2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 16508.7-2013
GB/T 16508.7-2013   Shell Boilers - Part 7: Installation (English Version)
Standard No.: GB/T 16508.7-2013 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 8000 words Translation Price(USD):140.0 remind me the price change

Email:

Implemented on:2014-7-1 Delivery: via email in 1 business day

→ → →

2022-10-01,2022-10-1,2014-7-1,1411381823924137D04A75E78BCAD
Standard No.: GB/T 16508.7-2013
English Name: Shell Boilers - Part 7: Installation
Chinese Name: 锅壳锅炉 第7部分:安装
Chinese Classification: J98    Boiler and its auxiliary equipment
Professional Classification: GB    National Standard
ICS Classification: 27.060.30 27.060.30    Boilers and heat exchangers 27.060.30
Source Content Issued by: AQSIQ;SAC
Issued on: 2013-12-31
Implemented on: 2014-7-1
Status: superseded
Superseded by:GB/T 16508.7-2022 Shell boilers—Part 7:Installation
Superseded on:2022-10-1
Abolished on:2022-10-01
Target Language: English
File Format: PDF
Word Count: 8000 words
Translation Price(USD): 140.0
Delivery: via email in 1 business day
1 Scope This part of GB/T 16508 specifies the installation requirements of stationary shell boiler. This part is applicable to the shell boilers defined within the scope of GB/T 16508.1. 2 Normative References The following documents for the application of this document are essential. Any dated reference, just dated edition applies to this document. For undated references, the latest edition (including any amendments) applies to this document. GB/T 1576 Water Quality for Industrial Boilers GB/T 2900.48 Electrotechnical Terminology of Boilers GB/T 10180 Thermal Performance Test Code for Industrial Boilers GB/T 16508.1 Shell Boilers - Part 1: General Requirements GB/T 16508.4 Shell Boilers - Part 4: Fabrication, Inspection and Acceptance GB/T 16508.5 Shell Boilers - Part 5: Safety Appurtenances and Instruments GB 50211 Code for Construction and Acceptance of Industrial Furnaces Building GB 50231 General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering GB 50264 Design Code for Insulation Engineering of Industrial Equipment and Pipe GB 50273 Code for Construction and Acceptance of Boiler Installation Engineering TSG G0001 Boiler Safety Technical Supervision Administration Regulation TSG G3001 Boiler Installation and Alteration Enterprises Supervision Administration Regulation 3 Terminologies and Definitions For the purposes of this document, the terminologies and definitions defined in GB/T 2900.48 as well as the following ones apply. 3.1 Boiler setting Outer wall of boiler constructed or laid with refractory material, thermal insulation material, etc. 3.2 Drying-out Process for drying the boiler setting at certain temperature rise speed and with certain holding time by igniting or other heating methods. 3.3 Boiling-out Method of heating, deoiling and cleaning for 24h~48h at 0.5MPa~2MPa as well as passivating the internal surface of metal after injecting the mixed solution of sodium hydroxide and trisodium phosphate. 3.4 Service hours, SH Hours of operation state. 4 Basic Requirements 4.1 The boiler installation organization may carry out boiler installation within the permissible range of the license only after obtaining the corresponding qualification according to those specified in Boiler Installation and Alteration Enterprises Supervision Administration Regulation (TSG G3001). 4.2 Prior to construction, the installation and construction organizations may carry out construction only after informing the special equipment safety supervision department of the boiler equipment installation condition. 4.3 The boiler installation work shall meet those specified in Boiler Safety Technical Supervision Administration Regulation (TSG G0001), and the installation process shall be subjected to the supervision and inspection of national special equipment safety supervision and inspection organization; the boiler failing to pass the supervision and inspection shall not be put into service. 4.4 Qualifications of operating personnel for welding or non-destructive testing shall meet those specified in GB/T 16508.1. 4.5 During the installation of boiler, in case of quality problems (pressure component influences safe application), the installation shall be stopped. 4.6 After the completion of boiler installation, the installation organization shall hand over the relevant technical data to the using organization within 30 days after acceptance. 4.7 Boiler using organization shall establish safety technology file of boiler equipment. 5 Foundation Inspection and Marking Out 5.1 Before boiler and its auxiliary equipment are put in place, the foundation dimension and position shall be inspected, and the permissible deviation shall meet those specified in boiler equipment technical document; if there is no requirement, the permissible deviation shall meet those specified in GB 50273. 5.2 Before shell boiler installation, vertical and transversal installation reference lines as well as elevation reference point shall be marked. 6 Steel Frame Installation 6.1 Before steel frame installation, the quantity of members shall be checked against construction drawing and such primary members as upright column, girder, etc. shall be inspected, and the permissible deviation shall meet those specified in boiler equipment technical document; if there is no requirement, the permissible deviation shall meet those specified in GB 50273. 6.2 The steel frame installation requirements are as follows: a) As for steel frame installation, the elevation line should be determined first according to upright column; b) After the upright column is put in place, the column foot shall be fixed on the foundation according to design requirements; in case it is necessary to fix by welding to embedded reinforcement, it shall be welded firmly; c) Platform, bracket, escalator, railing, rail post and foot baffle shall be installed straightly and welded firmly; the spacing between rail posts shall be uniform; the surface of weld at the joint of railing shall be smooth; d) The length and inclination of escalator as well as the spacing between upper/lower foot board of escalator and connection platform shall not be modified at will. e) Hole should not be drilled at will on such members as platform, escalator and bracket; in case it is inevitable, after the hole is drilled, reinforcement measures shall be taken. 6.3 The permissible deviation of steel frame installation shall meet those specified in boiler equipment technical document; if there is no requirement, the permissible deviation shall meet those specified in GB 50273.
Foreword i 1 Scope 2 Normative References 3 Terminologies and Definitions 4 Basic Requirements 5 Foundation Inspection and Marking Out 6 Steel Frame Installation 7 Shell, Header and Heating Surface Tube 8 Tubular Air Preheater Installation 9 Instrument and Valve 10 Combustion Equipment 11 Boiler Setting Construction and Heat Insulating Layer 12 Installation of Integrative and Shop-assembled Boilers 13 Installation of Such Auxiliary Machine as Fan and Pump 14 Drying-out, Boiling-out, Tightness Test and Test Run 15 Acceptance
Referred in GB/T 16508.7-2013:
*GB/T 1576-2018 Water quality for industrial boilers
*GB/T 2900.48-2008 Electrotechnical terminology of boilers
*GB/T 10180-2017 Thermal performance test code for industrial boilers
*GB/T 16508.1-2022 Shell boilers—Part 1: General requirements
*GB/T 16508.4-2022 Shell boilers—Part 4: Fabrication, inspection and acceptance
*GB/T 16508.5-2022 Shell boilers—Part 5:Safety appurtenances and instruments
*GB 50211-2014 Code for construction and acceptance of industrial furnaces building
*GB 50231-2009 General code for construction and acceptance of mechanical equipment installation engineering
*GB 50264-2013 Design Code for Insulation Engineering of Industrial Equipment and Pipe
*GB 50273-2022 Stanard for construction and acceptance of boiler installation engineering
*TSG G0001-2012/XG1-2017 Boiler Safety Technical Supervision Administration Regulation
*TSG G3001-2004 Boiler Installation and Alteration Enterprises
GB/T 16508.7-2013 is referred in:
* GB/T 16508.1-2013 Shell Boilers - Part 1: General Requirements
* GBT16508.1~16508.8-2013 Shell boilers (Collection)
Code of China
Standard
GB/T 16508.7-2013  Shell Boilers - Part 7: Installation (English Version)
Standard No.GB/T 16508.7-2013
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count8000 words
Price(USD)140.0
Implemented on2014-7-1
Deliveryvia email in 1 business day
Detail of GB/T 16508.7-2013
Standard No.
GB/T 16508.7-2013
English Name
Shell Boilers - Part 7: Installation
Chinese Name
锅壳锅炉 第7部分:安装
Chinese Classification
J98
Professional Classification
GB
ICS Classification
Issued by
AQSIQ;SAC
Issued on
2013-12-31
Implemented on
2014-7-1
Status
superseded
Superseded by
GB/T 16508.7-2022 Shell boilers—Part 7:Installation
Superseded on
2022-10-1
Abolished on
2022-10-01
Superseding
Language
English
File Format
PDF
Word Count
8000 words
Price(USD)
140.0
Keywords
GB/T 16508.7-2013, GB 16508.7-2013, GBT 16508.7-2013, GB/T16508.7-2013, GB/T 16508.7, GB/T16508.7, GB16508.7-2013, GB 16508.7, GB16508.7, GBT16508.7-2013, GBT 16508.7, GBT16508.7
Introduction of GB/T 16508.7-2013
1 Scope This part of GB/T 16508 specifies the installation requirements of stationary shell boiler. This part is applicable to the shell boilers defined within the scope of GB/T 16508.1. 2 Normative References The following documents for the application of this document are essential. Any dated reference, just dated edition applies to this document. For undated references, the latest edition (including any amendments) applies to this document. GB/T 1576 Water Quality for Industrial Boilers GB/T 2900.48 Electrotechnical Terminology of Boilers GB/T 10180 Thermal Performance Test Code for Industrial Boilers GB/T 16508.1 Shell Boilers - Part 1: General Requirements GB/T 16508.4 Shell Boilers - Part 4: Fabrication, Inspection and Acceptance GB/T 16508.5 Shell Boilers - Part 5: Safety Appurtenances and Instruments GB 50211 Code for Construction and Acceptance of Industrial Furnaces Building GB 50231 General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering GB 50264 Design Code for Insulation Engineering of Industrial Equipment and Pipe GB 50273 Code for Construction and Acceptance of Boiler Installation Engineering TSG G0001 Boiler Safety Technical Supervision Administration Regulation TSG G3001 Boiler Installation and Alteration Enterprises Supervision Administration Regulation 3 Terminologies and Definitions For the purposes of this document, the terminologies and definitions defined in GB/T 2900.48 as well as the following ones apply. 3.1 Boiler setting Outer wall of boiler constructed or laid with refractory material, thermal insulation material, etc. 3.2 Drying-out Process for drying the boiler setting at certain temperature rise speed and with certain holding time by igniting or other heating methods. 3.3 Boiling-out Method of heating, deoiling and cleaning for 24h~48h at 0.5MPa~2MPa as well as passivating the internal surface of metal after injecting the mixed solution of sodium hydroxide and trisodium phosphate. 3.4 Service hours, SH Hours of operation state. 4 Basic Requirements 4.1 The boiler installation organization may carry out boiler installation within the permissible range of the license only after obtaining the corresponding qualification according to those specified in Boiler Installation and Alteration Enterprises Supervision Administration Regulation (TSG G3001). 4.2 Prior to construction, the installation and construction organizations may carry out construction only after informing the special equipment safety supervision department of the boiler equipment installation condition. 4.3 The boiler installation work shall meet those specified in Boiler Safety Technical Supervision Administration Regulation (TSG G0001), and the installation process shall be subjected to the supervision and inspection of national special equipment safety supervision and inspection organization; the boiler failing to pass the supervision and inspection shall not be put into service. 4.4 Qualifications of operating personnel for welding or non-destructive testing shall meet those specified in GB/T 16508.1. 4.5 During the installation of boiler, in case of quality problems (pressure component influences safe application), the installation shall be stopped. 4.6 After the completion of boiler installation, the installation organization shall hand over the relevant technical data to the using organization within 30 days after acceptance. 4.7 Boiler using organization shall establish safety technology file of boiler equipment. 5 Foundation Inspection and Marking Out 5.1 Before boiler and its auxiliary equipment are put in place, the foundation dimension and position shall be inspected, and the permissible deviation shall meet those specified in boiler equipment technical document; if there is no requirement, the permissible deviation shall meet those specified in GB 50273. 5.2 Before shell boiler installation, vertical and transversal installation reference lines as well as elevation reference point shall be marked. 6 Steel Frame Installation 6.1 Before steel frame installation, the quantity of members shall be checked against construction drawing and such primary members as upright column, girder, etc. shall be inspected, and the permissible deviation shall meet those specified in boiler equipment technical document; if there is no requirement, the permissible deviation shall meet those specified in GB 50273. 6.2 The steel frame installation requirements are as follows: a) As for steel frame installation, the elevation line should be determined first according to upright column; b) After the upright column is put in place, the column foot shall be fixed on the foundation according to design requirements; in case it is necessary to fix by welding to embedded reinforcement, it shall be welded firmly; c) Platform, bracket, escalator, railing, rail post and foot baffle shall be installed straightly and welded firmly; the spacing between rail posts shall be uniform; the surface of weld at the joint of railing shall be smooth; d) The length and inclination of escalator as well as the spacing between upper/lower foot board of escalator and connection platform shall not be modified at will. e) Hole should not be drilled at will on such members as platform, escalator and bracket; in case it is inevitable, after the hole is drilled, reinforcement measures shall be taken. 6.3 The permissible deviation of steel frame installation shall meet those specified in boiler equipment technical document; if there is no requirement, the permissible deviation shall meet those specified in GB 50273.
Contents of GB/T 16508.7-2013
Foreword i 1 Scope 2 Normative References 3 Terminologies and Definitions 4 Basic Requirements 5 Foundation Inspection and Marking Out 6 Steel Frame Installation 7 Shell, Header and Heating Surface Tube 8 Tubular Air Preheater Installation 9 Instrument and Valve 10 Combustion Equipment 11 Boiler Setting Construction and Heat Insulating Layer 12 Installation of Integrative and Shop-assembled Boilers 13 Installation of Such Auxiliary Machine as Fan and Pump 14 Drying-out, Boiling-out, Tightness Test and Test Run 15 Acceptance
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 16508.7-2013, GB 16508.7-2013, GBT 16508.7-2013, GB/T16508.7-2013, GB/T 16508.7, GB/T16508.7, GB16508.7-2013, GB 16508.7, GB16508.7, GBT16508.7-2013, GBT 16508.7, GBT16508.7