2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SH 3009-2013
SH 3009-2013   Specifications for design of combustible gas emission system in petrochemical industry (English Version)
Standard No.: SH 3009-2013 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 10000 words Translation Price(USD):250.0 remind me the price change

Email:

Implemented on:2014-3-1 Delivery: via email in 1 business day

→ → →

,,2014-3-1,1411379020535620D1C25AB5B7797
Standard No.: SH 3009-2013
English Name: Specifications for design of combustible gas emission system in petrochemical industry
Chinese Name: 石油化工可燃性气体排放系统设计规范
Professional Classification: SH    Professional Standard - Petrochemical
Source Content Issued by: MIIT
Issued on: 2013-10-17
Implemented on: 2014-3-1
Status: valid
Superseding:SH 3009-2001 Specifications for design of fuel gas system and combustible gas emission system in petrochemical enterprises
Target Language: English
File Format: PDF
Word Count: 10000 words
Translation Price(USD): 250.0
Delivery: via email in 1 business day
1 Scope This Specification specifies the design requirements for combustible gas discharge system in petrochemical industry. This Specification is applicable to the design of the newly-constructed, extended or reconstructed engineering of combustible gas discharge system in petrochemical industry. 2 Normative References The following referenced documents are indispensable for the application of this specification. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB 150 Steel Pressure Vessels GB/T 3840 Technical Methods for Making Local Emission Standards of Air Pollutants GB 50160 Fire Prevention Code of Petrochemical Enterprise Design 3 Terms and Definitions The following terms and definitions are applicable to this specification. 3.1 Combustible gas discharge system
Contents Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 General Requirement 5 Setting of Site-wide Combustible Gas Discharge System 5.1 Setting Philosophy of Site-wide Combustible Gas Discharge System 5.2 Gases That Can Be Discharged into the Site-wide Combustible Gas Discharge System 5.3 Gases That Shall NOT BE Discharged into the Site-wide Combustible Gas Discharge System 5.4 Setting Philosophy of Pipe Network of Site-wide Combustible Gas Discharge System e 5.5 Setting philosophy of Flares 6 Determination of the Design of Discharge Condition 6.1 Discharge Condition for Combustible Gas of Process Unit 6.2 Definition of System Design Load for Multi-process Units 7 Pipe Network of Site-wide Combustible Gas Discharge System 7.1 Process Design 7.2 Piping Design 8 Drums and Seals 8.1 Drums 8.2 Seals 9 Elevated Flare 9.1 Allowable Thermal Radiation Intensity 9.2 Flare Tip and Flare Stack 9.3 Determination of the Flare Height 9.4 Ignition Facility 9.5 Flashback Prevention Facility 10 Ground Flares 10.1 Design Principles of Ground Flares 10.2 Enclosed Ground Flare 10.3 Multi-burner Staged Flare 11 Flare Gas Recovery Bibliography Explanation of Wording in the Specification
Referred in SH 3009-2013:
* GB 150-2011 Pressure Vessels (Collection GB150.1~150.4-2011)
* GB/T 3840-1991 Technical methods for making local emission standards of air pollutants
* GB 50160-2008 Fire Prevention Code of Petrochemical Enterprise Design
SH 3009-2013 is referred in:
*SH/T 3024-2017 Design Specification for Environmental Protection in Petrochemical Industry
Code of China
Standard
SH 3009-2013  Specifications for design of combustible gas emission system in petrochemical industry (English Version)
Standard No.SH 3009-2013
Statusvalid
LanguageEnglish
File FormatPDF
Word Count10000 words
Price(USD)250.0
Implemented on2014-3-1
Deliveryvia email in 1 business day
Detail of SH 3009-2013
Standard No.
SH 3009-2013
English Name
Specifications for design of combustible gas emission system in petrochemical industry
Chinese Name
石油化工可燃性气体排放系统设计规范
Chinese Classification
Professional Classification
SH
ICS Classification
Issued by
MIIT
Issued on
2013-10-17
Implemented on
2014-3-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
SH 3009-2001 Specifications for design of fuel gas system and combustible gas emission system in petrochemical enterprises
Language
English
File Format
PDF
Word Count
10000 words
Price(USD)
250.0
Keywords
SH 3009-2013, SH/T 3009-2013, SHT 3009-2013, SH3009-2013, SH 3009, SH3009, SH/T3009-2013, SH/T 3009, SH/T3009, SHT3009-2013, SHT 3009, SHT3009
Introduction of SH 3009-2013
1 Scope This Specification specifies the design requirements for combustible gas discharge system in petrochemical industry. This Specification is applicable to the design of the newly-constructed, extended or reconstructed engineering of combustible gas discharge system in petrochemical industry. 2 Normative References The following referenced documents are indispensable for the application of this specification. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB 150 Steel Pressure Vessels GB/T 3840 Technical Methods for Making Local Emission Standards of Air Pollutants GB 50160 Fire Prevention Code of Petrochemical Enterprise Design 3 Terms and Definitions The following terms and definitions are applicable to this specification. 3.1 Combustible gas discharge system
Contents of SH 3009-2013
Contents Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 General Requirement 5 Setting of Site-wide Combustible Gas Discharge System 5.1 Setting Philosophy of Site-wide Combustible Gas Discharge System 5.2 Gases That Can Be Discharged into the Site-wide Combustible Gas Discharge System 5.3 Gases That Shall NOT BE Discharged into the Site-wide Combustible Gas Discharge System 5.4 Setting Philosophy of Pipe Network of Site-wide Combustible Gas Discharge System e 5.5 Setting philosophy of Flares 6 Determination of the Design of Discharge Condition 6.1 Discharge Condition for Combustible Gas of Process Unit 6.2 Definition of System Design Load for Multi-process Units 7 Pipe Network of Site-wide Combustible Gas Discharge System 7.1 Process Design 7.2 Piping Design 8 Drums and Seals 8.1 Drums 8.2 Seals 9 Elevated Flare 9.1 Allowable Thermal Radiation Intensity 9.2 Flare Tip and Flare Stack 9.3 Determination of the Flare Height 9.4 Ignition Facility 9.5 Flashback Prevention Facility 10 Ground Flares 10.1 Design Principles of Ground Flares 10.2 Enclosed Ground Flare 10.3 Multi-burner Staged Flare 11 Flare Gas Recovery Bibliography Explanation of Wording in the Specification
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SH 3009-2013, SH/T 3009-2013, SHT 3009-2013, SH3009-2013, SH 3009, SH3009, SH/T3009-2013, SH/T 3009, SH/T3009, SHT3009-2013, SHT 3009, SHT3009