 |
|
Standard
T/CSPSTC 54-2020 Technical specification for rock tunnel boring machine method (English Version) |
Detail of T/CSPSTC 54-2020
Standard No. |
English Name |
Chinese Name |
Chinese Classification |
Professional Classification |
ICS Classification |
Issued by |
Issued on |
Implemented on |
Status |
Superseded by |
Superseded on |
Abolished on |
Superseding |
Language |
File Format |
Word Count |
Price(USD) |
Keywords |
Introduction of T/CSPSTC 54-2020
本文件规定了采用全断面岩石掘进机法修建隧道的地质勘察、隧道结构设计、特殊地质设计、辅助工程、掘进机选型、设计与监造、施工准备、施工测量、预制构件制作、掘进机运输、组装、调试和拆机、超前地质预报、掘进与支护、防排水、施工通风除尘、降温及水电供应、掘进机维修与保养、监控量测及信息化管理、工程验收等内容。
本文件适用于采用全断面岩石掘进机法新建隧道的勘察、设计、施工和工程质量验收。
Contents of T/CSPSTC 54-2020