2025-7-16 18.97.9.172
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/T/CECS 488-2017
T/CECS 488-2017   Rating standard for data centers (English Version)
Standard No.: T/CECS 488-2017 Status:valid remind me the status change

Email:

Language:English File Format:PDF
Word Count: 88500 words Price(USD):500.0 remind me the price change

Email:

Implemented on:2017-12-1 Delivery: via email in 1 business day
,,
Standard No.: T/CECS 488-2017
English Name: Rating standard for data centers
Chinese Name: 数据中心等级评定标准
Professional Classification: T/    Social Organization Standard
Issued by: CECS
Issued on: 2017-10-19
Implemented on: 2017-12-1
Status: valid
Language: English
File Format: PDF
Word Count: 88500 words
Price(USD): 500.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This standard is prepared with a view to standardize and unify the data center rating methods and improve the technical level of design, construction, operation and maintenance management. 1.0.2 This standard is applicable to the rating of data center design, construction, operation and maintenance management. 1.0.3 In addition to the requirements stipulated in this standard, those stipulated in the current relevant standards of the nation shall be complied with. 2 Terms 2.0.1 data center a building site that provides the operating environment to house centralized electronic information equipments, which can be a building or portion of a building, including computer room, auxiliary area, support area and the administrative area 2.0.2 infrastructure in data center, a collection of facilities that provide operation guarantee for the operation of electronic information equipments 2.0.3 redundancy duplicate configuration for some or whole components of the system, when the system fails, the redundant components involved in and assume the work of faulty parts, thereby prolonging the system mean time between failure (MTBF) 2.0.4 fault tolerant having two or more than two systems, at least one system is working at the same time.The facilities configured with fault tolerant can still meet basic requirements of normal operation while experiencing a serious incident or humans error in operation 2.0.5 operation and maintenance management daily operation and maintenance of data center infrastructure to ensure safe and stable operation of all infrastructure.Operation and maintenance management includes making operation and maintenance regulation, process and plan.Perform routine operations, response and handling of infrastructure failures, emergencies, etc 2.0.6 routine maintenance regular maintenance at a specific time, including daily routine maintenance and periods routine maintenance 2.0.7 preventive maintenance the various maintenance work aims at preventing failures before it occurred trough the routine inspection, detection, maintenance etc., to ensure the normal operation of all facilities of data center 2.0.8 capacity management according to the business development plan, the space, power, cooling and network capacity of the equipment of the data center are counted, evaluated and adjusted to meet the needs of the use of electronic information equipments 2.0.9 asset management establishing a unique identification for each asset in the data center to record the manufacturer, specification, model, date of installation, warranty period, usage, etc 2.0.10 power usage effectiveness (PUE) a metric to measure data center power usage efficiency, which is the ratio of total power consumed by all electrical equipments to the total power consumed by all electronic information equipments (IT equipments) 2.0.11 water usage effectiveness (WUE) a metric to measure data center water usage efficiency, which is the ratio of total water consumed by all devices to the total water consumed by all electronic information equipments (IT equipments) 2.0.12 design phase this period of data center project is from the conceptual design(preliminary design)to the final construction drawing design 2.0.13 construction and completion phase the period of data center project is from construction to completion 2.0.14 operation and maintenance phase after the completion of the data center project and put into normal production and operation stage. 3 Basic Requirements 3.0.1 Data center shall be categorized to three classes of A, B, C, and the classification principle shall be in accordance with the existing national standard GB50174 Code for Design of DataCenters. 3.0.2 Data center design phase rating not only shall be in accordance with the provisions of this standard, but also shall be complying with related provisions of the existing national standard GB50174 Code for Design of DataCenters. 3.0.3 Data center construction and acceptance phase rating not only shall be in accordance with the provisions of this standard, but also shall be complying with related provisions of the existing national standard GB50462 Code for Construction and Acceptance of Data CenterInfrastructure. 3.0.4 Data center operation and maintenance management phase rating not only shall be in accordance with the provisions of this standard, but also shall be complying with existing related standards. 3.0.5 Data center rating certification shall be valid for 3 years.
Referred in T/CECS 488-2017:
*GB/T 34857-2017 Bath agents and shower agents
*GB/T 13304.1-2008/XG1-2017 Steels classification - Part 1: Classification of according to chemical composition, includes Amendment 1
*GB/T 4336-2016/XG1-2017 Carbon and low-alloy steel―Determination of multi-element contents―Spark discharge atomic emission spectrometric method (routine method), includes Amendment 1
*GB 35114-2017 Technical requirements for information security of video surveillance network system for public security
*GB 20074-2017 External projections for motorcycles and mopeds
*GB/T 34882-2017 Induction hardening and tempering of iron and steel parts
*GB/T 7251.3-2017 Low-voltage switchgear and controlgear assemblies-Part 3:Distribution boards intended to be operated by ordinary persons ( DBO)
*GB/T 34955-2017 Atmospheric radiation effects-Guidelines for single event effects testing for avionics systems
*GB/T 34891-2017 Rolling bearings-Parts made from high-carbon chromium bearing steels- Specifications for heat treatment
*GB/T 20840.6-2017 Instrument transformers-Part 6:Additional general requirements for low-power instrument transformers
*GB/T 14048.5-2017 Low-voltage switchgear and controlgear-Part 5-1:Control circuit devices and switching element-Electromechanical control circuit devices
*GB/T 12665-2017 Requirements of damp-heat testing of electrical machine for service in general environmental condition
*GB/T 8372-2017 Toothpaste
*GB/T 2100-2017 Corrosion-resistanst steel castings for general applications
T/CECS 488-2017 is referred in:
*GB 11567-2017 Motor vehicles and trailers-lateral and rear underrun protection requirements
*GB/T 34904-2017 Spheroidal graphite iron castings-Ultrasonic testing
*GB/T 26684-2017 Methods of measurement for digital terrestrial set-top box
*CQC-C0301-2014 China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment
*CJ/T 157-2017 Hotplate of lacquered toughened glass for gas appliance
*JTG D81-2017 Design Specification for Highway Safety Facilities
Code of China
Standard
T/CECS 488-2017  Rating standard for data centers (English Version)
Standard No.T/CECS 488-2017
Statusvalid
LanguageEnglish
File FormatPDF
Word Count88500 words
Price(USD)500.0
Implemented on2017-12-1
Deliveryvia email in 1 business day
Detail of T/CECS 488-2017
Standard No.
T/CECS 488-2017
English Name
Rating standard for data centers
Chinese Name
数据中心等级评定标准
Chinese Classification
Professional Classification
T/
ICS Classification
Issued by
CECS
Issued on
2017-10-19
Implemented on
2017-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
88500 words
Price(USD)
500.0
Keywords
T/CECS 488-2017, T/CECST 488-2017, TCECST 488-2017, T/CECS488-2017, T/CECS 488, T/CECS488, T/CECST488-2017, T/CECST 488, T/CECST488, TCECST488-2017, TCECST 488, TCECST488
Introduction of T/CECS 488-2017
1 General Provisions 1.0.1 This standard is prepared with a view to standardize and unify the data center rating methods and improve the technical level of design, construction, operation and maintenance management. 1.0.2 This standard is applicable to the rating of data center design, construction, operation and maintenance management. 1.0.3 In addition to the requirements stipulated in this standard, those stipulated in the current relevant standards of the nation shall be complied with. 2 Terms 2.0.1 data center a building site that provides the operating environment to house centralized electronic information equipments, which can be a building or portion of a building, including computer room, auxiliary area, support area and the administrative area 2.0.2 infrastructure in data center, a collection of facilities that provide operation guarantee for the operation of electronic information equipments 2.0.3 redundancy duplicate configuration for some or whole components of the system, when the system fails, the redundant components involved in and assume the work of faulty parts, thereby prolonging the system mean time between failure (MTBF) 2.0.4 fault tolerant having two or more than two systems, at least one system is working at the same time.The facilities configured with fault tolerant can still meet basic requirements of normal operation while experiencing a serious incident or humans error in operation 2.0.5 operation and maintenance management daily operation and maintenance of data center infrastructure to ensure safe and stable operation of all infrastructure.Operation and maintenance management includes making operation and maintenance regulation, process and plan.Perform routine operations, response and handling of infrastructure failures, emergencies, etc 2.0.6 routine maintenance regular maintenance at a specific time, including daily routine maintenance and periods routine maintenance 2.0.7 preventive maintenance the various maintenance work aims at preventing failures before it occurred trough the routine inspection, detection, maintenance etc., to ensure the normal operation of all facilities of data center 2.0.8 capacity management according to the business development plan, the space, power, cooling and network capacity of the equipment of the data center are counted, evaluated and adjusted to meet the needs of the use of electronic information equipments 2.0.9 asset management establishing a unique identification for each asset in the data center to record the manufacturer, specification, model, date of installation, warranty period, usage, etc 2.0.10 power usage effectiveness (PUE) a metric to measure data center power usage efficiency, which is the ratio of total power consumed by all electrical equipments to the total power consumed by all electronic information equipments (IT equipments) 2.0.11 water usage effectiveness (WUE) a metric to measure data center water usage efficiency, which is the ratio of total water consumed by all devices to the total water consumed by all electronic information equipments (IT equipments) 2.0.12 design phase this period of data center project is from the conceptual design(preliminary design)to the final construction drawing design 2.0.13 construction and completion phase the period of data center project is from construction to completion 2.0.14 operation and maintenance phase after the completion of the data center project and put into normal production and operation stage. 3 Basic Requirements 3.0.1 Data center shall be categorized to three classes of A, B, C, and the classification principle shall be in accordance with the existing national standard GB50174 Code for Design of DataCenters. 3.0.2 Data center design phase rating not only shall be in accordance with the provisions of this standard, but also shall be complying with related provisions of the existing national standard GB50174 Code for Design of DataCenters. 3.0.3 Data center construction and acceptance phase rating not only shall be in accordance with the provisions of this standard, but also shall be complying with related provisions of the existing national standard GB50462 Code for Construction and Acceptance of Data CenterInfrastructure. 3.0.4 Data center operation and maintenance management phase rating not only shall be in accordance with the provisions of this standard, but also shall be complying with existing related standards. 3.0.5 Data center rating certification shall be valid for 3 years.
Contents of T/CECS 488-2017
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
T/CECS 488-2017, T/CECST 488-2017, TCECST 488-2017, T/CECS488-2017, T/CECS 488, T/CECS488, T/CECST488-2017, T/CECST 488, T/CECST488, TCECST488-2017, TCECST 488, TCECST488