2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 29319-2012
GB/T 29319-2012   Technical requirements for connecting photovoltaic power system to distribution network (English Version)
Standard No.: GB/T 29319-2012 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 3000 words Translation Price(USD):184.0 remind me the price change

Email:

Implemented on:2013-6-1 Delivery: via email in 1 business day

→ → →

2024-03-15 ,2024-3-15,2013-6-1,5E668449E1749B701419384954060
Standard No.: GB/T 29319-2012
English Name: Technical requirements for connecting photovoltaic power system to distribution network
Chinese Name: 光伏发电系统接入配电网技术规定
Chinese Classification: F12    Solar energy
Professional Classification: GB    National Standard
Source Content Issued by: AQSIQ; SAC
Issued on: 2012-12-31
Implemented on: 2013-6-1
Status: superseded
Superseded by:GB/T 29319-2024 Technical requirements for connecting photovoltaic power system to distribution network
Superseded on:2024-3-15
Abolished on:2024-03-15
Superseding:GB/T 29319-2024 Technical requirements for connecting photovoltaic power system to distribution network
Target Language: English
File Format: PDF
Word Count: 3000 words
Translation Price(USD): 184.0
Delivery: via email in 1 business day
1 Scope This standard specifies the general principles and technical requirements to be observed for connecting photovoltaic power system to power network. This standard is applicable to newly-built, renovated and extended photovoltaic power systems connected to power network through 380V voltage class and connected to consumer side through 10(6)kV voltage class. 2 Normative References The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB 2894 Safety Signs and Guideline for the Use GB/T 12325 Power Quality - Deviation of Supply Voltage GB/T 12326 Power Quality - Voltage Fluctuation and Flicker GB/T 14549 Quality of Electric Energy Supply - Harmonics in Public Supply Network GB/T 15543 Power Quality - Three-phase Voltage Unbalance GB/T 16895.32 Electrical Installations of Buildings - Part 7-712: Requirements for Special Installations or Locations - Solar Photovoltaic (PV) Power Supply Systems GB/T 17215.322 Electricity Metering Equipment (a.c.) - Particular Requirements - Part 22: Static Meters for Active Energy (Classes 0.2S and 0.5S) GB/T 19862 General Requirements for Monitoring Equipment of Power Quality GB/T 24337 Power Quality - Interharmonics in Public Supply Network DL/T 448 Technical Administrative Code of Electric Energy Metering Unit DL/T 614 Multifunction Electricity Metering Equipment (A.C.) DL/T 645 Multi-function Watt-hour Meter Communication Protocol 3 Terms and Definitions For the purpose of this document, the following terms and definitions apply. 3.1 photovoltaic (PV) power system power generation system converting solar radiation energy to electric energy directly by utilizing the photovoltaic effect of photovoltaic cell 3.2 inverter equipment converting direct current into alternating current
Foreword i 1 Scope 2 Normative References 3 Terms and Definitions 4 Reactive Capability and Voltage Regulation 5 Start-up 6 Operation Adaptability 6.1 Voltage Range 6.2 Power Quality Range 6.3 Frequency Range 7 Power Quality 7.1 Basic Requirements 7.2 Voltage Deviation 7.3 Voltage Fluctuation and Flicker 7.4 Harmonic 7.5 Voltage Unbalance 7.6 DC Component 8 Safety and Protection 8.1 Basic Requirements 8.2 Low/high Voltage Protection 8.3 Frequency Protection 8.4 Anti-islanding Protection 8.5 Reverse Power Protection 8.6 Interconnection Recovery 9 General Technical Requirements 9.1 Grounding 9.2 Electromagnetic Compatibility 9.3 Voltage Withstand Requirement 9.4 Safety Signs 10 Electric Energy Metering 11 Communication and Signal 11.1 Basic Requirements 11.2 Normal Operation Signal 12 Interconnection Testing 12.1 Basic Requirements 12.2 Testing Content Annex A (Informative) Legends of Points of Interconnection
Referred in GB/T 29319-2012:
*GB 2894-2008 Safety Signs and Guideline for the Use
*GB/T 12325-2008 Power quality - Deviation of supply voltage
*GB/T 12326-2008 Power quality - Voltage fluctuation and flicker
*GB/T 14549-1993 Quality of Electric Energy Supply - Harmonics in Public Supply Network
*GB/T 15543-2008 Power quality—Three-phase voltage
*GB/T 16895.32-2008 Electrical installations of buildings - Part 7 - 712 : Requirements for special installations or locations - Solar photovoltaic (PV) power supply systems
*GB/T 17215.322-2008 Electricity metering equipment (a.c.) - Particular requirements - Part 22: Static meters for active energy (classes 0 2 S and 0 5 S)
*GB/T 19862-2016 General requirements for monitoring equipments of power quality
*GB/T 24337-2009 Power quality—Interharmonics in public supply network
*DL/T 448-2016
*DL/T 614-2007 Multifunction electricity meterring equipment (A.C.)
*DL/T 645-2007 Multi-function watt-hour meter communication protocol
GB/T 29319-2012 is referred in:
*GB/T 37408-2019 Technical requirements for photovoltaic gird-connected inverter
Code of China
Standard
GB/T 29319-2012  Technical requirements for connecting photovoltaic power system to distribution network (English Version)
Standard No.GB/T 29319-2012
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count3000 words
Price(USD)184.0
Implemented on2013-6-1
Deliveryvia email in 1 business day
Detail of GB/T 29319-2012
Standard No.
GB/T 29319-2012
English Name
Technical requirements for connecting photovoltaic power system to distribution network
Chinese Name
光伏发电系统接入配电网技术规定
Chinese Classification
F12
Professional Classification
GB
ICS Classification
Issued by
AQSIQ; SAC
Issued on
2012-12-31
Implemented on
2013-6-1
Status
superseded
Superseded by
GB/T 29319-2024 Technical requirements for connecting photovoltaic power system to distribution network
Superseded on
2024-3-15
Abolished on
2024-03-15
Superseding
GB/T 29319-2024 Technical requirements for connecting photovoltaic power system to distribution network
Language
English
File Format
PDF
Word Count
3000 words
Price(USD)
184.0
Keywords
GB/T 29319-2012, GB 29319-2012, GBT 29319-2012, GB/T29319-2012, GB/T 29319, GB/T29319, GB29319-2012, GB 29319, GB29319, GBT29319-2012, GBT 29319, GBT29319
Introduction of GB/T 29319-2012
1 Scope This standard specifies the general principles and technical requirements to be observed for connecting photovoltaic power system to power network. This standard is applicable to newly-built, renovated and extended photovoltaic power systems connected to power network through 380V voltage class and connected to consumer side through 10(6)kV voltage class. 2 Normative References The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB 2894 Safety Signs and Guideline for the Use GB/T 12325 Power Quality - Deviation of Supply Voltage GB/T 12326 Power Quality - Voltage Fluctuation and Flicker GB/T 14549 Quality of Electric Energy Supply - Harmonics in Public Supply Network GB/T 15543 Power Quality - Three-phase Voltage Unbalance GB/T 16895.32 Electrical Installations of Buildings - Part 7-712: Requirements for Special Installations or Locations - Solar Photovoltaic (PV) Power Supply Systems GB/T 17215.322 Electricity Metering Equipment (a.c.) - Particular Requirements - Part 22: Static Meters for Active Energy (Classes 0.2S and 0.5S) GB/T 19862 General Requirements for Monitoring Equipment of Power Quality GB/T 24337 Power Quality - Interharmonics in Public Supply Network DL/T 448 Technical Administrative Code of Electric Energy Metering Unit DL/T 614 Multifunction Electricity Metering Equipment (A.C.) DL/T 645 Multi-function Watt-hour Meter Communication Protocol 3 Terms and Definitions For the purpose of this document, the following terms and definitions apply. 3.1 photovoltaic (PV) power system power generation system converting solar radiation energy to electric energy directly by utilizing the photovoltaic effect of photovoltaic cell 3.2 inverter equipment converting direct current into alternating current
Contents of GB/T 29319-2012
Foreword i 1 Scope 2 Normative References 3 Terms and Definitions 4 Reactive Capability and Voltage Regulation 5 Start-up 6 Operation Adaptability 6.1 Voltage Range 6.2 Power Quality Range 6.3 Frequency Range 7 Power Quality 7.1 Basic Requirements 7.2 Voltage Deviation 7.3 Voltage Fluctuation and Flicker 7.4 Harmonic 7.5 Voltage Unbalance 7.6 DC Component 8 Safety and Protection 8.1 Basic Requirements 8.2 Low/high Voltage Protection 8.3 Frequency Protection 8.4 Anti-islanding Protection 8.5 Reverse Power Protection 8.6 Interconnection Recovery 9 General Technical Requirements 9.1 Grounding 9.2 Electromagnetic Compatibility 9.3 Voltage Withstand Requirement 9.4 Safety Signs 10 Electric Energy Metering 11 Communication and Signal 11.1 Basic Requirements 11.2 Normal Operation Signal 12 Interconnection Testing 12.1 Basic Requirements 12.2 Testing Content Annex A (Informative) Legends of Points of Interconnection
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 29319-2012, GB 29319-2012, GBT 29319-2012, GB/T29319-2012, GB/T 29319, GB/T29319, GB29319-2012, GB 29319, GB29319, GBT29319-2012, GBT 29319, GBT29319