical documents of the product. 1.0.9 Construction of buildings related to installation of power transformers, reactors and transformers shall meet the following requirements: 1.0.9.1 Construction quality of buildings and structures in connection with the installation of power transformers, reactors and transformers shall conform to the relevant specification predefined in the national applicable code of construction and acceptance of building construction. In case of special requirement in the equipment and design, special requirement shall be met. 1.0.9.2 Prior to installation of equipment, following conditions shall be made available: 1) Roofing and floor plates are completed without any leakage 2) The indoor flooring base is completed, and floor elevation is marked on the wall 3) Concrete foundation and structure reach the allowable strength and rigidity for installation, and quality of the welding assembly shall conform to the requirement. 4) The embedded parts and preformed holes shall conform to design and embedded parts shall be fastened. 5) The formwork, construction facilities and contaminants shall be cleared away, 6) To leave sufficient space for installation and to keep the roads for construction straightway. 1.0.9.3 After installation and before the equipment is put into use, the building works shall meet the following: 1) Doors and windows have been fixed. 2) The floor has been trowelled and outside yard leveled. 3) Facilites like protective guards and handrails are complete. 4) The oil sump of transformers and reactors shall be clean, the drain piping is unobstructed, and pebble paving is completed. 5) Ventilation and fire-protection facilities have been installed. 6) The work that cannot be performed or affects safe running after power is supplied shall be completed 1.0.10 The fasteners used for equipment installation shall be galvanized products except anchor bolts; the fasteners used outdoors shall be galvanized products; 1.0.11 The surface quality of power transformers, reactors and transformers shall conform to the applicable national standard “Technical Specification of Porcelain Unit of High-tension Insulator”. 1.0.12 In addition to this Code, construction and acceptance of power transformers, reactors and transformers shall conform to the relevant national applicable standards.
Contents of GBJ 148-1990
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GBJ 148-1990, GBJ/T 148-1990, GBJT 148-1990, GBJ148-1990, GBJ 148, GBJ148, GBJ/T148-1990, GBJ/T 148, GBJ/T148, GBJT148-1990, GBJT 148, GBJT148