2025-12-6 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SHSG 033-2008
SHSG 033-2008   The Provisions for the Basic Engineering Design of Petrochemical Plants (English Version)
Standard No.: SHSG 033-2008 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 22000 words Translation Price(USD):440.0 remind me the price change

Email:

Implemented on:2009-1-1 Delivery: via email in 1 business day

→ → →

,,2009-1-1,141137615454419FAC54CA6B124E6
Standard No.: SHSG 033-2008
English Name: The Provisions for the Basic Engineering Design of Petrochemical Plants
Chinese Name: 石油化工装置基础工程设计内容规定
Professional Classification: SH    Professional Standard - Petrochemical
Source Content Issued by: SINOPEC
Issued on: 2009-01-01
Implemented on: 2009-1-1
Status: valid
Superseding:SHSG 033-2003 Provisions for the Basic Engineering Design of Petrochemical Plants
Target Language: English
File Format: PDF
Word Count: 22000 words
Translation Price(USD): 440.0
Delivery: via email in 1 business day
1.1 "The provisions for the basic engineering design of petrochemical plants" (hereafter referred to as the provisions) are formulated with a view to improving the quality of engineering design of petrochemical industry, and unifying content and depth of basic engineering documents of petrochemical plant. 1.2 These provisions are applicable to basic engineering of new, extended and rebuilt petrochemical plants. 1.3 The documents of basic engineering shall be formulated in accordance with contract and approved overall design or feasibility study report, Process Design Kit and basis design materials. 1.4 The depth of basic engineering documents shall satisfy the requirements of owner's reviewing, preparation of engineering material procurement, preparation of construction and detailed engineering; the composition of the design documents of the chapter exclusive for "firefighting design", "environmental protection", "safety plant design", "occupational health", "energy conservation" and "earthquake protection" shall comply with Annex A, Annex B Annex C, Annex D, Annex E and Annex F. 1.5 All engineering philosophy and technical proposal shall be determined at basic engineering phase; typical implementation period of an engineering design corresponding to these provisions are listed in Annex G. 1.6 These provisions are the basic requirements on the content of basic engineering documents for petrochemical plant, and extension content of expansion and reconstruction project shall be noted in the design document. The special requirements of owner shall be negotiated when signing the contract. 1.7 These provisions has no unified regulation in drawing and table format of basic engineering, and drawing and table format may be formulated by design organization in accordance with the provisions of its own. 1.8 These provision may be referenced in the preparation of parts and chapter, and cannot be regarded as the criteria of inner profession arrangement and work specification in design organization. 1.9 The provisions related to these provisions refer to "the provisions of Process Design Kit for Petrochemical Plants (Whole-set Technology and Process Kit)", "the provisions in the Detailed engineering for Petrochemical Plant" (SHSG - 053) and "preparation method for preliminary estimate of engineering construction for petrochemical industry". 1.10 Process parts of basic engineering such as oil product storage and transportation, independent public utilities and auxiliary facilities (such as circulating water plant, sewage disposal plant, air division and compression plant, and gasoline and electricity combined plants) shall be specified with their design basis, technical proposal and relevant processing documents according to their features, and other parts of them may reference these provisions.
1 General Provisions 2 Overview 3 Process 4 Equipment 5 General Plan and Transportation 6 Plant Arrangement and Piping 7 Instruments 8 Electric System 9 Telecommunication 10 Buildings and Structures 11 Heating, Ventilation and Air Conditioning 12 Analyses and Tests 13 Water Supply, Drainage and Fire Control 14 Preliminary Estimates Annex A: Chapter Exclusive for Fire-fighting Design Annex B: Chapter Exclusive for Environmental Protection Annex C: Chapter Exclusive for Safety Device Design Annex D: Chapter Exclusive for Occupational Health Annex E: Chapter Exclusive forEnergy Conservation Annex G: Typical Implementation Period of a Engineering Design
Code of China
Standard
SHSG 033-2008  The Provisions for the Basic Engineering Design of Petrochemical Plants (English Version)
Standard No.SHSG 033-2008
Statusvalid
LanguageEnglish
File FormatPDF
Word Count22000 words
Price(USD)440.0
Implemented on2009-1-1
Deliveryvia email in 1 business day
Detail of SHSG 033-2008
Standard No.
SHSG 033-2008
English Name
The Provisions for the Basic Engineering Design of Petrochemical Plants
Chinese Name
石油化工装置基础工程设计内容规定
Chinese Classification
Professional Classification
SH
ICS Classification
Issued by
SINOPEC
Issued on
2009-01-01
Implemented on
2009-1-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
SHSG 033-2003 Provisions for the Basic Engineering Design of Petrochemical Plants
Language
English
File Format
PDF
Word Count
22000 words
Price(USD)
440.0
Keywords
SHSG 033-2008, SHSG/T 033-2008, SHSGT 033-2008, SHSG033-2008, SHSG 033, SHSG033, SHSG/T033-2008, SHSG/T 033, SHSG/T033, SHSGT033-2008, SHSGT 033, SHSGT033
Introduction of SHSG 033-2008
1.1 "The provisions for the basic engineering design of petrochemical plants" (hereafter referred to as the provisions) are formulated with a view to improving the quality of engineering design of petrochemical industry, and unifying content and depth of basic engineering documents of petrochemical plant. 1.2 These provisions are applicable to basic engineering of new, extended and rebuilt petrochemical plants. 1.3 The documents of basic engineering shall be formulated in accordance with contract and approved overall design or feasibility study report, Process Design Kit and basis design materials. 1.4 The depth of basic engineering documents shall satisfy the requirements of owner's reviewing, preparation of engineering material procurement, preparation of construction and detailed engineering; the composition of the design documents of the chapter exclusive for "firefighting design", "environmental protection", "safety plant design", "occupational health", "energy conservation" and "earthquake protection" shall comply with Annex A, Annex B Annex C, Annex D, Annex E and Annex F. 1.5 All engineering philosophy and technical proposal shall be determined at basic engineering phase; typical implementation period of an engineering design corresponding to these provisions are listed in Annex G. 1.6 These provisions are the basic requirements on the content of basic engineering documents for petrochemical plant, and extension content of expansion and reconstruction project shall be noted in the design document. The special requirements of owner shall be negotiated when signing the contract. 1.7 These provisions has no unified regulation in drawing and table format of basic engineering, and drawing and table format may be formulated by design organization in accordance with the provisions of its own. 1.8 These provision may be referenced in the preparation of parts and chapter, and cannot be regarded as the criteria of inner profession arrangement and work specification in design organization. 1.9 The provisions related to these provisions refer to "the provisions of Process Design Kit for Petrochemical Plants (Whole-set Technology and Process Kit)", "the provisions in the Detailed engineering for Petrochemical Plant" (SHSG - 053) and "preparation method for preliminary estimate of engineering construction for petrochemical industry". 1.10 Process parts of basic engineering such as oil product storage and transportation, independent public utilities and auxiliary facilities (such as circulating water plant, sewage disposal plant, air division and compression plant, and gasoline and electricity combined plants) shall be specified with their design basis, technical proposal and relevant processing documents according to their features, and other parts of them may reference these provisions.
Contents of SHSG 033-2008
1 General Provisions 2 Overview 3 Process 4 Equipment 5 General Plan and Transportation 6 Plant Arrangement and Piping 7 Instruments 8 Electric System 9 Telecommunication 10 Buildings and Structures 11 Heating, Ventilation and Air Conditioning 12 Analyses and Tests 13 Water Supply, Drainage and Fire Control 14 Preliminary Estimates Annex A: Chapter Exclusive for Fire-fighting Design Annex B: Chapter Exclusive for Environmental Protection Annex C: Chapter Exclusive for Safety Device Design Annex D: Chapter Exclusive for Occupational Health Annex E: Chapter Exclusive forEnergy Conservation Annex G: Typical Implementation Period of a Engineering Design
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SHSG 033-2008, SHSG/T 033-2008, SHSGT 033-2008, SHSG033-2008, SHSG 033, SHSG033, SHSG/T033-2008, SHSG/T 033, SHSG/T033, SHSGT033-2008, SHSGT 033, SHSGT033