2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 2828.5-2011
GB/T 2828.5-2011   Sampling procedures for inspection by attributes—Part 5:System of sequential sampling plans indexed by acceptance quality limit(AQL)for lot-by-lot inspection (English Version)
Standard No.: GB/T 2828.5-2011 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 18000 words Translation Price(USD):450.0 remind me the price change

Email:

Implemented on:2011-12-1 Delivery: via email in 1 business day

→ → →

,,2011-12-1,1411381818966087F1A0492D4EA92
Standard No.: GB/T 2828.5-2011
English Name: Sampling procedures for inspection by attributes—Part 5:System of sequential sampling plans indexed by acceptance quality limit(AQL)for lot-by-lot inspection
Chinese Name: 计数抽样检验程序 第5部分:按接收质量限(AQL)检索的逐批序贯抽样检验系统
Chinese Classification: A41    Mathematics
Professional Classification: GB    National Standard
ICS Classification: 03.120.30 03.120.30    Application of statistical methods 03.120.30
Source Content Issued by: AQSIQ; SAC
Issued on: 2011-07-29
Implemented on: 2011-12-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 18000 words
Translation Price(USD): 450.0
Delivery: via email in 1 business day
1 Scope This part of GB/T 2828 specifies sequential sampling schemes that supplement the GB/T 2828.1 acceptance sampling system for inspection by attributes. The GB/T 2828.1 acceptance sampling system is indexed in terms of the acceptance quality limit (AQL). Its purpose is to induce a supplier, through the economic and psychological pressure of lot non-acceptance, to maintain a process average at least as good as the specified acceptance quality limit, while at the same time providing an upper limit for the risk to the consumer of accepting the occasional poor lot. The sampling schemes defined in this part of GB/T 2828 are applicable, but not limited, to the inspection of: ——end items, ——components and raw materials, ——operations, ——materials in process, ——supplies in storage, ——maintenance, ——data or records, and ——administrative procedures. These schemes are designed to be applied to a continuing series of lots, that is, a series long enough to permit the switching rules in 10.3 to be applied. These switching rules provide a) enhanced protection to the consumer (by means of tightened sampling inspection criteria or discontinuation of sampling inspection) should deterioration in quality occur, b) an incentive, at the discretion of the responsible authority, to reduce inspection costs (by means of reduced sampling inspection criteria) should consistently good quality be demonstrated over time. The individual sampling plans are not designed to be used outside of the schemes in which they are presented. Where lots are produced in isolation or in a series too short for this part of GB/T 2828 to apply, the user is advised to consult GB/T 2828.2 or GB/T 8051 for appropriate sampling plans. 2 Normative References The following document is essential for the application of this Standard. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) is applicable to this document. GB/T 2828.1-2003 Sampling procedures for inspection by attributea-Part1:Sampling schemes indexed by acceptance quality limit(AQL) for lot-by-lot inspection (ISC)2859-1:1999, IDT) GB/T 3358.2-2009 Statistics—Vocabulary and symbols—Part 2:Applied statistics (ISO 3534-2:2006, IDT)
Contents Foreword 1 Scope 2 Normative References 3 Terms and definitions 4 Symbols and abbreviated terms 5 Expression of nonconformity 5.1 General 5.2 Classification of nonconformities 6 Acceptance quality limit (AQL) 6.1 Use and application 6.2 Specifying AQLs 6.3 Preferred AQLs 7 Submission of product for sampling 7.1 Formation of lots 7.2 Presentation of lots 8 Acceptance and non-acceptance 8.1 Acceptability of lots 8.2 Disposition of non-acceptable lots 8.3 Nonconforming items 8.4 Classes of nonconformities or nonconforming items 8.5 Special reservation for critical classes of nonconformities 8.6 Resubmitted lots 9 Drawing of samples 9.1 Sample selection 9.2 Time for drawing the samples 10 Normal, tightened and reduced inspection 10.1 Start of inspection 10.2 Continuation of inspection 10.3 Switching rules and procedures (see Figure 1) 10.4 Discontinuation of inspection 11 Sampling plans 11.1 Inspection level 11.2 Sample size code letters 11.3 Obtaining a sampling plan 11.4 Operation of a sequential sampling plan 11.5 Numerical examples 12 Determination of acceptability 12.1 Inspection for nonconforming items 12.2 Inspection for nonconformities 13 Further information 13.1 Operating characteristic (OC) curves 13.2 Process average 13.3 Use of individual plans 14 Tables Annex A (normative) Sampling plans for normal inspection Annex B (normative) Sampling plans for tightened inspection Annex C (normative) Sampling plans for reduced inspection Annex D (informative) Average sample numbers for sequential sampling plans
Referred in GB/T 2828.5-2011:
* GB/T 2828.1-2003 Sampling procedures for inspection by attributea-Part1:Sampling schemes indexed by acceptance quality limit(AQL) for lot-by-lot inspection
* GB/T 3358.2-2009 Statistics—Vocabulary and symbols—Part 2:Applied statistics
GB/T 2828.5-2011 is referred in:
*GB/T 2828.10-2010 Sampling procedures for inspection by attributes―Part 10:Introduction to the GB/T 2828 series of standards for sampling for inspection by attributes
*GB/T 42063-2022 Sharps injury protection—Requirements and test methods—Sharps protection features for single-use hypodermic needles, introducers for catheters and needles used for blood sampling
Code of China
Standard
GB/T 2828.5-2011  Sampling procedures for inspection by attributes—Part 5:System of sequential sampling plans indexed by acceptance quality limit(AQL)for lot-by-lot inspection (English Version)
Standard No.GB/T 2828.5-2011
Statusvalid
LanguageEnglish
File FormatPDF
Word Count18000 words
Price(USD)450.0
Implemented on2011-12-1
Deliveryvia email in 1 business day
Detail of GB/T 2828.5-2011
Standard No.
GB/T 2828.5-2011
English Name
Sampling procedures for inspection by attributes—Part 5:System of sequential sampling plans indexed by acceptance quality limit(AQL)for lot-by-lot inspection
Chinese Name
计数抽样检验程序 第5部分:按接收质量限(AQL)检索的逐批序贯抽样检验系统
Chinese Classification
A41
Professional Classification
GB
ICS Classification
Issued by
AQSIQ; SAC
Issued on
2011-07-29
Implemented on
2011-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
18000 words
Price(USD)
450.0
Keywords
GB/T 2828.5-2011, GB 2828.5-2011, GBT 2828.5-2011, GB/T2828.5-2011, GB/T 2828.5, GB/T2828.5, GB2828.5-2011, GB 2828.5, GB2828.5, GBT2828.5-2011, GBT 2828.5, GBT2828.5
Introduction of GB/T 2828.5-2011
1 Scope This part of GB/T 2828 specifies sequential sampling schemes that supplement the GB/T 2828.1 acceptance sampling system for inspection by attributes. The GB/T 2828.1 acceptance sampling system is indexed in terms of the acceptance quality limit (AQL). Its purpose is to induce a supplier, through the economic and psychological pressure of lot non-acceptance, to maintain a process average at least as good as the specified acceptance quality limit, while at the same time providing an upper limit for the risk to the consumer of accepting the occasional poor lot. The sampling schemes defined in this part of GB/T 2828 are applicable, but not limited, to the inspection of: ——end items, ——components and raw materials, ——operations, ——materials in process, ——supplies in storage, ——maintenance, ——data or records, and ——administrative procedures. These schemes are designed to be applied to a continuing series of lots, that is, a series long enough to permit the switching rules in 10.3 to be applied. These switching rules provide a) enhanced protection to the consumer (by means of tightened sampling inspection criteria or discontinuation of sampling inspection) should deterioration in quality occur, b) an incentive, at the discretion of the responsible authority, to reduce inspection costs (by means of reduced sampling inspection criteria) should consistently good quality be demonstrated over time. The individual sampling plans are not designed to be used outside of the schemes in which they are presented. Where lots are produced in isolation or in a series too short for this part of GB/T 2828 to apply, the user is advised to consult GB/T 2828.2 or GB/T 8051 for appropriate sampling plans. 2 Normative References The following document is essential for the application of this Standard. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) is applicable to this document. GB/T 2828.1-2003 Sampling procedures for inspection by attributea-Part1:Sampling schemes indexed by acceptance quality limit(AQL) for lot-by-lot inspection (ISC)2859-1:1999, IDT) GB/T 3358.2-2009 Statistics—Vocabulary and symbols—Part 2:Applied statistics (ISO 3534-2:2006, IDT)
Contents of GB/T 2828.5-2011
Contents Foreword 1 Scope 2 Normative References 3 Terms and definitions 4 Symbols and abbreviated terms 5 Expression of nonconformity 5.1 General 5.2 Classification of nonconformities 6 Acceptance quality limit (AQL) 6.1 Use and application 6.2 Specifying AQLs 6.3 Preferred AQLs 7 Submission of product for sampling 7.1 Formation of lots 7.2 Presentation of lots 8 Acceptance and non-acceptance 8.1 Acceptability of lots 8.2 Disposition of non-acceptable lots 8.3 Nonconforming items 8.4 Classes of nonconformities or nonconforming items 8.5 Special reservation for critical classes of nonconformities 8.6 Resubmitted lots 9 Drawing of samples 9.1 Sample selection 9.2 Time for drawing the samples 10 Normal, tightened and reduced inspection 10.1 Start of inspection 10.2 Continuation of inspection 10.3 Switching rules and procedures (see Figure 1) 10.4 Discontinuation of inspection 11 Sampling plans 11.1 Inspection level 11.2 Sample size code letters 11.3 Obtaining a sampling plan 11.4 Operation of a sequential sampling plan 11.5 Numerical examples 12 Determination of acceptability 12.1 Inspection for nonconforming items 12.2 Inspection for nonconformities 13 Further information 13.1 Operating characteristic (OC) curves 13.2 Process average 13.3 Use of individual plans 14 Tables Annex A (normative) Sampling plans for normal inspection Annex B (normative) Sampling plans for tightened inspection Annex C (normative) Sampling plans for reduced inspection Annex D (informative) Average sample numbers for sequential sampling plans
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 2828.5-2011, GB 2828.5-2011, GBT 2828.5-2011, GB/T2828.5-2011, GB/T 2828.5, GB/T2828.5, GB2828.5-2011, GB 2828.5, GB2828.5, GBT2828.5-2011, GBT 2828.5, GBT2828.5