1 General provisions
1.0.1 This standard is formulated to ensure the construction quality of the urban rail transit AutomaticFare Collection system,strengthen the implementation management and unify the acceptance standards.
1.0.2 This standard is applicable to the acceptance of the construction quality for new construction,extension and renovation of the urban rail transit Automatic Fare Collection system.
1.0.3 The information security of the urban rail transit Automatic Fare Coflection system shall complywith the national regulations.
1.0.4 The acceptance of the construction quality of the urban rail transif Automatic Fare Collectionsystem shall comply with not only this standard, but also the requirements stipulated in other currentrelevant national standards.
2 Terms
2.0.1 Automatic Fare Collection(AFC)system
A comprehensive automation system for vending,checking,billing,charging,statistics,clearing,and other management operations of urban rail transit based on computer, communication,network,automatic control and other technologies,and is called AFC system for short.
2.0.2 Station Terminal Equipment
Equipment installed at each station of the urban rail transit line for ticket transaction processingsuch as vending,Entry checking,Exit checking,recharging and analyzing.
2.0.3 Automatic Gate Machine
Equipment used for checking and processing tickets, and releasing passengers or preventingpassengers from entering or exiting the Paid Area.
2.0.4 Blacklist
A data list for special control of reported lost tickets or abnormal tickets according to managementrequirements.
2.0.5 Automatic Ticket Vending Machine
Equipment used for automatically vending and assigning value to valid tickets with automaticpayment and change processing functions.
2.0.6 Booking Office Machine
Equipment used for vending/and assigning value to valid tickets with manual assistance,andproviding ticket processing functions such as compensating, refunding,inquiring and updating tickets.
2.0.7 Automatic Value-adding Machine
Equipment used fof automatically recharging Stored Value Tickets and checking transaction andbalance information,etc.
2.0.8 Ticket Checking Machine
Equipment used for inquiring ticket information which includes Automatic Ticket CheckingMachine and Portable Ticket Checking Machine,etc.
2.0.9 Station Computer System
A computer system used for station level ticket processing, operation management and passengerflow statistics.
2.0.10 Central Computer System
A computer system used to monitor and manage the Automatic Fare Collection system of singleline or multiple lines in the urban rail transit.
2.0.11 Central Clearing System
A system used to issue and manage urban rail transit tickets,settle and clear tickets and accounts ofdifferent lines within the urban rail transit network,with the function of clearing with other paymentcards used in the urban rail transit network.
"Booking Office Machine is a semi-automatic ticket vending machine, which is usually intalled at booking office, and it is called BookingOffice Machine as a custom.
2.0.12 Security Key
Specific secret parameters used when encrypting or decrypting data.
2.0.13 Security Access Module(SAM)
A hardware encryption module that provides the necessary security mechanism to prevent illegalattacks on secure data stored or processed by a terminal,and is called SAM for short.
2.0.14 Initialization
A process to write the initial format,issuance and application information on the ticket to ensure thenormal use in the system before putting it into operation.
2.0.15 Encode Sorter
Equipment used for initializing coding,and batch sorting of tickets.
2.0.16 Entry
Act of passing from the Unpaid Area to the Paid Area.
2.0.17 Exit
Act of passing from the Paid Area to the Unpaid Area.
2.0.18 Single Journey Ticket
A one-time-use ticket within a limited time.
2.0.19 Stored Value Ticket
Ticket with value storage function which can be recharged repeatedly.
2.0.20 Ticket Reader-Writer
Equipment installed in Automatic Ticker Vending Machine,Booking Office Machine,AutomaticGate Machine,Automatic Value-adding Machine,Automatic Ticket Checking Machine and PortableTicket Checking Machine used for reading and writing of tickefs for vending,checking,recharging andverifying analysis.
3 Basic requirements
3.0.1 The urban rail transit Automatic Fare Collection system(AFC system) shall establishconstruction technical standards,quality management system, construction quality inspection system,and construction quality level evaluation and assessment system for quality management at theconstruction site.
3.0.2 The division of AFC system project into sub-project, component and inspection lot, and theinspection items of AFC system project shall meet the requirements of Appendix A of this standard.
3.0.3 The construction site of AFC system shall conduct quality management inspections,and it shallbe inspected and recorded in accordance with the requirements of the construction site qualitymanagement inspection in Table B.0.1 in Appendix B of this standard.
3.0.4 The construction quality acceptance of AFC system shall include the quality control, systemtesting and construction acceptance of project implementation.
3.0.5 The appearance, specifications and models of the materials, construction accessories andequipment used in AFC system project shall comply with the design requirements, and shall possessqualified quality certificate documents.
3.0.6 The AFC system project shall be an independent projeet, which shall be classified into sub-project,component and inspection lot.
3.0.7 The construction quality acceptance procedure and organization of AFC system,as well as thequality acceptance of inspection fot, component, sub-project and AFC system project shall meet therequirements of the current national standard GB 50300 Unified Standard for Constructional QualityAcceptance of BuildingEngineering.
3.0.8 The construefion quality acceptance of AFC system shall include quality control data verification,entity quality and main function verification,and Quality of External Appearance' inspection of project,and the following acceptance records shall be filled in:
1 The quality acceptance of inspection lot shall be carried out and recorded in accordance with therequirements of inspection lot quality acceptance in Table B.0.2 in Appendix B of this standard.2 The quality acceptance of component shall be carried out and recorded in accordance with therequirements of component quality acceptance in Table B.0.3 in Appendix B of this standard.
3 The quality acceptance of sub-project shall be carried out and recorded in accordance with therequirements of sub-project quality acceptance in Table B.0.4 in Appendix B of this standard.
4 The quality acceptance of project shall carry out sampling inspection on the quality controlrecords, safety and main use functions,and Quality of External Appearance of the sub-project, and itshall be carried out and recorded in accordance with the requirements of project quality acceptance in
Table C.0.1 in Appendix C of this standard.
5 The acceptance of project quality control data verification shall be carried out and recorded inaccordance with the requirements in Table C.0.2 in Appendix C of this standard.
Quality of Extemal Appearance means extemal quality and functional status of the project which is reflected by observing and necessarytesting.
6 The safety and function inspection data verification as well as the spot-check acceptance ofmain functions for project shall be carried out and recorded in accordance with the requirements in Table
C.0.3 in Appendix C of this standard.
3.0.9 During the construction quality acceptance of AFC system,the AFC system project that doesnot comply with the requirements in this standard, and the sub-project or project that cannot meet therequirements for safety use even after rework or reinforcement measures,shall not be accepted.
3.0.10 The application and administration of cryptography of the AFC system shall comply with thenational cryptography management regulations.
Standard
GB/T 50381-2018 Standard for construction quality acre}tanre of urban rail transit automatic fare collection system engineering (English Version)
Standard No.
GB/T 50381-2018
Status
valid
Language
English
File Format
PDF
Word Count
35000 words
Price(USD)
1050.0
Implemented on
2018-12-1
Delivery
via email in 1~2 business day
Detail of GB/T 50381-2018
Standard No.
GB/T 50381-2018
English Name
Standard for construction quality acre}tanre of urban rail transit automatic fare collection system engineering
1 General provisions
1.0.1 This standard is formulated to ensure the construction quality of the urban rail transit AutomaticFare Collection system,strengthen the implementation management and unify the acceptance standards.
1.0.2 This standard is applicable to the acceptance of the construction quality for new construction,extension and renovation of the urban rail transit Automatic Fare Collection system.
1.0.3 The information security of the urban rail transit Automatic Fare Coflection system shall complywith the national regulations.
1.0.4 The acceptance of the construction quality of the urban rail transif Automatic Fare Collectionsystem shall comply with not only this standard, but also the requirements stipulated in other currentrelevant national standards.
2 Terms
2.0.1 Automatic Fare Collection(AFC)system
A comprehensive automation system for vending,checking,billing,charging,statistics,clearing,and other management operations of urban rail transit based on computer, communication,network,automatic control and other technologies,and is called AFC system for short.
2.0.2 Station Terminal Equipment
Equipment installed at each station of the urban rail transit line for ticket transaction processingsuch as vending,Entry checking,Exit checking,recharging and analyzing.
2.0.3 Automatic Gate Machine
Equipment used for checking and processing tickets, and releasing passengers or preventingpassengers from entering or exiting the Paid Area.
2.0.4 Blacklist
A data list for special control of reported lost tickets or abnormal tickets according to managementrequirements.
2.0.5 Automatic Ticket Vending Machine
Equipment used for automatically vending and assigning value to valid tickets with automaticpayment and change processing functions.
2.0.6 Booking Office Machine
Equipment used for vending/and assigning value to valid tickets with manual assistance,andproviding ticket processing functions such as compensating, refunding,inquiring and updating tickets.
2.0.7 Automatic Value-adding Machine
Equipment used fof automatically recharging Stored Value Tickets and checking transaction andbalance information,etc.
2.0.8 Ticket Checking Machine
Equipment used for inquiring ticket information which includes Automatic Ticket CheckingMachine and Portable Ticket Checking Machine,etc.
2.0.9 Station Computer System
A computer system used for station level ticket processing, operation management and passengerflow statistics.
2.0.10 Central Computer System
A computer system used to monitor and manage the Automatic Fare Collection system of singleline or multiple lines in the urban rail transit.
2.0.11 Central Clearing System
A system used to issue and manage urban rail transit tickets,settle and clear tickets and accounts ofdifferent lines within the urban rail transit network,with the function of clearing with other paymentcards used in the urban rail transit network.
"Booking Office Machine is a semi-automatic ticket vending machine, which is usually intalled at booking office, and it is called BookingOffice Machine as a custom.
2.0.12 Security Key
Specific secret parameters used when encrypting or decrypting data.
2.0.13 Security Access Module(SAM)
A hardware encryption module that provides the necessary security mechanism to prevent illegalattacks on secure data stored or processed by a terminal,and is called SAM for short.
2.0.14 Initialization
A process to write the initial format,issuance and application information on the ticket to ensure thenormal use in the system before putting it into operation.
2.0.15 Encode Sorter
Equipment used for initializing coding,and batch sorting of tickets.
2.0.16 Entry
Act of passing from the Unpaid Area to the Paid Area.
2.0.17 Exit
Act of passing from the Paid Area to the Unpaid Area.
2.0.18 Single Journey Ticket
A one-time-use ticket within a limited time.
2.0.19 Stored Value Ticket
Ticket with value storage function which can be recharged repeatedly.
2.0.20 Ticket Reader-Writer
Equipment installed in Automatic Ticker Vending Machine,Booking Office Machine,AutomaticGate Machine,Automatic Value-adding Machine,Automatic Ticket Checking Machine and PortableTicket Checking Machine used for reading and writing of tickefs for vending,checking,recharging andverifying analysis.
3 Basic requirements
3.0.1 The urban rail transit Automatic Fare Collection system(AFC system) shall establishconstruction technical standards,quality management system, construction quality inspection system,and construction quality level evaluation and assessment system for quality management at theconstruction site.
3.0.2 The division of AFC system project into sub-project, component and inspection lot, and theinspection items of AFC system project shall meet the requirements of Appendix A of this standard.
3.0.3 The construction site of AFC system shall conduct quality management inspections,and it shallbe inspected and recorded in accordance with the requirements of the construction site qualitymanagement inspection in Table B.0.1 in Appendix B of this standard.
3.0.4 The construction quality acceptance of AFC system shall include the quality control, systemtesting and construction acceptance of project implementation.
3.0.5 The appearance, specifications and models of the materials, construction accessories andequipment used in AFC system project shall comply with the design requirements, and shall possessqualified quality certificate documents.
3.0.6 The AFC system project shall be an independent projeet, which shall be classified into sub-project,component and inspection lot.
3.0.7 The construction quality acceptance procedure and organization of AFC system,as well as thequality acceptance of inspection fot, component, sub-project and AFC system project shall meet therequirements of the current national standard GB 50300 Unified Standard for Constructional QualityAcceptance of BuildingEngineering.
3.0.8 The construefion quality acceptance of AFC system shall include quality control data verification,entity quality and main function verification,and Quality of External Appearance' inspection of project,and the following acceptance records shall be filled in:
1 The quality acceptance of inspection lot shall be carried out and recorded in accordance with therequirements of inspection lot quality acceptance in Table B.0.2 in Appendix B of this standard.2 The quality acceptance of component shall be carried out and recorded in accordance with therequirements of component quality acceptance in Table B.0.3 in Appendix B of this standard.
3 The quality acceptance of sub-project shall be carried out and recorded in accordance with therequirements of sub-project quality acceptance in Table B.0.4 in Appendix B of this standard.
4 The quality acceptance of project shall carry out sampling inspection on the quality controlrecords, safety and main use functions,and Quality of External Appearance of the sub-project, and itshall be carried out and recorded in accordance with the requirements of project quality acceptance in
Table C.0.1 in Appendix C of this standard.
5 The acceptance of project quality control data verification shall be carried out and recorded inaccordance with the requirements in Table C.0.2 in Appendix C of this standard.
Quality of Extemal Appearance means extemal quality and functional status of the project which is reflected by observing and necessarytesting.
6 The safety and function inspection data verification as well as the spot-check acceptance ofmain functions for project shall be carried out and recorded in accordance with the requirements in Table
C.0.3 in Appendix C of this standard.
3.0.9 During the construction quality acceptance of AFC system,the AFC system project that doesnot comply with the requirements in this standard, and the sub-project or project that cannot meet therequirements for safety use even after rework or reinforcement measures,shall not be accepted.
3.0.10 The application and administration of cryptography of the AFC system shall comply with thenational cryptography management regulations.