2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/HDJZ 1998
HDJZ 1998   Guideline on Steam Pipe Blowing Startup by Thermal Power Unit (English Version)
Standard No.: HDJZ 1998 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 4000 words Translation Price(USD):80.0 remind me the price change

Email:

Implemented on:1998-1-1 Delivery: via email in 1 business day

→ → →

,,1998-1-1,142902528014800040cd6bedb1de1535
Standard No.: HDJZ 1998
English Name: Guideline on Steam Pipe Blowing Startup by Thermal Power Unit
Chinese Name: 火电机组启动蒸汽吹管导则
Professional Classification: HD    
Implemented on: 1998-1-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 4000 words
Translation Price(USD): 80.0
Delivery: via email in 1 business day
1.1 Purpose of Pipe Blowing The blowing for the superheater, the reheater and the steam pipeline system of the boiler is an important procedure prior to the operation of the newly-built unit, for the purpose of clearing various sundries (e.g. sand grain, stone block, scraps and iron scale etc.) left in the superheater, the reheater and the steam pipeline during manufacture, transport, preservation and installation, preventing pipe bursting of the superheater and the reheater and damage on the turbine flow passage part during unit operation, raising the safety and economical efficiency of the unit and improving the steam quality during operation. It shall be stressed that pipe blowing may not eliminate all sundries and only serves as the last supplemental procedure, and accumulated sundries shall be first eliminated during manufacture and installation. 1.2 Main scope of pipe blowing 1.2.1 The superheater, the reheater and the system of the boiler. 1.2.2 Main steam pipe, the cold section pipe and hot section pipe of the reheat steam. 1.2.3 The high-pressure bypass system. 1.2.4 The steam source pipeline of the steam feed pump. 2 Quality Criterion and Parameter Selection of Pipe Blowing 2.1 Quality Criterion of Pipe Blowing 2.1.1 As required by 10.5.8 in "The Code of Erection and Acceptance of Electric Power Construction" (Section of Steam Boiler Set) (hereinafter referred to as Boiler Section): the pipe blowing coefficients of the superheater, the reheater and each section of the boiler shall be greater than 1; the target plate made with aluminium sheet shall be installed in the temporary steam exhaust pipe (or at the steam exhaust port) at the end of the blown pipe, with the width about 8% of the inside diameter of the steam exhaust pipe and the length straightly through the internal pipe size; on the premise of ensuring the pipe blowing coefficient, the target plate shall be replaced for successive two times for inspection, and blowing qualification shall be identified if the blackspot generated due to impact on the target plate is not greater than 0.8mm and the macroscopic blackspot is not more than 8 points. 2.1.2 While the two-section method is adopted for blowing, the reheater and its pipeline shall be blown and the blowing for them shall be qualified through inspection after the blowing for main steam pipeline is qualified. While the one-section method is adopted for blowing, the blowing qualities for the main steam pipeline and the reheat steam pipeline shall be separately inspected until to meet the criterion requirements.
Contents 1 Purpose and Scope of Pipe Blowing 2 Quality Criterion and Parameter Selection of Pipe Blowing 3 Pipe Blowing Modes and Methods 4 Installation of and Technical Requirements for Temporary Facilities 5 Key Implementation Points on Pipe Blowing Technology 6 Safety and Cautions for Blowing Operation Appendix A Application of Differential Pressure Method in Pipe Blowing Technology Appendix B Typical Structure of the Granula Collector Appendix C Counterforce Calculation of the Steam Exhaust Pipe while Pipe Blowing Appendix D Structure of Tandem-shaft Target Plate Device
Referred in HDJZ 1998:
* DL/T 5047-1995
* DL 5031-1994 The code of erection and acceptance for electirc power construction piping section
* SDJJS 03-1988
* DL/T 561-1995 Guide for Chemical Supervision of Water and Steam in Thermal Power Plants
Code of China
Standard
HDJZ 1998  Guideline on Steam Pipe Blowing Startup by Thermal Power Unit (English Version)
Standard No.HDJZ 1998
Statusvalid
LanguageEnglish
File FormatPDF
Word Count4000 words
Price(USD)80.0
Implemented on1998-1-1
Deliveryvia email in 1 business day
Detail of HDJZ 1998
Standard No.
HDJZ 1998
English Name
Guideline on Steam Pipe Blowing Startup by Thermal Power Unit
Chinese Name
火电机组启动蒸汽吹管导则
Chinese Classification
Professional Classification
HD
ICS Classification
Issued by
Issued on
Implemented on
1998-1-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
4000 words
Price(USD)
80.0
Keywords
HDJZ 1998, HDJZ/T 1998, HDJZT 1998, HDJZ1998, HDJZ/T1998, HDJZT1998,
Introduction of HDJZ 1998
1.1 Purpose of Pipe Blowing The blowing for the superheater, the reheater and the steam pipeline system of the boiler is an important procedure prior to the operation of the newly-built unit, for the purpose of clearing various sundries (e.g. sand grain, stone block, scraps and iron scale etc.) left in the superheater, the reheater and the steam pipeline during manufacture, transport, preservation and installation, preventing pipe bursting of the superheater and the reheater and damage on the turbine flow passage part during unit operation, raising the safety and economical efficiency of the unit and improving the steam quality during operation. It shall be stressed that pipe blowing may not eliminate all sundries and only serves as the last supplemental procedure, and accumulated sundries shall be first eliminated during manufacture and installation. 1.2 Main scope of pipe blowing 1.2.1 The superheater, the reheater and the system of the boiler. 1.2.2 Main steam pipe, the cold section pipe and hot section pipe of the reheat steam. 1.2.3 The high-pressure bypass system. 1.2.4 The steam source pipeline of the steam feed pump. 2 Quality Criterion and Parameter Selection of Pipe Blowing 2.1 Quality Criterion of Pipe Blowing 2.1.1 As required by 10.5.8 in "The Code of Erection and Acceptance of Electric Power Construction" (Section of Steam Boiler Set) (hereinafter referred to as Boiler Section): the pipe blowing coefficients of the superheater, the reheater and each section of the boiler shall be greater than 1; the target plate made with aluminium sheet shall be installed in the temporary steam exhaust pipe (or at the steam exhaust port) at the end of the blown pipe, with the width about 8% of the inside diameter of the steam exhaust pipe and the length straightly through the internal pipe size; on the premise of ensuring the pipe blowing coefficient, the target plate shall be replaced for successive two times for inspection, and blowing qualification shall be identified if the blackspot generated due to impact on the target plate is not greater than 0.8mm and the macroscopic blackspot is not more than 8 points. 2.1.2 While the two-section method is adopted for blowing, the reheater and its pipeline shall be blown and the blowing for them shall be qualified through inspection after the blowing for main steam pipeline is qualified. While the one-section method is adopted for blowing, the blowing qualities for the main steam pipeline and the reheat steam pipeline shall be separately inspected until to meet the criterion requirements.
Contents of HDJZ 1998
Contents 1 Purpose and Scope of Pipe Blowing 2 Quality Criterion and Parameter Selection of Pipe Blowing 3 Pipe Blowing Modes and Methods 4 Installation of and Technical Requirements for Temporary Facilities 5 Key Implementation Points on Pipe Blowing Technology 6 Safety and Cautions for Blowing Operation Appendix A Application of Differential Pressure Method in Pipe Blowing Technology Appendix B Typical Structure of the Granula Collector Appendix C Counterforce Calculation of the Steam Exhaust Pipe while Pipe Blowing Appendix D Structure of Tandem-shaft Target Plate Device
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
HDJZ 1998, HDJZ/T 1998, HDJZT 1998, HDJZ1998, HDJZ/T1998, HDJZT1998,