2025-12-19 10.8.118.215
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/TG/HY102-2015
TG/HY102-2015   Rules for Railway Freight Loading Reinforcement (English Version)
Standard No.: TG/HY102-2015 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 21,000 words Translation Price(USD):1200.0 remind me the price change

Email:

Implemented on:2015-1-1 Delivery: via email in 1 business day

→ → →

,,2015-1-1,153512639261500030661fe79edc6568
Standard No.: TG/HY102-2015
English Name: Rules for Railway Freight Loading Reinforcement
Chinese Name: 铁路货物装载加固规则
Professional Classification: TG    
Issued on: 2015-01-01
Implemented on: 2015-1-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 21,000 words
Translation Price(USD): 1200.0
Delivery: via email in 1 business day
China Railways Corporation Rules for Railway Freight Loading Reinforcement 铁路货物装载加固规则 TIEZONGYUN [2015] No. 296 Contents Chapter I General Provisions 1 Chapter II Basic Technical Provisions 2 Chapter III Special Regulations 15 Section I Out-Of-Gauge and Lengthy Goods 15 Section II Wood and Bamboo 17 Section III Wheel and Crawler Type Goods and Cylindrical and Spherical Goods 18 Section IV Metal Materials and Articles 20 Section V Coil Steel 21 Section VI Prestressed Beam 23 Chapter IV Scheme Management 23 Chapter V Loading Reinforcement Materials and Device Management 27 Chapter VI Emergency Treatment 28 Chapter VII Full Load Work 29 Chapter VIII Supplementary Articles 29 Attachment 1 Finalized Scheme for Railway Freight Loading Reinforcement 30 Attachment 2 Common Calculation Formula for Railway Freight Loading Reinforcement 30 Attachment 3 Basic Outline of Rolling Stock Clearance 42 Attachment 4 Loading Limits in Specific Sections 43 Attachment 5 Common Loading Reinforcement Materials and Devices 44 Attachment 6 Regulations on Railway Wagon Load Increment 45 Attachment 7 Loading Reinforcement Abolition and Failure Message Catalog 47 Technical Parameter Table for Open Car, Flat Car, Box Car and Oversize Commodity Car 52 TG/HY 102-2015 Chapter I General Provisions Article 1 With a view to strengthening railway freight loading reinforcement and truck full loading operation, and ensuring the railway transportation safety, the Rules are formulated according to Railway Law of the People's Republic of China, Production Safety Law of the People's Republic of China, Regulation on Managing the Railway Safety, Regulations of Railway Technology Management and other laws and regulations concerned. Article 2 The Rules are applicable to China Railways Corporation (hereinafter referred to as “CRC”) and various subordinate railway enterprises (hereinafter referred to as railway administration), servicing as the fundamental basis for railway freight loading reinforcement and wagon full loading operation. Before joint venture railways, local railways, special railways and special rail lines transport cargoes through national railways, railway administrations shall abide by the Rules when signing the relevant agreements. The railway administration shall abide by the Rules when signing relevant agreements with carriers and consignees. Article 3 Freight loading reinforcement and wagon full loading operation, which are highly technical, constitute an important part of railway transportation. The major objectives are ensuring the integrity of goods and driving safety of wagons; making full use of the loading capacity and cubic capacity of wagon; transporting the goods in safe, rapid, reasonable and economical way. Article 4 The basic technical requirements for freight loading reinforcement: the goods are distributed on the wagon uniformly, stably and reasonably, without overload, offset load, uneven weight or concentrated weight; able to bear various forces generated during normal shunting operation and train running; no movement, rolling, overturning, collapse or falling occur in transit. Article 5 Railway administration shall pay high attention to freight loading reinforcement and wagon full loading operation, assign specific personnel to take charge, actively employ advanced, mature, economical, applicable and reliable technology and equipment, continuously update and improve the technical management measures, and raise the quality of freight loading reinforcement and wagon full loading operation. The railway administration and its subordinate freight station sections (including freight center, the same below) shall establish loading and reinforcement technology leading team and working system. The responsibilities of the leading team include review, declaration, approval and implementation of freight loading reinforcement scheme of its unit; organizing the implementation of scheme-based loading, signing-confirmation system on loading quality and wagon full loading, optimized loading measures; guidance, supervision and inspection of relevant technical services. Article 6 The loading entities shall establish sound loading post responsibility system, adhere to the principle of "strict loading and departure" and abide by the loading reinforcement scheme or related technical requirements. For important goods, loading quality signing-confirmation system applies. The railway administration shall develop loading quality signing-confirmation measures within its jurisdiction and report to Transportation Department of CRC for record. Article 7 For freight loading reinforcement methods, loading reinforcement materials and devices that are not specified in the Rules, trial transportation shall be strictly managed according to the relevant requirements of Chapters IV and V hereof. Article 8 The technical performance of the freight loading reinforcement materials and devices shall comply with the relevant requirements of national standard, professional standard and the Rules, as well as the relevant technical specifications released by the CRC. The railway administration shall prepare the management measures of loading reinforcement material and device. As for patent-involved freight loading reinforcement materials and devices, the protection, use and transfer of patent, as well as dispute settlement shall strictly comply with Patent Law of the People's Republic of China and other regulations concerned. The following shall not be used: any freight loading reinforcement material or device with patent infringement identified by patent administrative department or judged by the people's court. Article 9 The railway administration shall, in accordance with the relevant provisions of the “Rules for the Safety Management of Railway Freight Transportation”, improve the relevant mechanisms to ensure the safety assessment work such as demonstration of the reinforcement scheme and technical inspection. Chapter II Basic Technical Provisions Article 10 Prior to loading, correct vehicle shall be selected in compliance with Wagon Use Restrictions (see Table 2-1) and the relevant requirements. Without the approval of CRC or railway administration not in accordance with administration authority, the goods loaded in any wagon shall not go beyond the corresponding design scope. Table 2-1 Freight Wagon Use Limitation Schedules Sequence number Name of good Limiting conditions Car type Boxcar Open car hopper car Flat car with side plate Flat car without side plate Flat car with end plate, without side plate Flat car with iron deck Common-use car Remark 1 Unpackaged coal, ash, coke, sand, stone, earth, ore, brick × × × × × Flat car without end and side plate, or flat car with end plate (cab apron), without side plate (except common-use car), can ship coal, ash, sand, gravel, earth and brick if enclosure and support are available. 2 Metal block × × × × × Flat car without end and side plate, or flat car with End plate (cab apron), without side plate (except common-use car), can ship unpackaged metal block if enclosure and support are available. 3 Empty iron drum × × × × × secure and enclose rope net 4 Wood × × × × × 5 Lengthy goods × × × × 6 Out-of-gauge goods × × × 7 Steel rail × × × 8 assembled motor vehicle × × × × Assembled motor cycle, walking tractor and light-duty vehicle can be shipped by the box car or open car if the destination station is capable of lifting Note: × ——the car type that is not allowed to be used. The technical parameters of wagon are released by the CRC. See the attachment for the general technical parameters for open car, flat car, box car, oversize commodity car. In case of any discrepancy between the technical parameters marked on the wagon body and those in the attachment, the technical parameters on wagon shall prevail. The wagon manufacture and overhaul units shall guarantee the accuracy of technical parameters marked on the wagon body. It is prohibited to use any open car, flat car, box car or oversize commodity car that are not in the list published by the related department of CRC or with incomplete technical parameters. Article 11 Where flat car with end and side plates are used to load goods that protrude the car floor in length or width, or for the need of goods pull and enforcement, the end and side plates may be put down and the goods are bound firmly with the car body using galvanized iron wire or clamped using iron lock. When the flat car marked with "closed" is running, the end plate shall be upright and closed. Under special circumstances, the car is allowed to run with the end plate laid down, provided that the device for stopping buffer action is installed; or where the end plate of one flat car is lifted reliably, the end plate of its adjacent flat car may be laid down during running. Article 12 After loading, the general gravity center of goods shall be projected at the cross point of longitudinal and horizontal center lines. If deviation is inevitable, the lateral deviation value shall not exceed 100mm; in case of longitudinal deviation, the goods weight on each bogie shall not exceed one half of the allowable loading capacity of wagon, and the load difference between two bogies shall not be greater than 10t. Article 13 If the height of gravity center for wagon loaded is more than 2000mm from the rail surface, the wagon shall run at limited speed as specified in Table 2-2. In this case, the loading station shall send message to the railway administration to ask for instruction and the freight transport management department of railway administration shall give instruction via telegram. In case of trans-administration transportation, it shall copy to the relevant departments of railway administration such as freight transport, transport, maintenance, and works, and Article 34 hereof shall be met. Table 2-2 Center height of gravity for wagon loaded H Operation speed-limiting Speed limit for passing through lateral turnout mm (km/h) (km/h) 2000
Chapter I General Provisions Chapter II Basic Technical Provisions Chapter III Special Regulations Section I Out-Of-Gauge and Lengthy Goods Section II Wood and Bamboo Section III Wheel and Crawler Type Goods and Cylindrical and Spherical Goods Section IV Metal Materials and Articles Section V Coil Steel Section VI Prestressed Beam Chapter IV Scheme Management Chapter V Loading Reinforcement Materials and Device Management Chapter VI Emergency Treatment Chapter VII Full Load Work Chapter VIII Supplementary Articles Attachment 1 Finalized Scheme for Railway Freight Loading Reinforcement Attachment 2 Common Calculation Formula for Railway Freight Loading Reinforcement Attachment 3 Basic Outline of Rolling Stock Clearance Attachment 4 Loading Limits in Specific Sections Attachment 5 Common Loading Reinforcement Materials and Devices Attachment 6 Regulations on Railway Wagon Load Increment Attachment 7 Loading Reinforcement Abolition and Failure Message Catalog Technical Parameter Table for Open Car, Flat Car, Box Car and Oversize Commodity Car
Referred in TG/HY102-2015:
*GB 4943.1-2011 Information technology equipment -Safety - Part 1: General requirements
*FZ/T 73020-2012 Knitted Casual Wear
*GB/T 14048.5-2017 Low-voltage switchgear and controlgear-Part 5-1:Control circuit devices and switching element-Electromechanical control circuit devices
*GB 4706.1-2005 Household and Similar Electrical Appliances – Safety - Part 1: General Requirements
*QB/T 1333-2018 Handbag and Knapsack
*GB 5749-2022 Standards for drinking water quality
*GB 150-2011 Pressure Vessels (Collection GB150.1~150.4-2011)
*QB/T 1333-2018 Handbag and Knapsack
*GB 17625.1-2022 Electromagnetic compatibility—Limits—Part 1: Limits for harmonic current emissions (equipment input current ≤ 16A per phase)
*TSG 21-2016/XG1-2020 Supervision Regulation on Safety Technology for Stationary Pressure Vessel,includes Amendment 1
*GB 14748-2006 Safety Requirements for Wheeled Child Conveyances
*GB/T 35590-2017 Information technology―General specification for portable digital equipments used power bank
*GB 3565-2005 Safety requirements for bicycles
*GB/T 3077-2015 Alloy structure steels
*GB/T 19001-2016 Quality management systems―Requirements
*GB/T 699-2015 Quality carbon structural steels
Code of China
Standard
TG/HY102-2015  Rules for Railway Freight Loading Reinforcement (English Version)
Standard No.TG/HY102-2015
Statusvalid
LanguageEnglish
File FormatPDF
Word Count21,000 words
Price(USD)1200.0
Implemented on2015-1-1
Deliveryvia email in 1 business day
Detail of TG/HY102-2015
Standard No.
TG/HY102-2015
English Name
Rules for Railway Freight Loading Reinforcement
Chinese Name
铁路货物装载加固规则
Chinese Classification
Professional Classification
TG
ICS Classification
Issued by
Issued on
2015-01-01
Implemented on
2015-1-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
21,000 words
Price(USD)
1200.0
Keywords
TG/HY102-2015, TGHY102-2015, TG/HY102-2015, TG/HY102, TGHY102-2015, TGHY102,
Introduction of TG/HY102-2015
China Railways Corporation Rules for Railway Freight Loading Reinforcement 铁路货物装载加固规则 TIEZONGYUN [2015] No. 296 Contents Chapter I General Provisions 1 Chapter II Basic Technical Provisions 2 Chapter III Special Regulations 15 Section I Out-Of-Gauge and Lengthy Goods 15 Section II Wood and Bamboo 17 Section III Wheel and Crawler Type Goods and Cylindrical and Spherical Goods 18 Section IV Metal Materials and Articles 20 Section V Coil Steel 21 Section VI Prestressed Beam 23 Chapter IV Scheme Management 23 Chapter V Loading Reinforcement Materials and Device Management 27 Chapter VI Emergency Treatment 28 Chapter VII Full Load Work 29 Chapter VIII Supplementary Articles 29 Attachment 1 Finalized Scheme for Railway Freight Loading Reinforcement 30 Attachment 2 Common Calculation Formula for Railway Freight Loading Reinforcement 30 Attachment 3 Basic Outline of Rolling Stock Clearance 42 Attachment 4 Loading Limits in Specific Sections 43 Attachment 5 Common Loading Reinforcement Materials and Devices 44 Attachment 6 Regulations on Railway Wagon Load Increment 45 Attachment 7 Loading Reinforcement Abolition and Failure Message Catalog 47 Technical Parameter Table for Open Car, Flat Car, Box Car and Oversize Commodity Car 52 TG/HY 102-2015 Chapter I General Provisions Article 1 With a view to strengthening railway freight loading reinforcement and truck full loading operation, and ensuring the railway transportation safety, the Rules are formulated according to Railway Law of the People's Republic of China, Production Safety Law of the People's Republic of China, Regulation on Managing the Railway Safety, Regulations of Railway Technology Management and other laws and regulations concerned. Article 2 The Rules are applicable to China Railways Corporation (hereinafter referred to as “CRC”) and various subordinate railway enterprises (hereinafter referred to as railway administration), servicing as the fundamental basis for railway freight loading reinforcement and wagon full loading operation. Before joint venture railways, local railways, special railways and special rail lines transport cargoes through national railways, railway administrations shall abide by the Rules when signing the relevant agreements. The railway administration shall abide by the Rules when signing relevant agreements with carriers and consignees. Article 3 Freight loading reinforcement and wagon full loading operation, which are highly technical, constitute an important part of railway transportation. The major objectives are ensuring the integrity of goods and driving safety of wagons; making full use of the loading capacity and cubic capacity of wagon; transporting the goods in safe, rapid, reasonable and economical way. Article 4 The basic technical requirements for freight loading reinforcement: the goods are distributed on the wagon uniformly, stably and reasonably, without overload, offset load, uneven weight or concentrated weight; able to bear various forces generated during normal shunting operation and train running; no movement, rolling, overturning, collapse or falling occur in transit. Article 5 Railway administration shall pay high attention to freight loading reinforcement and wagon full loading operation, assign specific personnel to take charge, actively employ advanced, mature, economical, applicable and reliable technology and equipment, continuously update and improve the technical management measures, and raise the quality of freight loading reinforcement and wagon full loading operation. The railway administration and its subordinate freight station sections (including freight center, the same below) shall establish loading and reinforcement technology leading team and working system. The responsibilities of the leading team include review, declaration, approval and implementation of freight loading reinforcement scheme of its unit; organizing the implementation of scheme-based loading, signing-confirmation system on loading quality and wagon full loading, optimized loading measures; guidance, supervision and inspection of relevant technical services. Article 6 The loading entities shall establish sound loading post responsibility system, adhere to the principle of "strict loading and departure" and abide by the loading reinforcement scheme or related technical requirements. For important goods, loading quality signing-confirmation system applies. The railway administration shall develop loading quality signing-confirmation measures within its jurisdiction and report to Transportation Department of CRC for record. Article 7 For freight loading reinforcement methods, loading reinforcement materials and devices that are not specified in the Rules, trial transportation shall be strictly managed according to the relevant requirements of Chapters IV and V hereof. Article 8 The technical performance of the freight loading reinforcement materials and devices shall comply with the relevant requirements of national standard, professional standard and the Rules, as well as the relevant technical specifications released by the CRC. The railway administration shall prepare the management measures of loading reinforcement material and device. As for patent-involved freight loading reinforcement materials and devices, the protection, use and transfer of patent, as well as dispute settlement shall strictly comply with Patent Law of the People's Republic of China and other regulations concerned. The following shall not be used: any freight loading reinforcement material or device with patent infringement identified by patent administrative department or judged by the people's court. Article 9 The railway administration shall, in accordance with the relevant provisions of the “Rules for the Safety Management of Railway Freight Transportation”, improve the relevant mechanisms to ensure the safety assessment work such as demonstration of the reinforcement scheme and technical inspection. Chapter II Basic Technical Provisions Article 10 Prior to loading, correct vehicle shall be selected in compliance with Wagon Use Restrictions (see Table 2-1) and the relevant requirements. Without the approval of CRC or railway administration not in accordance with administration authority, the goods loaded in any wagon shall not go beyond the corresponding design scope. Table 2-1 Freight Wagon Use Limitation Schedules Sequence number Name of good Limiting conditions Car type Boxcar Open car hopper car Flat car with side plate Flat car without side plate Flat car with end plate, without side plate Flat car with iron deck Common-use car Remark 1 Unpackaged coal, ash, coke, sand, stone, earth, ore, brick × × × × × Flat car without end and side plate, or flat car with end plate (cab apron), without side plate (except common-use car), can ship coal, ash, sand, gravel, earth and brick if enclosure and support are available. 2 Metal block × × × × × Flat car without end and side plate, or flat car with End plate (cab apron), without side plate (except common-use car), can ship unpackaged metal block if enclosure and support are available. 3 Empty iron drum × × × × × secure and enclose rope net 4 Wood × × × × × 5 Lengthy goods × × × × 6 Out-of-gauge goods × × × 7 Steel rail × × × 8 assembled motor vehicle × × × × Assembled motor cycle, walking tractor and light-duty vehicle can be shipped by the box car or open car if the destination station is capable of lifting Note: × ——the car type that is not allowed to be used. The technical parameters of wagon are released by the CRC. See the attachment for the general technical parameters for open car, flat car, box car, oversize commodity car. In case of any discrepancy between the technical parameters marked on the wagon body and those in the attachment, the technical parameters on wagon shall prevail. The wagon manufacture and overhaul units shall guarantee the accuracy of technical parameters marked on the wagon body. It is prohibited to use any open car, flat car, box car or oversize commodity car that are not in the list published by the related department of CRC or with incomplete technical parameters. Article 11 Where flat car with end and side plates are used to load goods that protrude the car floor in length or width, or for the need of goods pull and enforcement, the end and side plates may be put down and the goods are bound firmly with the car body using galvanized iron wire or clamped using iron lock. When the flat car marked with "closed" is running, the end plate shall be upright and closed. Under special circumstances, the car is allowed to run with the end plate laid down, provided that the device for stopping buffer action is installed; or where the end plate of one flat car is lifted reliably, the end plate of its adjacent flat car may be laid down during running. Article 12 After loading, the general gravity center of goods shall be projected at the cross point of longitudinal and horizontal center lines. If deviation is inevitable, the lateral deviation value shall not exceed 100mm; in case of longitudinal deviation, the goods weight on each bogie shall not exceed one half of the allowable loading capacity of wagon, and the load difference between two bogies shall not be greater than 10t. Article 13 If the height of gravity center for wagon loaded is more than 2000mm from the rail surface, the wagon shall run at limited speed as specified in Table 2-2. In this case, the loading station shall send message to the railway administration to ask for instruction and the freight transport management department of railway administration shall give instruction via telegram. In case of trans-administration transportation, it shall copy to the relevant departments of railway administration such as freight transport, transport, maintenance, and works, and Article 34 hereof shall be met. Table 2-2 Center height of gravity for wagon loaded H Operation speed-limiting Speed limit for passing through lateral turnout mm (km/h) (km/h) 2000
Contents of TG/HY102-2015
Chapter I General Provisions Chapter II Basic Technical Provisions Chapter III Special Regulations Section I Out-Of-Gauge and Lengthy Goods Section II Wood and Bamboo Section III Wheel and Crawler Type Goods and Cylindrical and Spherical Goods Section IV Metal Materials and Articles Section V Coil Steel Section VI Prestressed Beam Chapter IV Scheme Management Chapter V Loading Reinforcement Materials and Device Management Chapter VI Emergency Treatment Chapter VII Full Load Work Chapter VIII Supplementary Articles Attachment 1 Finalized Scheme for Railway Freight Loading Reinforcement Attachment 2 Common Calculation Formula for Railway Freight Loading Reinforcement Attachment 3 Basic Outline of Rolling Stock Clearance Attachment 4 Loading Limits in Specific Sections Attachment 5 Common Loading Reinforcement Materials and Devices Attachment 6 Regulations on Railway Wagon Load Increment Attachment 7 Loading Reinforcement Abolition and Failure Message Catalog Technical Parameter Table for Open Car, Flat Car, Box Car and Oversize Commodity Car
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
TG/HY102-2015, TGHY102-2015, TG/HY102-2015, TG/HY102, TGHY102-2015, TGHY102,