2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 50064-2014
GB/T 50064-2014   Code for design of overvoltage protection and insulation coordination for AC electrcal installations (English Version)
Standard No.: GB/T 50064-2014 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 20000 words Translation Price(USD):500.0 remind me the price change

Email:

Implemented on:2014-12-1 Delivery: via email in 1 business day

→ → →

,,2014-12-1,D6A8FECD55D7EF321418880759360
Standard No.: GB/T 50064-2014
English Name: Code for design of overvoltage protection and insulation coordination for AC electrcal installations
Chinese Name: 交流电气装置的过电压保护和绝缘配合设计规范
Professional Classification: GB    National Standard
Source Content Issued by: MOHURD
Issued on: 2014-03-31
Implemented on: 2014-12-1
Status: valid
Superseding:GBJ 64-1983 Specifications for the design of surge protection of industrial and civil electric system
Target Language: English
File Format: PDF
Word Count: 20000 words
Translation Price(USD): 500.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated with a view to ensuring safe, reliable, technology-advanced, economical and reasonable overvoltage protection and insulation coordination design for AC electrical installations. 1.0.2 This code is applicable to the design of overvoltage protection and insulation coordination for power generation, transmission, transformation and distribution electrical installations and rotating electrical machines in AC power system with nominal voltage of 6kV~750kV. 1.0.3 Differentiated design shall be conducted for the overvoltage protection and insulation coordination for AC electrical installations through calculation, analysis and technical and economical comparison by combining the power network structure, lightning characteristics in the region, ground flash density and operating experience. 1.0.4 The design of overvoltage protection and insulation coordination for AC electrical installations shall not only comply with the requirements specified in this code, but also meet those specified in the current relevant standards of the nation. 2 Terminologies 2.0.1 High-resistance neutral grounding method At least one conductor or one point of the system is grounded through high-resistance. The system equivalent zero-sequence resistance is not greater than single-phase capacitive reactance of system distributed to the ground and the system grounding fault current is less than 10A. 2.0.2 Low-resistance neutral grounding method At least one conductor or one point of the system is grounded through low-resistance. The system equivalent zero-sequence resistance is not less than 2 times system equivalent zero-sequence inductive reactance. 2.0.3 Resonant neutral grounding method At least one conductor or one point of the system is grounded through inductance to compensate the capacitive component of the single-phase fault current of system to ground. 2.0.4 Very fast transient overvoltage (VFTO) The high-frequency oscillation overvoltage with frequency up to hundreds of thousands of hertz to several megahertz generated by the disconnecting switch of gas-insulated metal-enclosed switchgear (GIS) and HGIS (namely Hybrid-GIS) under certain operation mode is referred to as very fast transient overvoltage. 2.0.5 Ground flash density (GFD) The annual lightning times on ground per square kilometer. 2.0.6 Less thunderstorm region The region where the average annual thunderstorm days do not exceed 15d or the ground flash density does not exceed 0.78 times /(km2·a). 2.0.7 Middle thunderstorm region The region where the average annual thunderstorm days are between 15d~40d or the ground flash density is between 0.78 times /(km2·a)~2.78 times/(km2·a). 2.0.8 More thunderstorm region The region where the average annual thunderstorm days are between 40d~90d or the ground flash density is between 2.78 times /(km2·a)~7.98 times/(km2·a). 2.0.9 Strong thunderstorm region The region where the average annual thunderstorm days exceed 90d or the ground flash density exceeds 7.98 times/(km2·a) and regions with particular serious thunderstorm damage according to the operating experience. 2.0.10 Shielding angle The shielding angle of ground wire to conductor refers to the included angle of the perpendicular line of ground wire to the horizontal plane at the pole tower position (irrespective of wind deflection) and the connecting line between the ground wire and the conductor of the sub-conductor at the outermost side of bundled conductor.
Contents 1 General Provisions 2 Terminologies 3 System Neutral Grounding Method and Voltage on Insulation of Electrical Installations 3.1 System Neutral Grounding Method 3.2 Voltage on Insulation of Electrical Installations 4 Temporary Overvoltage, Switching Overvoltage and Mitigation 4.1 Temporary Overvoltage and Mitigation 4.2 Switching Overvoltage and Mitigation 4.3 VFTO and Mitigation 4.4 Basic Requirements of MOA to Suppress Switching Overvoltage 5 Lightning Overvoltage and Protection 5.1 General Requirements 5.2 Protection Scope of Lightning Rods and Shield Wires 5.3 Lightning Overvoltage Protection of High-voltage Overhead Transmission Lines 5.4 Lightning Overvoltage Protection of Power Plants and Substations 5.5 Lightning Overvoltage Protection of Power Distribution Systems 5.6 Lightning Overvoltage Protection of Rotating Electrical Machine 6 Insulation Coordination 6.1 Principles of Insulation Coordination 6.2 Insulation Coordination of Overhead Transmission Lines 6.3 Insulation Coordination of Insulator String and Air Clearance in Substations 6.4 Insulation Coordination of Electrical Equipment in Substations Appendix A Altitude Correction of Discharge Voltage for External Insulation Appendix B Uneven Factor of Wind Speed for Calculation on Angle of Wind Deflection of Suspension Insulator String on Overhead Lines Appendix C Calculation Methods of Insulation Flashover Rate of Line Under Switching Overvoltage Appendix D Analysis and Calculation Methods of Lightning Performance of Overhead Lines and Substations Appendix E Requirements on Duration of Temporary Overvoltage for Electrical Equipment Appendix F Discharge Voltage Data for Air Clearance of Ultra-high Voltage Overhead Lines and Substations Explanation of Wording in This Code List of Quoted Standards
Referred in GB/T 50064-2014:
*GB 311.1-2012 Insulation co-ordination - Part 1:Definitions, principles and rules
GB/T 50064-2014 is referred in:
*SH/T 3038-2017 Code for Electric Power Design in Petrochemical Plants
*GB 50265-2022 Standard for pumping station design
*GB/T 42288-2022 Safety code of electrochemical energy storage station
*GB/T 43462-2023 Technical guide for black-start of electrochemical energy storage
*GB/T 45418-2025 General technical directives for distribution networks
Code of China
Standard
GB/T 50064-2014  Code for design of overvoltage protection and insulation coordination for AC electrcal installations (English Version)
Standard No.GB/T 50064-2014
Statusvalid
LanguageEnglish
File FormatPDF
Word Count20000 words
Price(USD)500.0
Implemented on2014-12-1
Deliveryvia email in 1 business day
Detail of GB/T 50064-2014
Standard No.
GB/T 50064-2014
English Name
Code for design of overvoltage protection and insulation coordination for AC electrcal installations
Chinese Name
交流电气装置的过电压保护和绝缘配合设计规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2014-03-31
Implemented on
2014-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GBJ 64-1983 Specifications for the design of surge protection of industrial and civil electric system
Language
English
File Format
PDF
Word Count
20000 words
Price(USD)
500.0
Keywords
GB/T 50064-2014, GB 50064-2014, GBT 50064-2014, GB/T50064-2014, GB/T 50064, GB/T50064, GB50064-2014, GB 50064, GB50064, GBT50064-2014, GBT 50064, GBT50064
Introduction of GB/T 50064-2014
1 General Provisions 1.0.1 This code is formulated with a view to ensuring safe, reliable, technology-advanced, economical and reasonable overvoltage protection and insulation coordination design for AC electrical installations. 1.0.2 This code is applicable to the design of overvoltage protection and insulation coordination for power generation, transmission, transformation and distribution electrical installations and rotating electrical machines in AC power system with nominal voltage of 6kV~750kV. 1.0.3 Differentiated design shall be conducted for the overvoltage protection and insulation coordination for AC electrical installations through calculation, analysis and technical and economical comparison by combining the power network structure, lightning characteristics in the region, ground flash density and operating experience. 1.0.4 The design of overvoltage protection and insulation coordination for AC electrical installations shall not only comply with the requirements specified in this code, but also meet those specified in the current relevant standards of the nation. 2 Terminologies 2.0.1 High-resistance neutral grounding method At least one conductor or one point of the system is grounded through high-resistance. The system equivalent zero-sequence resistance is not greater than single-phase capacitive reactance of system distributed to the ground and the system grounding fault current is less than 10A. 2.0.2 Low-resistance neutral grounding method At least one conductor or one point of the system is grounded through low-resistance. The system equivalent zero-sequence resistance is not less than 2 times system equivalent zero-sequence inductive reactance. 2.0.3 Resonant neutral grounding method At least one conductor or one point of the system is grounded through inductance to compensate the capacitive component of the single-phase fault current of system to ground. 2.0.4 Very fast transient overvoltage (VFTO) The high-frequency oscillation overvoltage with frequency up to hundreds of thousands of hertz to several megahertz generated by the disconnecting switch of gas-insulated metal-enclosed switchgear (GIS) and HGIS (namely Hybrid-GIS) under certain operation mode is referred to as very fast transient overvoltage. 2.0.5 Ground flash density (GFD) The annual lightning times on ground per square kilometer. 2.0.6 Less thunderstorm region The region where the average annual thunderstorm days do not exceed 15d or the ground flash density does not exceed 0.78 times /(km2·a). 2.0.7 Middle thunderstorm region The region where the average annual thunderstorm days are between 15d~40d or the ground flash density is between 0.78 times /(km2·a)~2.78 times/(km2·a). 2.0.8 More thunderstorm region The region where the average annual thunderstorm days are between 40d~90d or the ground flash density is between 2.78 times /(km2·a)~7.98 times/(km2·a). 2.0.9 Strong thunderstorm region The region where the average annual thunderstorm days exceed 90d or the ground flash density exceeds 7.98 times/(km2·a) and regions with particular serious thunderstorm damage according to the operating experience. 2.0.10 Shielding angle The shielding angle of ground wire to conductor refers to the included angle of the perpendicular line of ground wire to the horizontal plane at the pole tower position (irrespective of wind deflection) and the connecting line between the ground wire and the conductor of the sub-conductor at the outermost side of bundled conductor.
Contents of GB/T 50064-2014
Contents 1 General Provisions 2 Terminologies 3 System Neutral Grounding Method and Voltage on Insulation of Electrical Installations 3.1 System Neutral Grounding Method 3.2 Voltage on Insulation of Electrical Installations 4 Temporary Overvoltage, Switching Overvoltage and Mitigation 4.1 Temporary Overvoltage and Mitigation 4.2 Switching Overvoltage and Mitigation 4.3 VFTO and Mitigation 4.4 Basic Requirements of MOA to Suppress Switching Overvoltage 5 Lightning Overvoltage and Protection 5.1 General Requirements 5.2 Protection Scope of Lightning Rods and Shield Wires 5.3 Lightning Overvoltage Protection of High-voltage Overhead Transmission Lines 5.4 Lightning Overvoltage Protection of Power Plants and Substations 5.5 Lightning Overvoltage Protection of Power Distribution Systems 5.6 Lightning Overvoltage Protection of Rotating Electrical Machine 6 Insulation Coordination 6.1 Principles of Insulation Coordination 6.2 Insulation Coordination of Overhead Transmission Lines 6.3 Insulation Coordination of Insulator String and Air Clearance in Substations 6.4 Insulation Coordination of Electrical Equipment in Substations Appendix A Altitude Correction of Discharge Voltage for External Insulation Appendix B Uneven Factor of Wind Speed for Calculation on Angle of Wind Deflection of Suspension Insulator String on Overhead Lines Appendix C Calculation Methods of Insulation Flashover Rate of Line Under Switching Overvoltage Appendix D Analysis and Calculation Methods of Lightning Performance of Overhead Lines and Substations Appendix E Requirements on Duration of Temporary Overvoltage for Electrical Equipment Appendix F Discharge Voltage Data for Air Clearance of Ultra-high Voltage Overhead Lines and Substations Explanation of Wording in This Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 50064-2014, GB 50064-2014, GBT 50064-2014, GB/T50064-2014, GB/T 50064, GB/T50064, GB50064-2014, GB 50064, GB50064, GBT50064-2014, GBT 50064, GBT50064