2025-5-18 18.97.9.172
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 8564-2003
GB/T 8564-2003   Specification for Installation of Hydraulic Turbine Generator Uni (English Version)
Standard No.: GB/T 8564-2003 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 40000 words Price(USD):340.0 remind me the price change

Email:

Implemented on:1905-6-25 Delivery: via email in 1 business day
,,
Standard No.: GB/T 8564-2003
English Name: Specification for Installation of Hydraulic Turbine Generator Uni
Chinese Name: 水轮发电机组安装技术规范
Chinese Classification: F22    Electric power system equipment installation testing
Professional Classification: GB    National Standard
Issued by: AQSIQ
Issued on: 2003-09-15
Implemented on: 1905-6-25
Status: superseded
Superseded by:GB/T 8564-2023 Technical specification for installation of hydraulic turbine-generator unit
Superseded on:2023-11-27
Superseding:GB 8564-1988 Specification for installation of hydraulic-turbine and generator units
Language: English
File Format: PDF
Word Count: 40000 words
Price(USD): 340.0
Delivery: via email in 1 business day
1 Scope This national standard specifies the installation, debugging of hydraulic turbine generator units and the requirements of test. It is applicable to the installation and/or acceptance of hydraulic turbine generator units in compliance with the following conditions: a) Unit capacity of 15MW and/or higher b) Impulse hydraulic turbine with its nominal diameter of runner at 1.5m and/or above c) Radial-axial flow turbine with its nominal diameter of runner at 2.0 m and/or above d) Axial flow, mixed flow variable pitch turbine, and tubular turbine, with nominal diameter of runner at 3.0m and/or above. Hydraulic turbine generator units with unit capacity smaller than 15MW and units with nominal diameter of turbine runner smaller than that specified in b), c), and d). This national standard is applicable to the installation and/or acceptance of reversible pump storage unit. 2 Normative references The following normative documents contain provisions, which, through reference in this text, constitute provisions of this national standard. For dated reference, subsequent amendments to, or revisions of, any of these publications do not apply. However, it is recommended parties reaching agreement according to this national standard carry out a study on if the most updated version of these documents may be applied or not . For undated reference, the latest edition of the normative document referred to applies. GB3323 Methods for radiographic inspection and classification of radiographs for fusion welded butt joints in steel GB/T7409.3 Excitation system for synchronous electrical machines-Technical requirements of excitation system for large and medium synchronous generators; GB/T7894 Fundamental technical requirements for hydraulic turbine generators; GB/T9652.1 Specifications of governors and Pressure oil supply units for hydraulic turbines; GB/T9652.2 Test acceptance codes of governors and pressure oil supply units for hydro-turbines; GB/T10969 Specifications for water passage components of hydraulic turbines; GB/T11120L-TSA Turbine Oil; GB11345 Method for manual ultrasonic testing and classification of testing results for ferritic steel welds; GB/T18482 Start - up test code for reversible pump - storage units; GB50150 Emending explanation of Standard for hand-over test of electric equipment electric equipment; GB50168 Code for construction and acceptance of cable levels electric equipment installation engineering; GB50171 Acceptance of switchboard outfit complete cubicle and secondary Circuit Electric Machine; DL/T507 Start-up test code for hydraulic-turbine and generator units; DL/T679 Code for welder technical qualification; DL/T827 Start-up test code for bulb tubular hydraulic-turbine and generator units; JB/T4709 Welding specification for steel pressure vessels; JB/T6204 Specification for withstand voltage test on stator coil and winding insulation of high voltage AC machines; JB/T8439Technical requirements on suppress corona of high-tension machines used in high altitude areas JB/T8660 Standard for hydroelectric set packing, transportation and preservation 3 General principles 3.1 Installation of hydraulic turbine generator unit shall proceed according to this national standard in compliance with the installation drawing approved by design organization and manufacturer as well as related technical documents. Special requirements raised by the manufacturer shall be satisfied according to related technical documents. Supplementary provisions for requirements not listed in this standard and technical documents of manufacturer shall be specified additionally. In case of a conflict between the technical requirements from the manufacturer and this standard, generally, the requirements of the manufacturer shall proceed. Otherwise, consult with the manufacturer for a settlement.
1 Scope 2 Normative references 3 General principles 4 General regulations 5 Installation of vertical type reaction turbine 5.1 Installation of built-in fitting 5.2 Runner installation 5.3 Preassembling of the guide apparatus 5.4 Emplacement and installation of rotatable parts 5.5 Installation and adjustment of guide blade and/or servomotor 5.6 Installation of water conduit and main shaft seal 5.7 Installation of fittings 6 Installation of tubular turbine 6.1 Installation of built-in fitting 6.2 Installation of principal axes 6.3 Installation of guide apparatus 6.4 Installation of guide apparatus 6.5 Installation of the principal axes, runner and runner chamber 7 Installation of impulse turbine 7.1 Installation of diversion conduit 7.2 Installation of case 7.3 Installation of the bearing of turbine shaft 7.4 Installation of turbine shaft 7.5 Installation of sprayer and servomotor 7.6 Installation of runner 7.7 Installation and adjustment of control mechanism 8 Installation and debugging of speed regulating system 8.1 Installation and debugging of oil pressure devices 8.2 Installation of speed governor 8.3 Oil filling adjustment test of speed regulating system 8.4 Simulation test of speed regulating system 9 Installation of vertical type hydraulic turbine generator 9.1 Combination of framework 9.2 Grounding and scraping of bearing shell 9.3 Stator installation 9.4 Rotor installation 9.5 Overall installation 9.6 Installation of excitation system and devices 10 Installation of horizontal hydraulic generator 10.1 Grounding and scraping of bearing bush 10.2 Installation of bearing pedestal 10.3 Installation of stator, rotor and/or fitment 10.4 Checking of each part of the bearing and clearance adjustment 11 Installation of bulb-type hydraulic generator 11.1 Installation of stator 11.2 Installation of rotor 11.3 Installation of principal axes and composition bearing 11.4 Generator installation 12 Installation of tube and fitments 12.1 Fabrication of tube fittings and fitments of tube 12.2 Tube welding 12.3 Installation of tube 12.4 Treatment of the inner wall of tube 12.5 Test of the conduit and tube fittings 13 Installation of butterfly valve and ball valve 13.1 Installation of butterfly valve 13.2 Installation of ball valve 13.3 Installation of flexible connector 13.4 The installation of hydraulic control valve and air valve 13.5 Installation of operating mechanism 14 Electrical test of hydraulic turbine generator unit 15 Trial run of hydraulic turbine generator unit 15.1 General specifications 15.2 Water filling test of assembling unit 15.3 Zero load trial run of unit 15.3.1 Operational check of unit mechanism: 15.3.2 Adjustment and test of speed regulator: 15.4 Test over paralleling in of unit and under load Annex A Annex B Annex C Annex D Annex E Annex F Annex G
Referred in GB/T 8564-2003:
*GB3323-
*GB/T 7409.3-2007 Excitation system for synchronous electrical machines—Technical requirements of excitation system for large and medium synchronous generators
*GB/T 7894-2023 Fundamental technical requirements for hydrogenerators
*GB/T 9652.1-2019 Specification of hydraulic turbine governing systems
*GB/T 9652.2-2019 Testing specification of hydraulic turbine governing systems
*GB/T 10969-2008 Specification for Water Passage Components of Hydraulic Turbines, Storage Pumps and Pump-turbines
*GBT11120-
*GB11345-
*GB/T 18482-2010 Specification for start-up test of reversible pumped-storage units
*GB 50150-2016 Standard for hand - over test of electrical equipment for installation of electrical installations
*GB 50168-2018 Standard for construction and acceptance of cable line electric equipment installation engineering
*GB 50171-2012 Erection works of electrical installations Code for construction and acceptance of switchboard outfit,complete cubicle and secondary circuit
*DL/T 507-2014 Testing Regulations for Hydroelectric Generating Set Start-up
*DL/T 679-2012 Code for welder technical qualification
*DL/T 827-2014 Start-up Test Code for Bulb Turbine and Generator Units
*JB/T 4709-2000 Welding specification for steel pressure vessels
*JB/T 6204-2002 Specifications for Withstanding Voltage Test Oil Stator Coil and
*JB/T 8439-2008 Corona-proof specification of high voltage rotating a.c machines used in high altitude area
*JB/T 8660-1997 Code for Packaging, Transport and Storage of Hydropower Units
GB/T 8564-2003 is referred in:
* GB/T 15468-2006 Fundamental Technical Requirements for Hydraulic Turbines
* GB/T 20835-2007 Guides for Magnetization Test of Generator Stator Core
* GB/T 11805-2008 Basic specifications of automatic control components (devices) and their related system for hydroturbine-generating sets
* GB/T 7894-2009 Fundamental technical specifications for hydro generators
* GB/T 10969-2008 Specification for Water Passage Components of Hydraulic Turbines, Storage Pumps and Pump-turbines
* GB/T 7894-2009 Fundamental technical specifications for hydro generators
* GB/T 10969-2008 Specification for Water Passage Components of Hydraulic Turbines, Storage Pumps and Pump-turbines
* GB/T 11805-2008 Basic specifications of automatic control components (devices) and their related system for hydroturbine-generating sets
* DL/T 622-2012 Technical specifications of elastic metal-plastic segment for thrust bearings of vertical-shaft hydrogenerators
* DL/T 5420-2009 Technological Guide for Stator Assembly in Site of Hydro-generators
* GB/T 14478-2012 Fundamental technical requirements for large and medium inlet valves of hydraulic turbine
*GB/T 9652.1-2019 Specification of hydraulic turbine governing systems
*GB/T 50700-2022 Standard for technical renovation of small hydropower station
*GB/T 15468-2020 Fundamental technical requirements for hydraulic turbines
Code of China
Standard
GB/T 8564-2003  Specification for Installation of Hydraulic Turbine Generator Uni (English Version)
Standard No.GB/T 8564-2003
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count40000 words
Price(USD)340.0
Implemented on1905-6-25
Deliveryvia email in 1 business day
Detail of GB/T 8564-2003
Standard No.
GB/T 8564-2003
English Name
Specification for Installation of Hydraulic Turbine Generator Uni
Chinese Name
水轮发电机组安装技术规范
Chinese Classification
F22
Professional Classification
GB
ICS Classification
Issued by
AQSIQ
Issued on
2003-09-15
Implemented on
1905-6-25
Status
superseded
Superseded by
GB/T 8564-2023 Technical specification for installation of hydraulic turbine-generator unit
Superseded on
2023-11-27
Abolished on
Superseding
GB 8564-1988 Specification for installation of hydraulic-turbine and generator units
Language
English
File Format
PDF
Word Count
40000 words
Price(USD)
340.0
Keywords
GB/T 8564-2003, GB 8564-2003, GBT 8564-2003, GB/T8564-2003, GB/T 8564, GB/T8564, GB8564-2003, GB 8564, GB8564, GBT8564-2003, GBT 8564, GBT8564
Introduction of GB/T 8564-2003
1 Scope This national standard specifies the installation, debugging of hydraulic turbine generator units and the requirements of test. It is applicable to the installation and/or acceptance of hydraulic turbine generator units in compliance with the following conditions: a) Unit capacity of 15MW and/or higher b) Impulse hydraulic turbine with its nominal diameter of runner at 1.5m and/or above c) Radial-axial flow turbine with its nominal diameter of runner at 2.0 m and/or above d) Axial flow, mixed flow variable pitch turbine, and tubular turbine, with nominal diameter of runner at 3.0m and/or above. Hydraulic turbine generator units with unit capacity smaller than 15MW and units with nominal diameter of turbine runner smaller than that specified in b), c), and d). This national standard is applicable to the installation and/or acceptance of reversible pump storage unit. 2 Normative references The following normative documents contain provisions, which, through reference in this text, constitute provisions of this national standard. For dated reference, subsequent amendments to, or revisions of, any of these publications do not apply. However, it is recommended parties reaching agreement according to this national standard carry out a study on if the most updated version of these documents may be applied or not . For undated reference, the latest edition of the normative document referred to applies. GB3323 Methods for radiographic inspection and classification of radiographs for fusion welded butt joints in steel GB/T7409.3 Excitation system for synchronous electrical machines-Technical requirements of excitation system for large and medium synchronous generators; GB/T7894 Fundamental technical requirements for hydraulic turbine generators; GB/T9652.1 Specifications of governors and Pressure oil supply units for hydraulic turbines; GB/T9652.2 Test acceptance codes of governors and pressure oil supply units for hydro-turbines; GB/T10969 Specifications for water passage components of hydraulic turbines; GB/T11120L-TSA Turbine Oil; GB11345 Method for manual ultrasonic testing and classification of testing results for ferritic steel welds; GB/T18482 Start - up test code for reversible pump - storage units; GB50150 Emending explanation of Standard for hand-over test of electric equipment electric equipment; GB50168 Code for construction and acceptance of cable levels electric equipment installation engineering; GB50171 Acceptance of switchboard outfit complete cubicle and secondary Circuit Electric Machine; DL/T507 Start-up test code for hydraulic-turbine and generator units; DL/T679 Code for welder technical qualification; DL/T827 Start-up test code for bulb tubular hydraulic-turbine and generator units; JB/T4709 Welding specification for steel pressure vessels; JB/T6204 Specification for withstand voltage test on stator coil and winding insulation of high voltage AC machines; JB/T8439Technical requirements on suppress corona of high-tension machines used in high altitude areas JB/T8660 Standard for hydroelectric set packing, transportation and preservation 3 General principles 3.1 Installation of hydraulic turbine generator unit shall proceed according to this national standard in compliance with the installation drawing approved by design organization and manufacturer as well as related technical documents. Special requirements raised by the manufacturer shall be satisfied according to related technical documents. Supplementary provisions for requirements not listed in this standard and technical documents of manufacturer shall be specified additionally. In case of a conflict between the technical requirements from the manufacturer and this standard, generally, the requirements of the manufacturer shall proceed. Otherwise, consult with the manufacturer for a settlement.
Contents of GB/T 8564-2003
1 Scope 2 Normative references 3 General principles 4 General regulations 5 Installation of vertical type reaction turbine 5.1 Installation of built-in fitting 5.2 Runner installation 5.3 Preassembling of the guide apparatus 5.4 Emplacement and installation of rotatable parts 5.5 Installation and adjustment of guide blade and/or servomotor 5.6 Installation of water conduit and main shaft seal 5.7 Installation of fittings 6 Installation of tubular turbine 6.1 Installation of built-in fitting 6.2 Installation of principal axes 6.3 Installation of guide apparatus 6.4 Installation of guide apparatus 6.5 Installation of the principal axes, runner and runner chamber 7 Installation of impulse turbine 7.1 Installation of diversion conduit 7.2 Installation of case 7.3 Installation of the bearing of turbine shaft 7.4 Installation of turbine shaft 7.5 Installation of sprayer and servomotor 7.6 Installation of runner 7.7 Installation and adjustment of control mechanism 8 Installation and debugging of speed regulating system 8.1 Installation and debugging of oil pressure devices 8.2 Installation of speed governor 8.3 Oil filling adjustment test of speed regulating system 8.4 Simulation test of speed regulating system 9 Installation of vertical type hydraulic turbine generator 9.1 Combination of framework 9.2 Grounding and scraping of bearing shell 9.3 Stator installation 9.4 Rotor installation 9.5 Overall installation 9.6 Installation of excitation system and devices 10 Installation of horizontal hydraulic generator 10.1 Grounding and scraping of bearing bush 10.2 Installation of bearing pedestal 10.3 Installation of stator, rotor and/or fitment 10.4 Checking of each part of the bearing and clearance adjustment 11 Installation of bulb-type hydraulic generator 11.1 Installation of stator 11.2 Installation of rotor 11.3 Installation of principal axes and composition bearing 11.4 Generator installation 12 Installation of tube and fitments 12.1 Fabrication of tube fittings and fitments of tube 12.2 Tube welding 12.3 Installation of tube 12.4 Treatment of the inner wall of tube 12.5 Test of the conduit and tube fittings 13 Installation of butterfly valve and ball valve 13.1 Installation of butterfly valve 13.2 Installation of ball valve 13.3 Installation of flexible connector 13.4 The installation of hydraulic control valve and air valve 13.5 Installation of operating mechanism 14 Electrical test of hydraulic turbine generator unit 15 Trial run of hydraulic turbine generator unit 15.1 General specifications 15.2 Water filling test of assembling unit 15.3 Zero load trial run of unit 15.3.1 Operational check of unit mechanism: 15.3.2 Adjustment and test of speed regulator: 15.4 Test over paralleling in of unit and under load Annex A Annex B Annex C Annex D Annex E Annex F Annex G
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 8564-2003, GB 8564-2003, GBT 8564-2003, GB/T8564-2003, GB/T 8564, GB/T8564, GB8564-2003, GB 8564, GB8564, GBT8564-2003, GBT 8564, GBT8564