2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 42316-2023
GB/T 42316-2023   Technical specification for centralized monitoring and control system of distributed energy storage (English Version)
Standard No.: GB/T 42316-2023 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 9500 words Translation Price(USD):285.0 remind me the price change

Email:

Implemented on:2023-10-1 Delivery: via email in 1~3 business day

→ → →

,,2023-10-1,1682409412733000e90b87744f96c530
Standard No.: GB/T 42316-2023
English Name: Technical specification for centralized monitoring and control system of distributed energy storage
Chinese Name: 分布式储能集中监控系统技术规范
Chinese Classification: F19    New energy and others
Professional Classification: GB    National Standard
Source Content Issued by: SAMR; SAC
Issued on: 2023-03-17
Implemented on: 2023-10-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 9500 words
Translation Price(USD): 285.0
Delivery: via email in 1~3 business day
Technical specification for centralized monitoring and control system of distributed energy storage 1 Scope This document specifies the system structure, normal working conditions, functional requirements, performance requirements as well as test and detection of the centralized monitoring and control system of distributed energy storage. This document is applicable to the design, manufacture, test, operation, maintenance and overhaul of the centralized monitoring and control system of distributed energy storage. 2 Normative references The following documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) applies. GB/T 13729 Remote terminal unit equipment GB/T 36572 Guidelines of cyber security protection for electric power system supervision and control GB 50229 Standard for design of fire protection for fossil fuel power plants and substations DL/T 634.5101 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 101: Companion standard for basic telecontrol tasks DL/T 634.5104 Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard transport profiles DL/T 860 (All parts) Communication networks and system for power utility automation DL/T 2528 Fundamental vocabulary for electrical energy storage DL/T 5149 Code for design of substation monitoring and control system 3 Terms and definitions For the purposes of this document, the terms and definitions given in DL/T 2528 and the following apply. 3.1 centralized monitoring and control system of distributed energy storage system for centralized real-time monitoring and control of one or more distributed energy storage based on the application of computer, network and communication technology 4 General 4.1 The centralized monitoring and control system of distributed energy storage shall have the application functions of data acquisition, real-time communication, operation monitoring and operating control. 4.2 The centralized monitoring and control system of distributed energy storage shall adopt layered, hierarchical, open system structure with scalability.
Foreword…………………………………………………………………………………………… 1 Scope………………………………………………………………………………………… 2 Normative references……………………………………………………………………… 3 Terms and definitions………………………………………………………………………… 4 General requirements……………………………………………………………………… 5 System structure……………………………………………………………………………… 6 Normal working conditions…………………………………………………………………… 7 Function requirements……………………………………………………………………… 8 Performance requirements………………………………………………………………… 9 Test and detection…………………………………………………………………………… Annex A (Informative) Typical structure of centralized monitoring and control system of distributed energy storage……………………………………………………………………… Annex B (Informative) Information collection contents of centralized monitoring and control system of distributed energy storage…………………………………………………… Annex C (Informative) Typical structure of test system of centralized monitoring and control system of distributed energy storage……………………………………………………
Referred in GB/T 42316-2023:
*GB/T 13729-2019 Remote terminal unit equipment
*GB/T 36572-2018 Guidelines of cyber security protection for electric power system supervision and control
*GB 50229-2019 Standard for design of fire protection for fossil fuel power plants and substations
*DL/T 634.5101-2022 Telecontrol equipment and systems 一 Part 5-101:Transmission protocols-companion standard for basic telecontrol tasks
*DL/T 634.5104-2009 Telecontrol equipment and systems Part 5-104: Transmission protocols - network access for IEC 60870-5-101 using standard transport profiles
*DLT860-
*DL/T 2528-2022 Basic terminology of electrical energy storage
*DL/T 5149-2020 Code for design of substation monitoring and control system
Code of China
Standard
GB/T 42316-2023  Technical specification for centralized monitoring and control system of distributed energy storage (English Version)
Standard No.GB/T 42316-2023
Statusvalid
LanguageEnglish
File FormatPDF
Word Count9500 words
Price(USD)285.0
Implemented on2023-10-1
Deliveryvia email in 1~3 business day
Detail of GB/T 42316-2023
Standard No.
GB/T 42316-2023
English Name
Technical specification for centralized monitoring and control system of distributed energy storage
Chinese Name
分布式储能集中监控系统技术规范
Chinese Classification
F19
Professional Classification
GB
ICS Classification
Issued by
SAMR; SAC
Issued on
2023-03-17
Implemented on
2023-10-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
9500 words
Price(USD)
285.0
Keywords
GB/T 42316-2023, GB 42316-2023, GBT 42316-2023, GB/T42316-2023, GB/T 42316, GB/T42316, GB42316-2023, GB 42316, GB42316, GBT42316-2023, GBT 42316, GBT42316
Introduction of GB/T 42316-2023
Technical specification for centralized monitoring and control system of distributed energy storage 1 Scope This document specifies the system structure, normal working conditions, functional requirements, performance requirements as well as test and detection of the centralized monitoring and control system of distributed energy storage. This document is applicable to the design, manufacture, test, operation, maintenance and overhaul of the centralized monitoring and control system of distributed energy storage. 2 Normative references The following documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) applies. GB/T 13729 Remote terminal unit equipment GB/T 36572 Guidelines of cyber security protection for electric power system supervision and control GB 50229 Standard for design of fire protection for fossil fuel power plants and substations DL/T 634.5101 Telecontrol equipment and systems - Part 5: Transmission protocols - Section 101: Companion standard for basic telecontrol tasks DL/T 634.5104 Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standard transport profiles DL/T 860 (All parts) Communication networks and system for power utility automation DL/T 2528 Fundamental vocabulary for electrical energy storage DL/T 5149 Code for design of substation monitoring and control system 3 Terms and definitions For the purposes of this document, the terms and definitions given in DL/T 2528 and the following apply. 3.1 centralized monitoring and control system of distributed energy storage system for centralized real-time monitoring and control of one or more distributed energy storage based on the application of computer, network and communication technology 4 General 4.1 The centralized monitoring and control system of distributed energy storage shall have the application functions of data acquisition, real-time communication, operation monitoring and operating control. 4.2 The centralized monitoring and control system of distributed energy storage shall adopt layered, hierarchical, open system structure with scalability.
Contents of GB/T 42316-2023
Foreword…………………………………………………………………………………………… 1 Scope………………………………………………………………………………………… 2 Normative references……………………………………………………………………… 3 Terms and definitions………………………………………………………………………… 4 General requirements……………………………………………………………………… 5 System structure……………………………………………………………………………… 6 Normal working conditions…………………………………………………………………… 7 Function requirements……………………………………………………………………… 8 Performance requirements………………………………………………………………… 9 Test and detection…………………………………………………………………………… Annex A (Informative) Typical structure of centralized monitoring and control system of distributed energy storage……………………………………………………………………… Annex B (Informative) Information collection contents of centralized monitoring and control system of distributed energy storage…………………………………………………… Annex C (Informative) Typical structure of test system of centralized monitoring and control system of distributed energy storage……………………………………………………
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 42316-2023, GB 42316-2023, GBT 42316-2023, GB/T42316-2023, GB/T 42316, GB/T42316, GB42316-2023, GB 42316, GB42316, GBT42316-2023, GBT 42316, GBT42316