2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50433-2018
GB 50433-2018   Technical standard of soil and water conservation for production and construction projects (English Version)
Standard No.: GB 50433-2018 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 24500 words Translation Price(USD):735.0 remind me the price change

Email:

Implemented on:2019-4-1 Delivery: via email in 1~2 business day

→ → →

,,2019-4-1,A70369F1E569B1C51543586192810
Standard No.: GB 50433-2018
English Name: Technical standard of soil and water conservation for production and construction projects
Chinese Name: 生产建设项目水土保持技术标准
Professional Classification: GB    National Standard
Source Content Issued by: MOHURD
Issued on: 2018-11-01
Implemented on: 2019-4-1
Status: valid
Superseding:GB 50433-2008 Technical code on soil and water conservation of development and construction projects
Target Language: English
File Format: PDF
Word Count: 24500 words
Translation Price(USD): 735.0
Delivery: via email in 1~2 business day
General provisions 1.0.1This standard is formulated to prevent and control soil erosion caused by production andconstruction activities, protect and rationally utilize soil and water resources, improve ecologicalenvironment,and ensure sustainable economic and social development. 1.0.2 This standard is applicable to the prevention and control of soil erosion in the production andconstruction projects ( PCPs) that may cause soil erosion in the process of construction or production. 1.0.3 The prevention and control of soil erosion caused by the PCPs shall stick to the principles offocusing on prevention , prioritizing protection, adapting to loeal conditions, and being safe, reliable.technically feasible, and economically viable, and it s encouraged to adopt advanced technologies,innovative technies,and new materials. 1.0.4 The technologies of soil and water conservation for the PCPs shall comply with not only thisstandard ,but also current relevant standards of the nation. 2 Terms 2.0.1 responsibility range for soil and water conservation An area where a production and construction entity shall be responsible for sóil erosion preventionand control according to laws. 2.0.2 principal part of project(PPP)A collective definition of main and affiliated parts of a production and construction projeet. 2.0.3 line-type production and construction project (PCP) A PCP with a large layout span in linear distribution. 2.0.4 block-type production and construction project (PCP A PCP with relatively concentrated layout in block distribution. 2.0.5 constructive projectA completed project without any further land disturbance such as excavation, earth (rock, sand )borrow ,and spoil (rock,dreg,fly ash,mullock,tailings) disposal during its operation period. 2.0.6constructive and productive projeetA completed project still with land disturbance such as excavation,eárth (rock, sand) borrow , andspoil (rock,dreg,fly ash,mullock,tailings) disposal during its production period. 2.0.7 target year of design The year that soil and water conservation measures defermined in a soil and water conservationscheme are implemented and initially generate benefits. 3 Basic requirements 3.1 General requirements 3.1.1 The technical work of soil and water conservation for the PCP shalf mainly include thecompilation of soil and water conservation scheme, soil and water conservation measure design.construetion, supervision and monitoring, and the acceptance of soil and water conservation facilitiesThe technical work of soil and water conservation for the PCP shall beleonducted simultaneously witheach stage of the project, The soil and water conservation chapter in preliminary feasibility study stage( project proposal) report, the contents of soil and water conservation scheme and the contents of thespecial chapter in the preliminary design report of soil and water conservation measures shall complywith the provisions in Appendixes A ,B and C,respecrively 3.1.2The soil erosion prevention and controlfor the PCP shall meet the following requirements : 1During the whole process of project, the disturbance and destruction on original topographicfeatures , vegetation, and water systems shall be controlled and minimized , and the original vegetation.topsoil, crust and sand crust, lichen,ete. shall be protected. Water yse and land occupation shall bereduced by utilization efficieney imprevement. 2Prevention and control measures such as retaining, slope protection, water interception anddrainage shall be taken for,the areas of excavation, filling,and disposal. 3The spoil (roek,dreg) shall be comprehensively afilized,and the unusable should be piled up ina special storage placé. 4 Temporary protective measures shall be taken during civil construction. 5land remediation shall be timely carried out for finished construction sites to restore its utilizingfunctionx 3.1.3The soil erosion prevention and control for the PCP shall achieve the following targets: 1. Increased soil erosion in the construetion scope of a project shall be controlled effectively , andoriginal soil erosion shall be treated. 2 Soil and water conservation facilities shall be safe and efficient. 3Soil and water resources, as well as forest and grass vegetation shall be protected and restoredto the greatest extent. 4The six indicators including the percentage of controlled soil erosion area, proportion of soilerosion control, pereentage of blocked dregs and soil, percentage of protected topsoil, percentage olrecovered forest and grass, and percentage of forest and grass coverage shall meet the requirements olcurrent national standard,GB/T 50434 Standard of Soil Erosion Control for Production andConsiruction Projects.
Code of China
Standard
GB 50433-2018  Technical standard of soil and water conservation for production and construction projects (English Version)
Standard No.GB 50433-2018
Statusvalid
LanguageEnglish
File FormatPDF
Word Count24500 words
Price(USD)735.0
Implemented on2019-4-1
Deliveryvia email in 1~2 business day
Detail of GB 50433-2018
Standard No.
GB 50433-2018
English Name
Technical standard of soil and water conservation for production and construction projects
Chinese Name
生产建设项目水土保持技术标准
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2018-11-01
Implemented on
2019-4-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB 50433-2008 Technical code on soil and water conservation of development and construction projects
Language
English
File Format
PDF
Word Count
24500 words
Price(USD)
735.0
Keywords
GB 50433-2018, GB/T 50433-2018, GBT 50433-2018, GB50433-2018, GB 50433, GB50433, GB/T50433-2018, GB/T 50433, GB/T50433, GBT50433-2018, GBT 50433, GBT50433
Introduction of GB 50433-2018
General provisions 1.0.1This standard is formulated to prevent and control soil erosion caused by production andconstruction activities, protect and rationally utilize soil and water resources, improve ecologicalenvironment,and ensure sustainable economic and social development. 1.0.2 This standard is applicable to the prevention and control of soil erosion in the production andconstruction projects ( PCPs) that may cause soil erosion in the process of construction or production. 1.0.3 The prevention and control of soil erosion caused by the PCPs shall stick to the principles offocusing on prevention , prioritizing protection, adapting to loeal conditions, and being safe, reliable.technically feasible, and economically viable, and it s encouraged to adopt advanced technologies,innovative technies,and new materials. 1.0.4 The technologies of soil and water conservation for the PCPs shall comply with not only thisstandard ,but also current relevant standards of the nation. 2 Terms 2.0.1 responsibility range for soil and water conservation An area where a production and construction entity shall be responsible for sóil erosion preventionand control according to laws. 2.0.2 principal part of project(PPP)A collective definition of main and affiliated parts of a production and construction projeet. 2.0.3 line-type production and construction project (PCP) A PCP with a large layout span in linear distribution. 2.0.4 block-type production and construction project (PCP A PCP with relatively concentrated layout in block distribution. 2.0.5 constructive projectA completed project without any further land disturbance such as excavation, earth (rock, sand )borrow ,and spoil (rock,dreg,fly ash,mullock,tailings) disposal during its operation period. 2.0.6constructive and productive projeetA completed project still with land disturbance such as excavation,eárth (rock, sand) borrow , andspoil (rock,dreg,fly ash,mullock,tailings) disposal during its production period. 2.0.7 target year of design The year that soil and water conservation measures defermined in a soil and water conservationscheme are implemented and initially generate benefits. 3 Basic requirements 3.1 General requirements 3.1.1 The technical work of soil and water conservation for the PCP shalf mainly include thecompilation of soil and water conservation scheme, soil and water conservation measure design.construetion, supervision and monitoring, and the acceptance of soil and water conservation facilitiesThe technical work of soil and water conservation for the PCP shall beleonducted simultaneously witheach stage of the project, The soil and water conservation chapter in preliminary feasibility study stage( project proposal) report, the contents of soil and water conservation scheme and the contents of thespecial chapter in the preliminary design report of soil and water conservation measures shall complywith the provisions in Appendixes A ,B and C,respecrively 3.1.2The soil erosion prevention and controlfor the PCP shall meet the following requirements : 1During the whole process of project, the disturbance and destruction on original topographicfeatures , vegetation, and water systems shall be controlled and minimized , and the original vegetation.topsoil, crust and sand crust, lichen,ete. shall be protected. Water yse and land occupation shall bereduced by utilization efficieney imprevement. 2Prevention and control measures such as retaining, slope protection, water interception anddrainage shall be taken for,the areas of excavation, filling,and disposal. 3The spoil (roek,dreg) shall be comprehensively afilized,and the unusable should be piled up ina special storage placé. 4 Temporary protective measures shall be taken during civil construction. 5land remediation shall be timely carried out for finished construction sites to restore its utilizingfunctionx 3.1.3The soil erosion prevention and control for the PCP shall achieve the following targets: 1. Increased soil erosion in the construetion scope of a project shall be controlled effectively , andoriginal soil erosion shall be treated. 2 Soil and water conservation facilities shall be safe and efficient. 3Soil and water resources, as well as forest and grass vegetation shall be protected and restoredto the greatest extent. 4The six indicators including the percentage of controlled soil erosion area, proportion of soilerosion control, pereentage of blocked dregs and soil, percentage of protected topsoil, percentage olrecovered forest and grass, and percentage of forest and grass coverage shall meet the requirements olcurrent national standard,GB/T 50434 Standard of Soil Erosion Control for Production andConsiruction Projects.
Contents of GB 50433-2018
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50433-2018, GB/T 50433-2018, GBT 50433-2018, GB50433-2018, GB 50433, GB50433, GB/T50433-2018, GB/T 50433, GB/T50433, GBT50433-2018, GBT 50433, GBT50433