2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 12726.2-2013
GB/T 12726.2-2013   Nuclear power plants―Instrumentation important to safety―Radiation monitoring for accident and post-accident conditions―Part 2:Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air (English Version)
Standard No.: GB/T 12726.2-2013 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 7500 words Translation Price(USD):180.0 remind me the price change

Email:

Implemented on:2014-8-1 Delivery: via email in 1 business day

→ → →

,,2014-8-1,14079210214950003601d5010b6f5973
Standard No.: GB/T 12726.2-2013
English Name: Nuclear power plants―Instrumentation important to safety―Radiation monitoring for accident and post-accident conditions―Part 2:Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air
Chinese Name: 核电厂安全重要仪表 事故及事故后辐射监测 第2部分:气态排出流及通风中放射性离线连续监测设备
Chinese Classification: F69    Nuclear reactor and nuclear island equipment of nuclear power plant
Professional Classification: GB    National Standard
ICS Classification: 27.120.20 27.120.20    Nuclear power plants. Safety 27.120.20
Source Content Issued by: AQSIQ; SAC
Issued on: 2013-12-17
Implemented on: 2014-8-1
Status: valid
Superseding:GB/T 12726.2-1991 Radiation monitoring equipment for accident and postaccident conditions in nuclear power plants-Part 2: Specific requirements for equipment for continuously monitoring radioactive no
Target Language: English
File Format: PDF
Word Count: 7500 words
Translation Price(USD): 180.0
Delivery: via email in 1 business day
GB/T 12726 "Nuclear Power Plants — Instrumentation Important to Safety — Radiation Monitoring for Accident and Post-accident Conditions" is comprised of 4 parts: — Part 1: General Requirements; — Part 2: Equipment for Continuous Off-line Monitoring of Radioactivity in Gaseous Effluents and Ventilation Air; — Part 3: Equipment for Continuous High Range Area Gamma Monitoring; — Part 4: Equipment for Continuous In-line or On-line Monitoring of Radioactivity in Process Streams. This part is Part 2 of GB/T 12726 1 Scope This part of GB/T 12726 provides general guidance on the design principles and performance criteria for equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air used in nuclear power plants for accident and post-accident conditions. General requirements for technical characteristics, test procedures, radiation characteristics, electrical, mechanical, and environmental characteristics are given in GB/T 12726.1-2013. These requirements are applicable in this part unless otherwise stated. This part is applicable to: — noble gas activity monitors intended to measure the volumetric activity of radioactive noble gases in gaseous effluents at the discharge point and the variation of volumetric activity with time during accident and post-accident conditions. The monitor may also be used for the determination of the total discharge of noble gas activity over a given period. — noble gas, aerosol and specific nuclide (commonly iodine, in its different forms: inorganic iodine, organic iodine and iodine sticking on dust) monitors intended to measure the volumetric activity in air or gas systems (control room ventilation, reactor leakage collection, drywell ventilation exhaust, fuel handling building ventilation exhaust, reactor building ventilation purge exhaust) and detect any significant increase of radioactivity during or after an accident. This part is only applicable to continuous off-line measurement, i.e. monitors whose detector measures a representative proportion of the main effluent or ventilation stream at some remote location (sampling assembly). This part does not apply to monitors with the detector positioned in or adjacent to the effluent or ventilation stream, which are within the scope of GB/T 12726.4. Sample extraction and laboratory analysis, which are essential to a complete program of effluent monitoring, are not within the scope of this part.   2 Normative References The following documents are indispensable for the application of this document. For dated references, only the dated editions apply. For undated references, the latest editions (including any amendments) apply. GB/T 12726.1-2013 Nuclear Power Plants — Instrumentation Important to Safety — Radiation Monitoring for Accident and Post-accident Conditions — Part 1: General Requirements (IEC 60951-1:2009, IDT) ISO 2889:2010 Nuclear Power Plants — Instrumentation and Control Systems Important to Safety — Classification of Instrumentation and Control Functions IEC 61226 Sampling Airborne Radioactive Materials From the Stacks and Ducts of Nuclear Facilities 3 Terms and Definitions For the purposes of this document, the terms and definitions given in GB/T 12726.1-2013 apply.
Foreword II Introduction IV 1 Scope 2 Normative References 3 Terms and Definitions 4 Design Principles 4.1 General 4.2 Basic requirements related to functions 4.3 Sampling assembly 5 Functional Testing 5.1 General 5.2 Reference sources 5.3 Performance characteristics : response to other radioactive gases or particles 5.4 Air circuit performance test Table 1 Standards of SAC/TC 30/SC 2/SC 3 V Table 2 Additional Tests to Complement the General Tests Required in GB/T 12726.1-2013
Referred in GB/T 12726.2-2013:
* GB/T 12726.1-2013 Nuclear Power Plants - Instrumentation Important to Safety - Radiation Monitoring for Accident and Post-accident Conditions - Part 1: General Requirements
Code of China
Standard
GB/T 12726.2-2013  Nuclear power plants―Instrumentation important to safety―Radiation monitoring for accident and post-accident conditions―Part 2:Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air (English Version)
Standard No.GB/T 12726.2-2013
Statusvalid
LanguageEnglish
File FormatPDF
Word Count7500 words
Price(USD)180.0
Implemented on2014-8-1
Deliveryvia email in 1 business day
Detail of GB/T 12726.2-2013
Standard No.
GB/T 12726.2-2013
English Name
Nuclear power plants―Instrumentation important to safety―Radiation monitoring for accident and post-accident conditions―Part 2:Equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air
Chinese Name
核电厂安全重要仪表 事故及事故后辐射监测 第2部分:气态排出流及通风中放射性离线连续监测设备
Chinese Classification
F69
Professional Classification
GB
ICS Classification
Issued by
AQSIQ; SAC
Issued on
2013-12-17
Implemented on
2014-8-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB/T 12726.2-1991 Radiation monitoring equipment for accident and postaccident conditions in nuclear power plants-Part 2: Specific requirements for equipment for continuously monitoring radioactive no
Language
English
File Format
PDF
Word Count
7500 words
Price(USD)
180.0
Keywords
GB/T 12726.2-2013, GB 12726.2-2013, GBT 12726.2-2013, GB/T12726.2-2013, GB/T 12726.2, GB/T12726.2, GB12726.2-2013, GB 12726.2, GB12726.2, GBT12726.2-2013, GBT 12726.2, GBT12726.2
Introduction of GB/T 12726.2-2013
GB/T 12726 "Nuclear Power Plants — Instrumentation Important to Safety — Radiation Monitoring for Accident and Post-accident Conditions" is comprised of 4 parts: — Part 1: General Requirements; — Part 2: Equipment for Continuous Off-line Monitoring of Radioactivity in Gaseous Effluents and Ventilation Air; — Part 3: Equipment for Continuous High Range Area Gamma Monitoring; — Part 4: Equipment for Continuous In-line or On-line Monitoring of Radioactivity in Process Streams. This part is Part 2 of GB/T 12726 1 Scope This part of GB/T 12726 provides general guidance on the design principles and performance criteria for equipment for continuous off-line monitoring of radioactivity in gaseous effluents and ventilation air used in nuclear power plants for accident and post-accident conditions. General requirements for technical characteristics, test procedures, radiation characteristics, electrical, mechanical, and environmental characteristics are given in GB/T 12726.1-2013. These requirements are applicable in this part unless otherwise stated. This part is applicable to: — noble gas activity monitors intended to measure the volumetric activity of radioactive noble gases in gaseous effluents at the discharge point and the variation of volumetric activity with time during accident and post-accident conditions. The monitor may also be used for the determination of the total discharge of noble gas activity over a given period. — noble gas, aerosol and specific nuclide (commonly iodine, in its different forms: inorganic iodine, organic iodine and iodine sticking on dust) monitors intended to measure the volumetric activity in air or gas systems (control room ventilation, reactor leakage collection, drywell ventilation exhaust, fuel handling building ventilation exhaust, reactor building ventilation purge exhaust) and detect any significant increase of radioactivity during or after an accident. This part is only applicable to continuous off-line measurement, i.e. monitors whose detector measures a representative proportion of the main effluent or ventilation stream at some remote location (sampling assembly). This part does not apply to monitors with the detector positioned in or adjacent to the effluent or ventilation stream, which are within the scope of GB/T 12726.4. Sample extraction and laboratory analysis, which are essential to a complete program of effluent monitoring, are not within the scope of this part.   2 Normative References The following documents are indispensable for the application of this document. For dated references, only the dated editions apply. For undated references, the latest editions (including any amendments) apply. GB/T 12726.1-2013 Nuclear Power Plants — Instrumentation Important to Safety — Radiation Monitoring for Accident and Post-accident Conditions — Part 1: General Requirements (IEC 60951-1:2009, IDT) ISO 2889:2010 Nuclear Power Plants — Instrumentation and Control Systems Important to Safety — Classification of Instrumentation and Control Functions IEC 61226 Sampling Airborne Radioactive Materials From the Stacks and Ducts of Nuclear Facilities 3 Terms and Definitions For the purposes of this document, the terms and definitions given in GB/T 12726.1-2013 apply.
Contents of GB/T 12726.2-2013
Foreword II Introduction IV 1 Scope 2 Normative References 3 Terms and Definitions 4 Design Principles 4.1 General 4.2 Basic requirements related to functions 4.3 Sampling assembly 5 Functional Testing 5.1 General 5.2 Reference sources 5.3 Performance characteristics : response to other radioactive gases or particles 5.4 Air circuit performance test Table 1 Standards of SAC/TC 30/SC 2/SC 3 V Table 2 Additional Tests to Complement the General Tests Required in GB/T 12726.1-2013
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 12726.2-2013, GB 12726.2-2013, GBT 12726.2-2013, GB/T12726.2-2013, GB/T 12726.2, GB/T12726.2, GB12726.2-2013, GB 12726.2, GB12726.2, GBT12726.2-2013, GBT 12726.2, GBT12726.2