2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50433-2008
GB 50433-2008   Technical code on soil and water conservation of development and construction projects (English Version)
Standard No.: GB 50433-2008 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 27000 words Translation Price(USD):540.0 remind me the price change

Email:

Implemented on:2008-7-1 Delivery: via email in 1 business day

→ → →

,2019-4-1,2008-7-1,14113818186421B06DCF8EC5726AE
Standard No.: GB 50433-2008
English Name: Technical code on soil and water conservation of development and construction projects
Chinese Name: 开发建设项目水土保持技术规范
Chinese Classification: P57    Irrigation drainage and soil and water conservation engineering
Professional Classification: GB    National Standard
Source Content Issued by: MOC
Issued on: 2008-1-14
Implemented on: 2008-7-1
Status: superseded
Superseded by:GB 50433-2018 Technical standard of soil and water conservation for production and construction projects
Superseded on:2019-4-1
Target Language: English
File Format: PDF
Word Count: 27000 words
Translation Price(USD): 540.0
Delivery: via email in 1 business day
1.0.1 This standard is formulated with a view to following out the relevant national laws and regulations; pre-controlling, controlling and improving the soil erosion caused by development and construction activities; relieving possible negative influence on the ecological environment; and preventing soil erosion hazards. 1.0.2 This standard is applicable to soil erosion control for development and construction projects that may cause soil erosion during construction or manufacturing process. 1.0.3 In the soil erosion control of development and construction projects, the investigation shall be valued, it is encouraged to adopt new technique, process, and material, which make the engineering be featured in adaptation to local conditions, integrated control quality, practicality and esthetic appearance. 1.0.4 The design for soil and water conservation engineering shall, besides meeting the requirements this standard, comply with the requirements in the current relevant standards of the nation.
1 General Provisions 2 Terms 3 Basic requirements 3.1 General Requirements 3.2 Restrictive requirements of principal part of the project 3.3 Special requirements on different soil erosion area 3.4 Special requirements in construction projects of different type 4 Tasks at design stages 4.1 Basic requirements 4.2 Primary missions 5 Water and soil conservation scheme 5.1 General Requirements 5.2 General requirements in investigations and exploration survey 5.3 Basic requirements in general introduction 5.4 Basic requirements in general introduction of the project area 5.5 Analysis and evaluation on water and soil conservation of the principal part of the project 5.6 The range of responsibility for soil erosion control and control zoning 5.7 Basic requirements in soil erosion prediction 5.8 Arrangement of soil erosion control measures 5.9 Basic requirements in water and soil conservation monitoring 5.10 Requirements in implementing safeguard measures 5.11 Conclusion and suggestion 5.12 Requirements in main content of the water and soil conservation scheme 6 Special chapter on preliminary design of water and soil conservation 6.1 General Requirements 6.2 Requirements of the main content of special chapter on water and soil conservation 7 Residue retaining engineering 7.1 General Requirements 7.2 Applicable conditions 7.3 Design requirements 8 Slope protection engineering 8.1 General Requirements 8.2 Applicable conditions 8.3 Design requirements 9 Land consolidation and improvement 9.1 General provisions 9.2 Applicable conditions 9.3 Design requirements 10 The flood control and drainage engineering 10.1 General provisions 10.2 Applicable conditions 10.3 Design requirements 11 Dewatering and water storage & seepage engineering 11.1 General Provisions 11.2 Applicable conditions 11.3 Design requirements 12 Temporary protection engineering 12.1 General Provisions 12.2 Applicable conditions 12.3 Design requirements 13 Vegetation cover construction engineering 13.2 Service conditions 13.3 Design requirements 14 Wind-breaking and sand-fixing engineering 14.1 General provisions 14.2 Applicable conditions 14.3 Design requirements Annex A: Requirements in the Content of the Water and Soil Conservation Scheme Annex B: Requirements in the Content of the Water and Soil Conservation Scheme Report Table
GB 50433-2008 is referred in:
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50049-2011 Code for design of small fossil fired power plant
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50049-2011 Code for design of small fossil fired power plant
* GB 50049-2011 Code for design of small fossil fired power plant
* GB 51018-2014 Code for Design of Soil and Water Conservation Engineering
Code of China
Standard
GB 50433-2008  Technical code on soil and water conservation of development and construction projects (English Version)
Standard No.GB 50433-2008
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count27000 words
Price(USD)540.0
Implemented on2008-7-1
Deliveryvia email in 1 business day
Detail of GB 50433-2008
Standard No.
GB 50433-2008
English Name
Technical code on soil and water conservation of development and construction projects
Chinese Name
开发建设项目水土保持技术规范
Chinese Classification
P57
Professional Classification
GB
ICS Classification
Issued by
MOC
Issued on
2008-1-14
Implemented on
2008-7-1
Status
superseded
Superseded by
GB 50433-2018 Technical standard of soil and water conservation for production and construction projects
Superseded on
2019-4-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
27000 words
Price(USD)
540.0
Keywords
GB 50433-2008, GB/T 50433-2008, GBT 50433-2008, GB50433-2008, GB 50433, GB50433, GB/T50433-2008, GB/T 50433, GB/T50433, GBT50433-2008, GBT 50433, GBT50433
Introduction of GB 50433-2008
1.0.1 This standard is formulated with a view to following out the relevant national laws and regulations; pre-controlling, controlling and improving the soil erosion caused by development and construction activities; relieving possible negative influence on the ecological environment; and preventing soil erosion hazards. 1.0.2 This standard is applicable to soil erosion control for development and construction projects that may cause soil erosion during construction or manufacturing process. 1.0.3 In the soil erosion control of development and construction projects, the investigation shall be valued, it is encouraged to adopt new technique, process, and material, which make the engineering be featured in adaptation to local conditions, integrated control quality, practicality and esthetic appearance. 1.0.4 The design for soil and water conservation engineering shall, besides meeting the requirements this standard, comply with the requirements in the current relevant standards of the nation.
Contents of GB 50433-2008
1 General Provisions 2 Terms 3 Basic requirements 3.1 General Requirements 3.2 Restrictive requirements of principal part of the project 3.3 Special requirements on different soil erosion area 3.4 Special requirements in construction projects of different type 4 Tasks at design stages 4.1 Basic requirements 4.2 Primary missions 5 Water and soil conservation scheme 5.1 General Requirements 5.2 General requirements in investigations and exploration survey 5.3 Basic requirements in general introduction 5.4 Basic requirements in general introduction of the project area 5.5 Analysis and evaluation on water and soil conservation of the principal part of the project 5.6 The range of responsibility for soil erosion control and control zoning 5.7 Basic requirements in soil erosion prediction 5.8 Arrangement of soil erosion control measures 5.9 Basic requirements in water and soil conservation monitoring 5.10 Requirements in implementing safeguard measures 5.11 Conclusion and suggestion 5.12 Requirements in main content of the water and soil conservation scheme 6 Special chapter on preliminary design of water and soil conservation 6.1 General Requirements 6.2 Requirements of the main content of special chapter on water and soil conservation 7 Residue retaining engineering 7.1 General Requirements 7.2 Applicable conditions 7.3 Design requirements 8 Slope protection engineering 8.1 General Requirements 8.2 Applicable conditions 8.3 Design requirements 9 Land consolidation and improvement 9.1 General provisions 9.2 Applicable conditions 9.3 Design requirements 10 The flood control and drainage engineering 10.1 General provisions 10.2 Applicable conditions 10.3 Design requirements 11 Dewatering and water storage & seepage engineering 11.1 General Provisions 11.2 Applicable conditions 11.3 Design requirements 12 Temporary protection engineering 12.1 General Provisions 12.2 Applicable conditions 12.3 Design requirements 13 Vegetation cover construction engineering 13.2 Service conditions 13.3 Design requirements 14 Wind-breaking and sand-fixing engineering 14.1 General provisions 14.2 Applicable conditions 14.3 Design requirements Annex A: Requirements in the Content of the Water and Soil Conservation Scheme Annex B: Requirements in the Content of the Water and Soil Conservation Scheme Report Table
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50433-2008, GB/T 50433-2008, GBT 50433-2008, GB50433-2008, GB 50433, GB50433, GB/T50433-2008, GB/T 50433, GB/T50433, GBT50433-2008, GBT 50433, GBT50433