2025-12-6 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/TB/T 3302-2013
TB/T 3302-2013   Technical Specification for Laying of High Speed Turnouts of Slab Track (English Version)
Standard No.: TB/T 3302-2013 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 6000 words Translation Price(USD):120.0 remind me the price change

Email:

Implemented on:2013-6-1 Delivery: via email in 1 business day

→ → →

,,2013-6-1,A0592231744C303A1412780291747
Standard No.: TB/T 3302-2013
English Name: Technical Specification for Laying of High Speed Turnouts of Slab Track
Chinese Name: 高速铁路无砟轨道道岔铺设技术条件
Professional Classification: TB    Professional Standard - Railway Transport
Source Content Issued by: Ministry of Railways
Issued on: 2013-2-20
Implemented on: 2013-6-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 6000 words
Translation Price(USD): 120.0
Delivery: via email in 1 business day
1 Scope This standard specifies technical requirements, test methods and rules for laying of high speed turnouts for slab track. This standard is applicable to laying of turnouts for slab track of high speed railway main track of running speed 250 km/h to 350 km/h. 2 Normative References The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. TB/T 1632.1 Welding of Rails — Part 1: General Specification TB 10601 Code for Engineering Survey of High Speed Railway 3 Technical Requirements 3.1 Preparation of laying 3.1.1 Before laying, the variety, specification and quantity of turnout components listed in consignment note and packing list shall be checked, and check their appearance and quality certificates. 3.1.2 Laying of turnouts shall be conducted after construction quality acceptance of subgrade, bridge and tunnel in turnout zone are qualified and precise survey network is surveyed and set in turnout zone. 3.1.3 Before laying, turnout center, control benchmark of straight rail and side rail shall be surveyed and set; turnout laying position shall be determined according to control benchmark surveyed and set. 3.2 Hoisting, transportation and storage 3.2.1 Hoisting
Foreword II 1 Scope 2 Normative References 3 Technical Requirements 4 Test Methods and Rules
Referred in TB/T 3302-2013:
*TB/T 1632.1-2014 Welding of rails-Part 1: General specification
*TB 10601-2009 Code for engineering survey of high speed railway
Code of China
Standard
TB/T 3302-2013  Technical Specification for Laying of High Speed Turnouts of Slab Track (English Version)
Standard No.TB/T 3302-2013
Statusvalid
LanguageEnglish
File FormatPDF
Word Count6000 words
Price(USD)120.0
Implemented on2013-6-1
Deliveryvia email in 1 business day
Detail of TB/T 3302-2013
Standard No.
TB/T 3302-2013
English Name
Technical Specification for Laying of High Speed Turnouts of Slab Track
Chinese Name
高速铁路无砟轨道道岔铺设技术条件
Chinese Classification
Professional Classification
TB
ICS Classification
Issued by
Ministry of Railways
Issued on
2013-2-20
Implemented on
2013-6-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
6000 words
Price(USD)
120.0
Keywords
TB/T 3302-2013, TB 3302-2013, TBT 3302-2013, TB/T3302-2013, TB/T 3302, TB/T3302, TB3302-2013, TB 3302, TB3302, TBT3302-2013, TBT 3302, TBT3302
Introduction of TB/T 3302-2013
1 Scope This standard specifies technical requirements, test methods and rules for laying of high speed turnouts for slab track. This standard is applicable to laying of turnouts for slab track of high speed railway main track of running speed 250 km/h to 350 km/h. 2 Normative References The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. TB/T 1632.1 Welding of Rails — Part 1: General Specification TB 10601 Code for Engineering Survey of High Speed Railway 3 Technical Requirements 3.1 Preparation of laying 3.1.1 Before laying, the variety, specification and quantity of turnout components listed in consignment note and packing list shall be checked, and check their appearance and quality certificates. 3.1.2 Laying of turnouts shall be conducted after construction quality acceptance of subgrade, bridge and tunnel in turnout zone are qualified and precise survey network is surveyed and set in turnout zone. 3.1.3 Before laying, turnout center, control benchmark of straight rail and side rail shall be surveyed and set; turnout laying position shall be determined according to control benchmark surveyed and set. 3.2 Hoisting, transportation and storage 3.2.1 Hoisting
Contents of TB/T 3302-2013
Foreword II 1 Scope 2 Normative References 3 Technical Requirements 4 Test Methods and Rules
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
TB/T 3302-2013, TB 3302-2013, TBT 3302-2013, TB/T3302-2013, TB/T 3302, TB/T3302, TB3302-2013, TB 3302, TB3302, TBT3302-2013, TBT 3302, TBT3302