2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50273-2022
GB 50273-2022   Stanard for construction and acceptance of boiler installation engineering (English Version)
Standard No.: GB 50273-2022 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 38000 words Translation Price(USD):1140.0 remind me the price change

Email:

Implemented on:2022-5-1 Delivery: via email in 1 business day

→ → →

,,2022-5-1,8DA1572E9280B2141648038789307
Standard No.: GB 50273-2022
English Name: Stanard for construction and acceptance of boiler installation engineering
Chinese Name: 锅炉安装工程施工及验收标准
Professional Classification: GB    National Standard
Source Content Issued by: MOHURD; SAMR
Issued on: 2022-01-05
Implemented on: 2022-5-1
Status: valid
Superseding:GB 50273-2009 Code for Construction and Acceptance of Boiler Installation Engineering
Target Language: English
File Format: PDF
Word Count: 38000 words
Translation Price(USD): 1140.0
Delivery: via email in 1 business day
Standard for construction and acceptance of boiler installation engineering 1 General provisions 1.0.1 This standard is developed in order to improve the construction level of boiler installation engineering, promote technical progress, ensure engineering quality and safety, and improve economic benefit. 1.0.2 This standard is applicable to the construction and acceptance of installation engineering of fixed steam boilers with rated working pressure less than or equal to 3.82 MPa, fixed hot water boilers with rated effluent pressure greater than 0.1 MPa and organic heat transfer material heater for industrial, civil and district heating. It is not applicable to the construction and acceptance of installation engineering of cast iron boilers, transportation vehicles and marine boilers, nuclear energy boilers, and power station boilers. 1.0.3 Boilers that have not gone through the engineering acceptance procedures are strictly forbidden for use. 1.0.4 Before and during the installation of the boiler, when quality problem affecting the safe use of the pressurized parts is found, the installation must be stopped and the problem must be reported to the development unit. 1.0.5 In addition to this standard, construction and acceptance of boiler installation engineering shall also comply with those stipulated in the current relevant standards of the nation. 2 Foundation retest and setting-out 2.0.1 Before the boiler and its auxiliary equipment are put into place, their foundation positions and dimensions are to be retested as specified in Table 2.0.1. Table 2.0.1 Permissible deviation in foundation position and dimension of boilers and their auxiliary equipment (mm) 2.0.2 Before the boil is installed, the longitudinal and transverse installation reference lines and elevation reference points shall be delineated. 2.0.3 The boil foundation setting-out shall meet the following requirements: 1 Longitudinal and transverse centerlines shall be perpendicular to each other; 2 The permissible deviation of the distance between the positioning centerlines of the corresponding two columns shall be ±2 mm; 3 The difference between the two diagonal lengths of the positioning center of the symmetrical four columns in each group shall not be greater than 5 mm. 3 Steel racks 3.0.1 Before the steel racks are installed, the number of components shall be counted according to the construction drawing, and the length and straightness of the main components such as columns, beams, and racks shall be retested as specified in Table 3.0.1. Table 3.0.1 Permissible deviations in length and straightness of main members of steel racks (mm) Note: The frames include guard frames, top guard frames, or other rectangular frames. 3.0.2 When the steel racks are installed,1 m elevation line should be determined and drawn on the column according to the elevation of the bracket and chapiter on the column. To align with the column, a 1 m elevation line on each column shall be measured according to the elevation reference line on the running floor of the boiler room. The 1 m elevation line on the column shall be used as the reference elevation when installing the components and members of the boiler for inspection. 3.0.3 The permissible deviation of steel rack installation and its pest position shall be as specified in Table 3.0.3.
1 General provisions 2 Foundation retest and setting-out 3 Steel racks 4 Drum, header and tubes on heated side 4.1 Drum and header 4.2 Tubes on heated side 4.3 Welding of pressure elements 4.4 Economizer, superheater and steel tube type air pre-heater 5 Pressure test 6 Taps, instruments, valves, soot blower and auxiliaries 6.1 Taps 6.2 Instruments 6.3 Valves, soot blowers and auxiliaries 7 Burning equipment 7.1 Stoker 7.2 Spreader 7.3 Burner 8 Furnace wall building and insulation layer 8.1 Furnace wall building 8.2 Insulation layer 9 Air leakage test, furnace drying, boiling out, tightness test and test run 9.1 Air leakage test 9.2 Furnace drying 9.3 Boiling out 9.4 Tightness test and test run 10 Acceptance Explanation of wording in this standard List of quoted standards
GB 50273-2022 is referred in:
*GB/T 16508.7-2022 Shell boilers—Part 7:Installation
*GB/T 16508.7-2013 Shell Boilers - Part 7: Installation
*GB/T 16507.8-2013 Water-tube Boilers - Part 8: Installation and Operation
*GB/T 16507.8-2022 Water-tube boilers—Part 8: Installation and operation
*GB/T 44906-2024 Technical specifications for biomass fired boilers
Code of China
Standard
GB 50273-2022  Stanard for construction and acceptance of boiler installation engineering (English Version)
Standard No.GB 50273-2022
Statusvalid
LanguageEnglish
File FormatPDF
Word Count38000 words
Price(USD)1140.0
Implemented on2022-5-1
Deliveryvia email in 1 business day
Detail of GB 50273-2022
Standard No.
GB 50273-2022
English Name
Stanard for construction and acceptance of boiler installation engineering
Chinese Name
锅炉安装工程施工及验收标准
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOHURD; SAMR
Issued on
2022-01-05
Implemented on
2022-5-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB 50273-2009 Code for Construction and Acceptance of Boiler Installation Engineering
Language
English
File Format
PDF
Word Count
38000 words
Price(USD)
1140.0
Keywords
GB 50273-2022, GB/T 50273-2022, GBT 50273-2022, GB50273-2022, GB 50273, GB50273, GB/T50273-2022, GB/T 50273, GB/T50273, GBT50273-2022, GBT 50273, GBT50273
Introduction of GB 50273-2022
Standard for construction and acceptance of boiler installation engineering 1 General provisions 1.0.1 This standard is developed in order to improve the construction level of boiler installation engineering, promote technical progress, ensure engineering quality and safety, and improve economic benefit. 1.0.2 This standard is applicable to the construction and acceptance of installation engineering of fixed steam boilers with rated working pressure less than or equal to 3.82 MPa, fixed hot water boilers with rated effluent pressure greater than 0.1 MPa and organic heat transfer material heater for industrial, civil and district heating. It is not applicable to the construction and acceptance of installation engineering of cast iron boilers, transportation vehicles and marine boilers, nuclear energy boilers, and power station boilers. 1.0.3 Boilers that have not gone through the engineering acceptance procedures are strictly forbidden for use. 1.0.4 Before and during the installation of the boiler, when quality problem affecting the safe use of the pressurized parts is found, the installation must be stopped and the problem must be reported to the development unit. 1.0.5 In addition to this standard, construction and acceptance of boiler installation engineering shall also comply with those stipulated in the current relevant standards of the nation. 2 Foundation retest and setting-out 2.0.1 Before the boiler and its auxiliary equipment are put into place, their foundation positions and dimensions are to be retested as specified in Table 2.0.1. Table 2.0.1 Permissible deviation in foundation position and dimension of boilers and their auxiliary equipment (mm) 2.0.2 Before the boil is installed, the longitudinal and transverse installation reference lines and elevation reference points shall be delineated. 2.0.3 The boil foundation setting-out shall meet the following requirements: 1 Longitudinal and transverse centerlines shall be perpendicular to each other; 2 The permissible deviation of the distance between the positioning centerlines of the corresponding two columns shall be ±2 mm; 3 The difference between the two diagonal lengths of the positioning center of the symmetrical four columns in each group shall not be greater than 5 mm. 3 Steel racks 3.0.1 Before the steel racks are installed, the number of components shall be counted according to the construction drawing, and the length and straightness of the main components such as columns, beams, and racks shall be retested as specified in Table 3.0.1. Table 3.0.1 Permissible deviations in length and straightness of main members of steel racks (mm) Note: The frames include guard frames, top guard frames, or other rectangular frames. 3.0.2 When the steel racks are installed,1 m elevation line should be determined and drawn on the column according to the elevation of the bracket and chapiter on the column. To align with the column, a 1 m elevation line on each column shall be measured according to the elevation reference line on the running floor of the boiler room. The 1 m elevation line on the column shall be used as the reference elevation when installing the components and members of the boiler for inspection. 3.0.3 The permissible deviation of steel rack installation and its pest position shall be as specified in Table 3.0.3.
Contents of GB 50273-2022
1 General provisions 2 Foundation retest and setting-out 3 Steel racks 4 Drum, header and tubes on heated side 4.1 Drum and header 4.2 Tubes on heated side 4.3 Welding of pressure elements 4.4 Economizer, superheater and steel tube type air pre-heater 5 Pressure test 6 Taps, instruments, valves, soot blower and auxiliaries 6.1 Taps 6.2 Instruments 6.3 Valves, soot blowers and auxiliaries 7 Burning equipment 7.1 Stoker 7.2 Spreader 7.3 Burner 8 Furnace wall building and insulation layer 8.1 Furnace wall building 8.2 Insulation layer 9 Air leakage test, furnace drying, boiling out, tightness test and test run 9.1 Air leakage test 9.2 Furnace drying 9.3 Boiling out 9.4 Tightness test and test run 10 Acceptance Explanation of wording in this standard List of quoted standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50273-2022, GB/T 50273-2022, GBT 50273-2022, GB50273-2022, GB 50273, GB50273, GB/T50273-2022, GB/T 50273, GB/T50273, GBT50273-2022, GBT 50273, GBT50273