2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SL 168-2012
SL 168-2012   The acceptance code for construction of small hydropower station (English Version)
Standard No.: SL 168-2012 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 44500 words Translation Price(USD):1335.0 remind me the price change

Email:

Implemented on:2013-2-23 Delivery: via email in 1~5 business day

→ → →

,,2013-2-23,EF176113C46B7F9C1726109753528
Standard No.: SL 168-2012
English Name: The acceptance code for construction of small hydropower station
Chinese Name: 小型水电站建设工程验收规程
Chinese Classification: P59    Water power engineering
Professional Classification: SL    Professional Standard - Water Resources
Source Content Issued by: Ministry of Water Resources
Issued on: 2012-11-23
Implemented on: 2013-2-23
Status: valid
Superseding:SL 168-1996 The acceptance code for construction of small hydropower station
Target Language: English
File Format: PDF
Word Count: 44500 words
Translation Price(USD): 1335.0
Delivery: via email in 1~5 business day
为加强小型水电站建设工程的建设管理,保证工程验收质量,使小型水电站建设工程的验收制度化、规范化,制定本标准。本标准适用于新建的总装机容量50 MW及以下、1.0MW及以上的小型水电站建设工程的验收。改扩建的小水电工程和新建的总装机容量1.0MW以下的小水电站工程验收可参照执行。
Code of China
Standard
SL 168-2012  The acceptance code for construction of small hydropower station (English Version)
Standard No.SL 168-2012
Statusvalid
LanguageEnglish
File FormatPDF
Word Count44500 words
Price(USD)1335.0
Implemented on2013-2-23
Deliveryvia email in 1~5 business day
Detail of SL 168-2012
Standard No.
SL 168-2012
English Name
The acceptance code for construction of small hydropower station
Chinese Name
小型水电站建设工程验收规程
Chinese Classification
P59
Professional Classification
SL
ICS Classification
Issued by
Ministry of Water Resources
Issued on
2012-11-23
Implemented on
2013-2-23
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
SL 168-1996 The acceptance code for construction of small hydropower station
Language
English
File Format
PDF
Word Count
44500 words
Price(USD)
1335.0
Keywords
SL 168-2012, SL/T 168-2012, SLT 168-2012, SL168-2012, SL 168, SL168, SL/T168-2012, SL/T 168, SL/T168, SLT168-2012, SLT 168, SLT168
Introduction of SL 168-2012
为加强小型水电站建设工程的建设管理,保证工程验收质量,使小型水电站建设工程的验收制度化、规范化,制定本标准。本标准适用于新建的总装机容量50 MW及以下、1.0MW及以上的小型水电站建设工程的验收。改扩建的小水电工程和新建的总装机容量1.0MW以下的小水电站工程验收可参照执行。
Contents of SL 168-2012
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SL 168-2012, SL/T 168-2012, SLT 168-2012, SL168-2012, SL 168, SL168, SL/T168-2012, SL/T 168, SL/T168, SLT168-2012, SLT 168, SLT168