Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative.
In October 2014, the Special Equipment Safety Supervision Bureau (hereinafter referred to as "the SESSB") of the former General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China (hereinafter referred to as “the former AQSIQ”) issued the revision assignment of Pressure pipe installation supervision inspection regulation (hereinafter referred to as the Installation supervision inspection regulation).
In April 2015, China Special Equipment Inspection and Research Institute organized relevant experts to set up a drafting group and held the first meeting in Guangzhou to discuss the principles, key contents and main problems to be solved in the revision of the Installation supervision inspection regulation, and to make specific arrangement for the revision work and formulate the revision work schedule.
In November 2015, the drafting group held the second meeting in Beijing to discuss and revise the draft, and an exposure draft was formulated. In April 2016, the SESSB issued ZHIJIANTEHAN [2016] No.13 to solicit opinions from basic-level departments, organizations concerned, experts and the public. In August 2016, the drafting group held the third meeting in Beijing to study and discuss the opinions received, and the draft for review is formulated through revision.
In May 2017, the SESSB submitted the draft for review to the Special Equipment Safety and Energy Saving Technical Committee of the former AQSIQ for review, and then the draft for approval is formulated by the drafting group through revision based on the review opinions.
With the transformation of government functions and the advancement of administrative licensing reform, the drafting group added the relevant contents on pressure pipe unit manufacture supervision inspection as required by the SESSB in the Regulation so as to coordinate with the Announcement of the State Administration for Market Regulation on matters related to administrative licensing of special equipment [2019] No.3 and the Regulation for production and filling licensing of special equipment (TSG 07-2019). In April 2019, the fourth meeting was held to discuss the relevant contents on pressure pipe unit manufacture supervision inspection added in the Regulation, and the Pressure pipe supervision inspection regulation (TSG D7006-2020) (hereinafter referred to as the Supervision inspection regulation) was formulated as a draft for approval after revision.
On May 16, 2020, the Regulation was approved and issued by the State Administration for Market Regulation.
The basic principles of this revision are as follows:
1. the current Rule on safety, quality supervision and inspection for pressure piping installation (GUOZHIJIANGUO [2002], No.83) is revised as the Safety technical regulations for special equipment in order to coordinate with Special equipment safety law of the People's Republic of China and Special equipment catalog;
2. the relevant contents are adjusted and improved to clarify the nature and positioning of pressure pipe unit manufacture supervision inspection, and pressure pipe installation, alteration and major repair supervision inspection according to the implementation of Pressure pipe unit manufacture supervision inspection regulation (submerged-arc welding steel pipe and polyethylene pipe) (TSG D7001-2005) and Rule on safety, quality supervision and inspection for pressure piping installation (GUOZHIJIANGUO [2002], No.83) as well as the industry development;
3. the Supervision inspection regulation is revised based on the requirements for safety management of special equipment, in line with the concept of serving enterprise development, and in combination with the reform of safety supervision management of special equipment in China in recent years and the advanced international safety management experience;
4. the obligations and responsibilities of all organizations, institutions and personnel concerned in the supervision inspection, as well as the supervision inspection procedures, contents and requirements are standardized;
5. the pertinence, effectiveness and scientificity of supervision inspection items are highlighted, and the special supervision inspection requirements for pressure pipe units, long-distance pipes, utility pipes and industrial pipes are proposed.
Pressure pipe supervision inspection regulation
1 General provisions
1.1 Purpose
The Regulation is formulated based on Special equipment safety law of the People's Republic of China and Regulations on safety supervision of special equipment to regulate the pressure pipe unit manufacture supervision inspection as well as the installation, alteration and major repair (hereinafter referred to as “construction”) supervision inspection of pressure pipes.
1.2 Application scope
1.2.1 Manufacture supervision inspection
The Regulation is applicable to the supervision inspection of the manufacture process for the following pressure pipe units within the scope specified in Special equipment catalog:
(1) submerged-arc welding steel pipe and polyethylene pipe (Note 1-1);
(2) gas pressure regulating device, temperature and pressure reducing device, industrialized prefabricated pipe section (Note 1-2) and flowmeter (shell) (Note 1-3) in unit assembly device.
Note 1-1: polyethylene pipes and fiber-reinforced polyethylene pipes with metal skeleton are not included.
Note 1-2: industrialized prefabricated pipe sections refer to the pipe unit products that are welded and assembled by the manufacturer in the factory according to the construction design drawing and then leave the factory as a whole, including manifold, pig receiver and launcher, dirt separator, mixer, buffer, condenser cylinder, filter, separator, etc. that are not covered in the management of pressure vessel, excluding pipe prefabrication carried out by the installation organization on construction site.
Note 1-3: the temperature and pressure reducing device, industrialized prefabricated pipe section and flowmeter (shell) used for the boiler pipes may be subjected to manufacture supervision inspection according to relevant requirements for boilers.
1.2.2 Construction supervision inspection
The Regulation is applicable to the supervision inspection of the following construction processes for the pressure pipes (long-distance pipes, utility pipes and industrial pipes) within the scope specified in Special equipment catalog:
(1) installation process;
(2) alteration or major repair (except for the construction process for pipes under emergency repair) (Note 1-4), and the process of replacing the pipes with the same medium with an overall length greater than 100m.
Note 1-4: pressure pipe alteration refers to the activity that results in changes in pipe performance parameters or pipe structure by changing the pipe specification, material, structural arrangement or the working parameters such as pipe medium, pressure and temperature.
Major repair of pressure pipe refers to the replacement of pipe sections and valves by welding, pipe straightening, repair welding of pressure components, sealing under pressure and blocking under pressure.
1.3 Basic requirements
Pressure pipe supervision inspection refers to the supervision of pressure pipe unit manufacture or pressure pipe construction [hereinafter referred to as “manufacture (construction)”] process and conformance verification meeting the basis safety requirements implemented by the inspection organization undertaking supervision inspection (hereinafter referred to as the “supervision inspection organization”) on the basis of qualified self-inspection of the inspected organization according to the Regulation. The supervision inspection cannot be used for replacing the self-inspection of the inspected organization.
The pressure pipe units and pressure pipes, which fail to be subjected to supervision inspection or are rejected in supervision inspection, shall not be put into use.
1.4 Inspected organizations
Inspected organizations refer to those of which the work quality directly affects the safety performance of pressure pipes in the manufacture (construction) process, including pressure pipe unit manufacturer, pressure pipe development organization (or its entrusting organization, the same below), design organization, construction organization, non-destructive testing organization, etc.
The inspected organizations shall carry out the following preparations:
(1) the pressure pipe unit manufacturer, design organization, construction organization and non-destructive testing organization shall establish a quality assurance system and maintain effective implementation;
(2) shall provide necessary working conditions, determine the supervision inspection contact responsible personnel, and coordinate with the supervision inspection;
(3) prior to product manufacture, the pressure pipe unit manufacturer shall file an application for supervision inspection to the supervision inspection organization, submit the production plan, and provide real and valid inspected data in a timely manner (Note 1-5);
(4) the development organization shall be responsible for coordinating the implementation of supervision inspection, filing an application for supervision inspection to the supervision inspection organization or requiring the construction organization to file an application for supervision inspection, and timely coordinating and solving problems related to construction and supervision inspection;
(5) the construction organization shall assist the development organization or file an application for supervision inspection to the supervision inspection organization as required by development organization, and submit the construction schedule;
(6) the construction organization and non-destructive testing organization shall timely inform the supervision inspection organization of the construction and testing progress, and provide authentic and valid inspected data (Note 1-5).
Note 1-5: inspected data refers to the technical data, inspection records, inspection and testing records, test and testing reports, qualification lists of welding personnel and non-destructive testing personnel related to the inspected products and construction items.
1.5 Supervision inspection organization and personnel
(1) the supervision inspection organization undertaking manufacture (construction) supervision inspection shall obtain the corresponding qualifications approved by the department responsible for the safety supervision management of special equipment (hereinafter referred to as the “special equipment safety supervision management department”), and the inspection personnel undertaking supervision inspection (hereinafter referred to as the “supervision inspection personnel”) shall be provided with the corresponding qualifications;
(2) the supervision inspection organization shall provide the inspected organization with the supervision inspection outline (scheme) and the qualification of the supervision inspection personnel, and publicize the names of the supervision inspection organization and the supervision inspection personnel at the manufacture and construction sites; the supervision inspection outline (scheme) includes supervision inspection items, supervision inspection contents and requirements;
(3) if the inspected organization violates the relevant laws, regulations and the Regulation and fails to reply to the supervision inspection opinions within the prescribed time limit, the supervision inspection organization may suspend its supervision inspection and report to the relevant departments according to the provisions of 2.3;
(4) the supervision inspection personnel shall abide by the safety operation management regulations of the inspected organization;
(5) the supervision inspection personnel shall inspect and confirm the on-site preparations of the inspected organization according to the production plan, construction progress or testing progress proposed by the inspected organization, and shall be present in time for supervision inspection;
(6) the supervision inspection personnel shall properly keep the inspected data provided by the inspected organization;
(7) the supervision inspection organization and personnel shall keep confidential the inspected data provided by the inspected organization according to the agreement.
1.6 Management requirements
The pressure pipe unit manufacturer, development organization, design organization, construction organization, non-destructive testing organization and supervision inspection organization shall strictly implement the Regulation, and timely input the required data into the special equipment information management system according to the provisions specified in the information management of special equipment safety technical specification.
2 General requirements
2.1 Supervision inspection procedures
Supervision inspection procedures generally include acceptance of applications, preparation for supervision inspection, implementation of supervision inspection, issuance of supervision inspection certificates, etc.
2.1.1 Acceptance of applications
The pressure pipe unit manufacturer and development organization (or construction organization) shall file an application for pressure pipe supervision inspection to the supervision inspection organization prior to manufacture or construction.
After accepting the application for supervision inspection, the supervision inspection organization shall check the relevant data submitted, and sign a supervision inspection agreement with the applicant to clarify the obligations, rights and responsibilities of both parties.
2.1.2 Preparation for supervision inspection
The supervision inspection organization shall formulate the supervision inspection outline (scheme) according to the Regulation and quality plan (construction organization design) in combination with the actual situation of manufacture (construction), form a supervision inspection project team, designate the project leader of the supervision inspection, allocate necessary supervision inspection personnel, and configure testing instruments, etc.
2.1.3 Implementation of supervision inspection
The supervision inspection organization shall inform the inspected organization in writing of the supervision inspection items, contents and requirements according to 2.2, Special requirements for pressure pipe unit manufacture supervision inspection (see Annex A), Special requirements for long-distance pipe construction supervision inspection (see Annex B), Special requirements for utility pipe construction supervision inspection (see Annex C) and Special requirements for industrial pipe construction supervision inspection (see Annex D), in combination with the technical characteristics and actual conditions of pressure pipes. For long-distance pipes, the supervision inspection organization shall disclose the supervision inspection scheme to the inspected organization at the meeting.
During the supervision inspection, the supervision inspection personnel shall perform supervision inspection according to the supervision inspection outline (scheme). The supervision inspection personnel may perform supervision inspection for the supervision inspection items according to safety technical specifications, relevant standards and design documents through data review, physical inspection and on-site supervision, and come to supervision inspection conclusions.
2.1.4 Issuance of supervision inspection certificates
On completion of the supervision inspection, if all the conclusions of supervision inspection items meet the requirements of the Regulation, the supervision inspection organization shall issue the “special equipment supervision inspection certificate” (hereinafter referred to as the “supervision inspection certificate”, see Annex E) within the time limit specified in the supervision inspection agreement. As for pressure pipe construction supervision inspection, the supervision inspection certificate shall also be attached with a pressure pipe data sheet (see Attached table e) and a pressure pipe supervision inspection report (hereinafter referred to as the “supervision inspection report”).
As for pressure pipe construction supervision inspection, the supervision inspection personnel may issue the Notice for supervision inspection opinions on special equipment (1) [hereinafter referred to as the “supervision inspection opinions (1)”, see Annex F] before the supervision inspection certificate and the supervision inspection report are issued, and notify the development organization and the construction organization in writing of the preliminary conclusion of supervision inspection.
2.2 Contents and methods of supervision inspection
2.2.1 Contents of supervision inspection
(1) Conformance verification on the pressure pipe unit manufacture process, the pressure pipe construction process and whether the results meet the requirements of the safety technical specifications through the supervision inspection of the processes that have an impact on the safety performance of pressure pipes;
(2) Evaluation on the implementation of quality assurance system of the manufacturer (construction organization).
2.2.2 Methods of supervision inspection
In general, the methods such as data review, physical inspection and on-site supervision are adopted for supervision inspection, and the specific requirements are as follows:
(1) for data review, the supervision inspection personnel shall, in accordance with the items and requirements specified in the Regulation, review the inspected data provided by the inspected organization, including whether the contents meet the requirements of safety technical specifications and relevant standards;
(2) for physical inspection, the supervision inspection personnel shall, in accordance with the items and requirements specified in the Regulation, re-inspect the acceptable self-inspection items of the inspected organization to verify whether the results are true and correct, and whether such results meet the requirements of safety technical specifications and relevant standards;
(3) for on-site supervision, the supervision inspection personnel shall, in accordance with the items and requirements specified in the Regulation, supervise the manufacture (construction) activities on site, including whether such activities meet the requirements of safety technical specifications, relevant standards and quality assurance system documents.
If the quantity for random inspection is definitely specified in the Regulation, such provisions shall apply. If no definite provision is available, the quantity and method for random inspection shall be definitely specified in the supervision inspection outline (scheme) according to the implementation of quality assurance system of the inspected organization and the types of items for random inspection.
The supervision inspection shall be recorded in a true, accurate and traceable way (including relevant meeting minutes, etc.).
2.2.3 Classification of supervision inspection items
Supervision inspection items are classified into Classes A, B and C, with the following requirements:
(1) Class A refers to the key item that has a significant impact on the safety performance of pressure pipes. When such item points are reached during manufacture (construction), the inspected organization shall notify the supervision inspection personnel to arrive at the site in advance, and the supervision inspection personnel shall supervise the implementation of the item on site. The manufacture (construction) may not be continued unless the results are confirmed as acceptable and signed by the supervision inspection personnel on site;
(2) Class B refers to the key item that has a great impact on the safety performance of pressure pipes. The supervision inspection personnel generally carry out on-site supervision or physical inspection. If they fail to arrive at the site in time, the inspected organization may continue the manufacture (construction) of such item after passing the self-inspection; the supervision inspection personnel then carry out on-site inspection on the manufacture (construction) results to confirm whether such item meets the requirements;
(3) Class C refers to the inspection item that has an impact on the safety performance of pressure pipes. The supervision inspection personnel confirm whether the item meets the requirements by reviewing the relevant self-inspection reports and records of the inspected organization;
(4) where the supervision inspection items may be set as Class C/B, the supervision inspection personnel may choose Class C. Where on-site inspection is required according to other relevant provisions of the Regulation or relevant standards and design documents, the supervision inspection personnel shall choose Class B.
For any common problem about manufacture (construction) quality found in the process of supervision inspection, the class of supervision inspection items may be adjusted based on the actual working conditions and where the supervision inspection organization deems it necessary, and after adjustment the class shall be higher than the original one.
2.2.4 Supervision inspection requirements
The supervision inspection items, methods and requirements for pressure pipe unit manufacture as well as long-distance pipe, utility pipe and industrial pipe construction shall meet the requirements of Annexes A~D. The evaluation on the implementation of quality assurance system of the manufacturer (construction organization) shall meet the requirements of Evaluation on the implementation of quality assurance system (see Annex G).
2.3 Solving of problems found in supervision inspection
In case of any serious problems (Note 2-1) in the supervision inspection process and if the qualifications of the welding personnel and non-destructive testing personnel operating on site fail to meet the requirements, the supervision inspection personnel shall report to the supervision inspection organization in time, and the supervision inspection organization shall issue the Notice for supervision inspection opinions on special equipment (2) [hereinafter referred to as the “supervision inspection opinions (2)”, see Annex F] to the inspected organization. For the pressure pipe construction supervision inspection, it shall also report to the special equipment safety supervision department, and inform the development organization in writing.
In case of any general problems (Note 2-2) in the supervision inspection process, the supervision inspection personnel shall issue the Contact list for special equipment supervision inspection (hereinafter referred to as the "contact list for supervision inspection", see Annex H) to the inspected organization in time, so as to require the inspected organization to rectify the problems raised. The supervision inspection personnel shall track and confirm the rectification.
Note 2-1: serious problems refer to rejected and uncorrectable supervision inspection items; serious out-of-control of the implementation of quality assurance system of the inspected organization; refusing to rectify the problems raised in the contact list for supervision inspection; failing to be provided with corresponding license conditions any longer for those who have the license qualification requirements; serious violation of special equipment licensing system (such as altering, forging, transferring or selling special equipment license, selling or illegally providing quality certificates to the organizations without special equipment license).
Note 2-2: general problems refer to the problems affecting the safety performance of pressure pipe unit or pressure pipes and the implementation of quality assurance system except the serious problems listed in Note 2-1.
Upon receiving the supervision inspection opinions (2) or the contact list for supervision inspection, the inspected organization shall take effective rectification measures and rectify the problems listed thereof within the prescribed time limit. On completion of the rectification, the relevant witness data shall be submitted to the supervision inspection organization. After receiving the witness data for rectification from the inspected organization, the supervision inspection personnel shall review and confirm such data.
In case of any doubts about the testing results provided by the inspected organization or non-conformance of testing items to the safety technical specifications, the supervision inspection personnel shall require the inspected organization to carry out re-inspection or supplementary tests.
If the supervision inspection organization finds that the inspected organization has violated regulations and refuses to correct, issues false reports or provides false documents, it shall timely report to the place of manufacture for pressure pipe unit or the special equipment safety supervision department receiving the notification of pressure pipe construction, as well as the issuing authority for design license, manufacture license, installation license or non-destructive testing qualification; it shall also inform the development organization in writing during pressure pipe construction supervision inspection.
Foreword i 1 General provisions 2 General requirements 3 Supplementary provisions Annex A Special requirements for pressure pipe unit manufacture supervision inspection Annex B Special requirements for long-distance pipe construction supervision inspection Annex C Special requirements for utility pipe construction supervision inspection Annex D Special requirements for industrial pipe construction supervision inspection Annex E Special equipment supervision inspection certificate (manufacturing of pressure pipe units) Attached table e Pressure pipe data sheet Annex F Notice for supervision inspection opinions on special equipment (1) Annex G Evaluation on the implementation of quality assurance system Annex H Contact list for special equipment supervision inspection
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative.
In October 2014, the Special Equipment Safety Supervision Bureau (hereinafter referred to as "the SESSB") of the former General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China (hereinafter referred to as “the former AQSIQ”) issued the revision assignment of Pressure pipe installation supervision inspection regulation (hereinafter referred to as the Installation supervision inspection regulation).
In April 2015, China Special Equipment Inspection and Research Institute organized relevant experts to set up a drafting group and held the first meeting in Guangzhou to discuss the principles, key contents and main problems to be solved in the revision of the Installation supervision inspection regulation, and to make specific arrangement for the revision work and formulate the revision work schedule.
In November 2015, the drafting group held the second meeting in Beijing to discuss and revise the draft, and an exposure draft was formulated. In April 2016, the SESSB issued ZHIJIANTEHAN [2016] No.13 to solicit opinions from basic-level departments, organizations concerned, experts and the public. In August 2016, the drafting group held the third meeting in Beijing to study and discuss the opinions received, and the draft for review is formulated through revision.
In May 2017, the SESSB submitted the draft for review to the Special Equipment Safety and Energy Saving Technical Committee of the former AQSIQ for review, and then the draft for approval is formulated by the drafting group through revision based on the review opinions.
With the transformation of government functions and the advancement of administrative licensing reform, the drafting group added the relevant contents on pressure pipe unit manufacture supervision inspection as required by the SESSB in the Regulation so as to coordinate with the Announcement of the State Administration for Market Regulation on matters related to administrative licensing of special equipment [2019] No.3 and the Regulation for production and filling licensing of special equipment (TSG 07-2019). In April 2019, the fourth meeting was held to discuss the relevant contents on pressure pipe unit manufacture supervision inspection added in the Regulation, and the Pressure pipe supervision inspection regulation (TSG D7006-2020) (hereinafter referred to as the Supervision inspection regulation) was formulated as a draft for approval after revision.
On May 16, 2020, the Regulation was approved and issued by the State Administration for Market Regulation.
The basic principles of this revision are as follows:
1. the current Rule on safety, quality supervision and inspection for pressure piping installation (GUOZHIJIANGUO [2002], No.83) is revised as the Safety technical regulations for special equipment in order to coordinate with Special equipment safety law of the People's Republic of China and Special equipment catalog;
2. the relevant contents are adjusted and improved to clarify the nature and positioning of pressure pipe unit manufacture supervision inspection, and pressure pipe installation, alteration and major repair supervision inspection according to the implementation of Pressure pipe unit manufacture supervision inspection regulation (submerged-arc welding steel pipe and polyethylene pipe) (TSG D7001-2005) and Rule on safety, quality supervision and inspection for pressure piping installation (GUOZHIJIANGUO [2002], No.83) as well as the industry development;
3. the Supervision inspection regulation is revised based on the requirements for safety management of special equipment, in line with the concept of serving enterprise development, and in combination with the reform of safety supervision management of special equipment in China in recent years and the advanced international safety management experience;
4. the obligations and responsibilities of all organizations, institutions and personnel concerned in the supervision inspection, as well as the supervision inspection procedures, contents and requirements are standardized;
5. the pertinence, effectiveness and scientificity of supervision inspection items are highlighted, and the special supervision inspection requirements for pressure pipe units, long-distance pipes, utility pipes and industrial pipes are proposed.
Pressure pipe supervision inspection regulation
1 General provisions
1.1 Purpose
The Regulation is formulated based on Special equipment safety law of the People's Republic of China and Regulations on safety supervision of special equipment to regulate the pressure pipe unit manufacture supervision inspection as well as the installation, alteration and major repair (hereinafter referred to as “construction”) supervision inspection of pressure pipes.
1.2 Application scope
1.2.1 Manufacture supervision inspection
The Regulation is applicable to the supervision inspection of the manufacture process for the following pressure pipe units within the scope specified in Special equipment catalog:
(1) submerged-arc welding steel pipe and polyethylene pipe (Note 1-1);
(2) gas pressure regulating device, temperature and pressure reducing device, industrialized prefabricated pipe section (Note 1-2) and flowmeter (shell) (Note 1-3) in unit assembly device.
Note 1-1: polyethylene pipes and fiber-reinforced polyethylene pipes with metal skeleton are not included.
Note 1-2: industrialized prefabricated pipe sections refer to the pipe unit products that are welded and assembled by the manufacturer in the factory according to the construction design drawing and then leave the factory as a whole, including manifold, pig receiver and launcher, dirt separator, mixer, buffer, condenser cylinder, filter, separator, etc. that are not covered in the management of pressure vessel, excluding pipe prefabrication carried out by the installation organization on construction site.
Note 1-3: the temperature and pressure reducing device, industrialized prefabricated pipe section and flowmeter (shell) used for the boiler pipes may be subjected to manufacture supervision inspection according to relevant requirements for boilers.
1.2.2 Construction supervision inspection
The Regulation is applicable to the supervision inspection of the following construction processes for the pressure pipes (long-distance pipes, utility pipes and industrial pipes) within the scope specified in Special equipment catalog:
(1) installation process;
(2) alteration or major repair (except for the construction process for pipes under emergency repair) (Note 1-4), and the process of replacing the pipes with the same medium with an overall length greater than 100m.
Note 1-4: pressure pipe alteration refers to the activity that results in changes in pipe performance parameters or pipe structure by changing the pipe specification, material, structural arrangement or the working parameters such as pipe medium, pressure and temperature.
Major repair of pressure pipe refers to the replacement of pipe sections and valves by welding, pipe straightening, repair welding of pressure components, sealing under pressure and blocking under pressure.
1.3 Basic requirements
Pressure pipe supervision inspection refers to the supervision of pressure pipe unit manufacture or pressure pipe construction [hereinafter referred to as “manufacture (construction)”] process and conformance verification meeting the basis safety requirements implemented by the inspection organization undertaking supervision inspection (hereinafter referred to as the “supervision inspection organization”) on the basis of qualified self-inspection of the inspected organization according to the Regulation. The supervision inspection cannot be used for replacing the self-inspection of the inspected organization.
The pressure pipe units and pressure pipes, which fail to be subjected to supervision inspection or are rejected in supervision inspection, shall not be put into use.
1.4 Inspected organizations
Inspected organizations refer to those of which the work quality directly affects the safety performance of pressure pipes in the manufacture (construction) process, including pressure pipe unit manufacturer, pressure pipe development organization (or its entrusting organization, the same below), design organization, construction organization, non-destructive testing organization, etc.
The inspected organizations shall carry out the following preparations:
(1) the pressure pipe unit manufacturer, design organization, construction organization and non-destructive testing organization shall establish a quality assurance system and maintain effective implementation;
(2) shall provide necessary working conditions, determine the supervision inspection contact responsible personnel, and coordinate with the supervision inspection;
(3) prior to product manufacture, the pressure pipe unit manufacturer shall file an application for supervision inspection to the supervision inspection organization, submit the production plan, and provide real and valid inspected data in a timely manner (Note 1-5);
(4) the development organization shall be responsible for coordinating the implementation of supervision inspection, filing an application for supervision inspection to the supervision inspection organization or requiring the construction organization to file an application for supervision inspection, and timely coordinating and solving problems related to construction and supervision inspection;
(5) the construction organization shall assist the development organization or file an application for supervision inspection to the supervision inspection organization as required by development organization, and submit the construction schedule;
(6) the construction organization and non-destructive testing organization shall timely inform the supervision inspection organization of the construction and testing progress, and provide authentic and valid inspected data (Note 1-5).
Note 1-5: inspected data refers to the technical data, inspection records, inspection and testing records, test and testing reports, qualification lists of welding personnel and non-destructive testing personnel related to the inspected products and construction items.
1.5 Supervision inspection organization and personnel
(1) the supervision inspection organization undertaking manufacture (construction) supervision inspection shall obtain the corresponding qualifications approved by the department responsible for the safety supervision management of special equipment (hereinafter referred to as the “special equipment safety supervision management department”), and the inspection personnel undertaking supervision inspection (hereinafter referred to as the “supervision inspection personnel”) shall be provided with the corresponding qualifications;
(2) the supervision inspection organization shall provide the inspected organization with the supervision inspection outline (scheme) and the qualification of the supervision inspection personnel, and publicize the names of the supervision inspection organization and the supervision inspection personnel at the manufacture and construction sites; the supervision inspection outline (scheme) includes supervision inspection items, supervision inspection contents and requirements;
(3) if the inspected organization violates the relevant laws, regulations and the Regulation and fails to reply to the supervision inspection opinions within the prescribed time limit, the supervision inspection organization may suspend its supervision inspection and report to the relevant departments according to the provisions of 2.3;
(4) the supervision inspection personnel shall abide by the safety operation management regulations of the inspected organization;
(5) the supervision inspection personnel shall inspect and confirm the on-site preparations of the inspected organization according to the production plan, construction progress or testing progress proposed by the inspected organization, and shall be present in time for supervision inspection;
(6) the supervision inspection personnel shall properly keep the inspected data provided by the inspected organization;
(7) the supervision inspection organization and personnel shall keep confidential the inspected data provided by the inspected organization according to the agreement.
1.6 Management requirements
The pressure pipe unit manufacturer, development organization, design organization, construction organization, non-destructive testing organization and supervision inspection organization shall strictly implement the Regulation, and timely input the required data into the special equipment information management system according to the provisions specified in the information management of special equipment safety technical specification.
2 General requirements
2.1 Supervision inspection procedures
Supervision inspection procedures generally include acceptance of applications, preparation for supervision inspection, implementation of supervision inspection, issuance of supervision inspection certificates, etc.
2.1.1 Acceptance of applications
The pressure pipe unit manufacturer and development organization (or construction organization) shall file an application for pressure pipe supervision inspection to the supervision inspection organization prior to manufacture or construction.
After accepting the application for supervision inspection, the supervision inspection organization shall check the relevant data submitted, and sign a supervision inspection agreement with the applicant to clarify the obligations, rights and responsibilities of both parties.
2.1.2 Preparation for supervision inspection
The supervision inspection organization shall formulate the supervision inspection outline (scheme) according to the Regulation and quality plan (construction organization design) in combination with the actual situation of manufacture (construction), form a supervision inspection project team, designate the project leader of the supervision inspection, allocate necessary supervision inspection personnel, and configure testing instruments, etc.
2.1.3 Implementation of supervision inspection
The supervision inspection organization shall inform the inspected organization in writing of the supervision inspection items, contents and requirements according to 2.2, Special requirements for pressure pipe unit manufacture supervision inspection (see Annex A), Special requirements for long-distance pipe construction supervision inspection (see Annex B), Special requirements for utility pipe construction supervision inspection (see Annex C) and Special requirements for industrial pipe construction supervision inspection (see Annex D), in combination with the technical characteristics and actual conditions of pressure pipes. For long-distance pipes, the supervision inspection organization shall disclose the supervision inspection scheme to the inspected organization at the meeting.
During the supervision inspection, the supervision inspection personnel shall perform supervision inspection according to the supervision inspection outline (scheme). The supervision inspection personnel may perform supervision inspection for the supervision inspection items according to safety technical specifications, relevant standards and design documents through data review, physical inspection and on-site supervision, and come to supervision inspection conclusions.
2.1.4 Issuance of supervision inspection certificates
On completion of the supervision inspection, if all the conclusions of supervision inspection items meet the requirements of the Regulation, the supervision inspection organization shall issue the “special equipment supervision inspection certificate” (hereinafter referred to as the “supervision inspection certificate”, see Annex E) within the time limit specified in the supervision inspection agreement. As for pressure pipe construction supervision inspection, the supervision inspection certificate shall also be attached with a pressure pipe data sheet (see Attached table e) and a pressure pipe supervision inspection report (hereinafter referred to as the “supervision inspection report”).
As for pressure pipe construction supervision inspection, the supervision inspection personnel may issue the Notice for supervision inspection opinions on special equipment (1) [hereinafter referred to as the “supervision inspection opinions (1)”, see Annex F] before the supervision inspection certificate and the supervision inspection report are issued, and notify the development organization and the construction organization in writing of the preliminary conclusion of supervision inspection.
2.2 Contents and methods of supervision inspection
2.2.1 Contents of supervision inspection
(1) Conformance verification on the pressure pipe unit manufacture process, the pressure pipe construction process and whether the results meet the requirements of the safety technical specifications through the supervision inspection of the processes that have an impact on the safety performance of pressure pipes;
(2) Evaluation on the implementation of quality assurance system of the manufacturer (construction organization).
2.2.2 Methods of supervision inspection
In general, the methods such as data review, physical inspection and on-site supervision are adopted for supervision inspection, and the specific requirements are as follows:
(1) for data review, the supervision inspection personnel shall, in accordance with the items and requirements specified in the Regulation, review the inspected data provided by the inspected organization, including whether the contents meet the requirements of safety technical specifications and relevant standards;
(2) for physical inspection, the supervision inspection personnel shall, in accordance with the items and requirements specified in the Regulation, re-inspect the acceptable self-inspection items of the inspected organization to verify whether the results are true and correct, and whether such results meet the requirements of safety technical specifications and relevant standards;
(3) for on-site supervision, the supervision inspection personnel shall, in accordance with the items and requirements specified in the Regulation, supervise the manufacture (construction) activities on site, including whether such activities meet the requirements of safety technical specifications, relevant standards and quality assurance system documents.
If the quantity for random inspection is definitely specified in the Regulation, such provisions shall apply. If no definite provision is available, the quantity and method for random inspection shall be definitely specified in the supervision inspection outline (scheme) according to the implementation of quality assurance system of the inspected organization and the types of items for random inspection.
The supervision inspection shall be recorded in a true, accurate and traceable way (including relevant meeting minutes, etc.).
2.2.3 Classification of supervision inspection items
Supervision inspection items are classified into Classes A, B and C, with the following requirements:
(1) Class A refers to the key item that has a significant impact on the safety performance of pressure pipes. When such item points are reached during manufacture (construction), the inspected organization shall notify the supervision inspection personnel to arrive at the site in advance, and the supervision inspection personnel shall supervise the implementation of the item on site. The manufacture (construction) may not be continued unless the results are confirmed as acceptable and signed by the supervision inspection personnel on site;
(2) Class B refers to the key item that has a great impact on the safety performance of pressure pipes. The supervision inspection personnel generally carry out on-site supervision or physical inspection. If they fail to arrive at the site in time, the inspected organization may continue the manufacture (construction) of such item after passing the self-inspection; the supervision inspection personnel then carry out on-site inspection on the manufacture (construction) results to confirm whether such item meets the requirements;
(3) Class C refers to the inspection item that has an impact on the safety performance of pressure pipes. The supervision inspection personnel confirm whether the item meets the requirements by reviewing the relevant self-inspection reports and records of the inspected organization;
(4) where the supervision inspection items may be set as Class C/B, the supervision inspection personnel may choose Class C. Where on-site inspection is required according to other relevant provisions of the Regulation or relevant standards and design documents, the supervision inspection personnel shall choose Class B.
For any common problem about manufacture (construction) quality found in the process of supervision inspection, the class of supervision inspection items may be adjusted based on the actual working conditions and where the supervision inspection organization deems it necessary, and after adjustment the class shall be higher than the original one.
2.2.4 Supervision inspection requirements
The supervision inspection items, methods and requirements for pressure pipe unit manufacture as well as long-distance pipe, utility pipe and industrial pipe construction shall meet the requirements of Annexes A~D. The evaluation on the implementation of quality assurance system of the manufacturer (construction organization) shall meet the requirements of Evaluation on the implementation of quality assurance system (see Annex G).
2.3 Solving of problems found in supervision inspection
In case of any serious problems (Note 2-1) in the supervision inspection process and if the qualifications of the welding personnel and non-destructive testing personnel operating on site fail to meet the requirements, the supervision inspection personnel shall report to the supervision inspection organization in time, and the supervision inspection organization shall issue the Notice for supervision inspection opinions on special equipment (2) [hereinafter referred to as the “supervision inspection opinions (2)”, see Annex F] to the inspected organization. For the pressure pipe construction supervision inspection, it shall also report to the special equipment safety supervision department, and inform the development organization in writing.
In case of any general problems (Note 2-2) in the supervision inspection process, the supervision inspection personnel shall issue the Contact list for special equipment supervision inspection (hereinafter referred to as the "contact list for supervision inspection", see Annex H) to the inspected organization in time, so as to require the inspected organization to rectify the problems raised. The supervision inspection personnel shall track and confirm the rectification.
Note 2-1: serious problems refer to rejected and uncorrectable supervision inspection items; serious out-of-control of the implementation of quality assurance system of the inspected organization; refusing to rectify the problems raised in the contact list for supervision inspection; failing to be provided with corresponding license conditions any longer for those who have the license qualification requirements; serious violation of special equipment licensing system (such as altering, forging, transferring or selling special equipment license, selling or illegally providing quality certificates to the organizations without special equipment license).
Note 2-2: general problems refer to the problems affecting the safety performance of pressure pipe unit or pressure pipes and the implementation of quality assurance system except the serious problems listed in Note 2-1.
Upon receiving the supervision inspection opinions (2) or the contact list for supervision inspection, the inspected organization shall take effective rectification measures and rectify the problems listed thereof within the prescribed time limit. On completion of the rectification, the relevant witness data shall be submitted to the supervision inspection organization. After receiving the witness data for rectification from the inspected organization, the supervision inspection personnel shall review and confirm such data.
In case of any doubts about the testing results provided by the inspected organization or non-conformance of testing items to the safety technical specifications, the supervision inspection personnel shall require the inspected organization to carry out re-inspection or supplementary tests.
If the supervision inspection organization finds that the inspected organization has violated regulations and refuses to correct, issues false reports or provides false documents, it shall timely report to the place of manufacture for pressure pipe unit or the special equipment safety supervision department receiving the notification of pressure pipe construction, as well as the issuing authority for design license, manufacture license, installation license or non-destructive testing qualification; it shall also inform the development organization in writing during pressure pipe construction supervision inspection.
Contents of TSG D7006-2020
Foreword i
1 General provisions
2 General requirements
3 Supplementary provisions
Annex A Special requirements for pressure pipe unit manufacture supervision inspection
Annex B Special requirements for long-distance pipe construction supervision inspection
Annex C Special requirements for utility pipe construction supervision inspection
Annex D Special requirements for industrial pipe construction supervision inspection
Annex E Special equipment supervision inspection certificate (manufacturing of pressure pipe units)
Attached table e Pressure pipe data sheet
Annex F Notice for supervision inspection opinions on special equipment (1)
Annex G Evaluation on the implementation of quality assurance system
Annex H Contact list for special equipment supervision inspection