2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/HG/T 20637.4-1998
HG/T 20637.4-1998   Preparation of requirements for instrumentation construction and erection (English Version)
Standard No.: HG/T 20637.4-1998 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 9000 words Translation Price(USD):220.0 remind me the price change

Email:

Implemented on:1999-1-1 Delivery: via email in 1 business day

→ → →

,2018-4-1,1999-1-1,141137326957768D090760D4B0B3E
Standard No.: HG/T 20637.4-1998
English Name: Preparation of requirements for instrumentation construction and erection
Chinese Name: 仪表施工安装要求的编制
Chinese Classification: P94    Metal equipment and process pipe installation engineering
Professional Classification: HG    Professional Standard - Chemistry
ICS Classification: 25.040.40 25.040.40    Industrial process measurement and control 25.040.40
Source Content Issued by: State Bureau of Petroleum and Chemical Industries
Issued on: 1998-6-22
Implemented on: 1999-1-1
Status: superseded
Superseded by:HG/T 20637.4-2017
Superseded on:2018-4-1
Target Language: English
File Format: PDF
Word Count: 9000 words
Translation Price(USD): 220.0
Delivery: via email in 1 business day
1.0.1 This Guide is prepared to obtain accurate control survey to meet the requirements for instrument maintenance and easy operation, and to correctly determine the erection position of instrument. 1.0.2 This Guide is used to instruct the instrumentation designing personnel to prepare the requirements for the construction and erection of instrument for project items,or to instruct the designing personnel to select or supplement the requirements of the construction and erection of instrument (general) in Appendix A of this provision, to form the requirements for construction and erection of instrument for project items. 1.0.3 The implementation of this Guide shall also meet the requirements of current relevant standards of the nation.
1 General 2 Contents of Requirements for Instrumentation Construction and Erection 2.1 General requirements 2.2 Control room and instrument panel 2.3 Alarming and interlocking system 2.4 Flow 2.5 Liquid level instrument 2.6 Pressure and differential pressure instrument 2.7 Thermometric instrument 2.8 Analysis meter 2.9 Special instrument 2.10 Control valve 2.11 Power supply and air supply 2.12 Cable and pneumatic signal pipeline 2.13 Heat insulation and heat tracing 3 Preparation Requirements of Requirements for Instrumentation Construction and Erection Appendix A Requirements for Instrumentation Construction and Erection(versatile) A.1 General Description A.2 Control room and instrument panel A.3 Alarming and interlocking system A.4 Flow A.5 Level instrument A.6 Pressure and differential pressure instrument A.7 Thermometric instrument A.8 Analyzer A.9 Special equipments A.10 Control valve A.1l Power supply and air supply A.12 Cable and pneumatic signal pipe line A.13 Heat insulation and heat tracing Appendix B Accessing Mode of Instrument
HG/T 20637.4-1998 is referred in:
* HG/T 20637.1-1998 Composition and preparation for engineering documents of instrumentation
* HG/T 20636.9-1998 Checking list for review and approval for engineering design of instrumentation
* HG/T 20636.9-1998 Checking list for review and approval for engineering design of instrumentation
* HG/T 20637.1-1998 Composition and preparation for engineering documents of instrumentation
Code of China
Standard
HG/T 20637.4-1998  Preparation of requirements for instrumentation construction and erection (English Version)
Standard No.HG/T 20637.4-1998
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count9000 words
Price(USD)220.0
Implemented on1999-1-1
Deliveryvia email in 1 business day
Detail of HG/T 20637.4-1998
Standard No.
HG/T 20637.4-1998
English Name
Preparation of requirements for instrumentation construction and erection
Chinese Name
仪表施工安装要求的编制
Chinese Classification
P94
Professional Classification
HG
ICS Classification
Issued by
State Bureau of Petroleum and Chemical Industries
Issued on
1998-6-22
Implemented on
1999-1-1
Status
superseded
Superseded by
HG/T 20637.4-2017
Superseded on
2018-4-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
9000 words
Price(USD)
220.0
Keywords
HG/T 20637.4-1998, HG 20637.4-1998, HGT 20637.4-1998, HG/T20637.4-1998, HG/T 20637.4, HG/T20637.4, HG20637.4-1998, HG 20637.4, HG20637.4, HGT20637.4-1998, HGT 20637.4, HGT20637.4
Introduction of HG/T 20637.4-1998
1.0.1 This Guide is prepared to obtain accurate control survey to meet the requirements for instrument maintenance and easy operation, and to correctly determine the erection position of instrument. 1.0.2 This Guide is used to instruct the instrumentation designing personnel to prepare the requirements for the construction and erection of instrument for project items,or to instruct the designing personnel to select or supplement the requirements of the construction and erection of instrument (general) in Appendix A of this provision, to form the requirements for construction and erection of instrument for project items. 1.0.3 The implementation of this Guide shall also meet the requirements of current relevant standards of the nation.
Contents of HG/T 20637.4-1998
1 General 2 Contents of Requirements for Instrumentation Construction and Erection 2.1 General requirements 2.2 Control room and instrument panel 2.3 Alarming and interlocking system 2.4 Flow 2.5 Liquid level instrument 2.6 Pressure and differential pressure instrument 2.7 Thermometric instrument 2.8 Analysis meter 2.9 Special instrument 2.10 Control valve 2.11 Power supply and air supply 2.12 Cable and pneumatic signal pipeline 2.13 Heat insulation and heat tracing 3 Preparation Requirements of Requirements for Instrumentation Construction and Erection Appendix A Requirements for Instrumentation Construction and Erection(versatile) A.1 General Description A.2 Control room and instrument panel A.3 Alarming and interlocking system A.4 Flow A.5 Level instrument A.6 Pressure and differential pressure instrument A.7 Thermometric instrument A.8 Analyzer A.9 Special equipments A.10 Control valve A.1l Power supply and air supply A.12 Cable and pneumatic signal pipe line A.13 Heat insulation and heat tracing Appendix B Accessing Mode of Instrument
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
HG/T 20637.4-1998, HG 20637.4-1998, HGT 20637.4-1998, HG/T20637.4-1998, HG/T 20637.4, HG/T20637.4, HG20637.4-1998, HG 20637.4, HG20637.4, HGT20637.4-1998, HGT 20637.4, HGT20637.4