GB/T 15544.1-2013   Short-circuit Current Calculation in Three-phase a.c. Systems - Part 1: Calculation of Currents (English Version)
Standard No.: GB/T 15544.1-2013 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 22000 words Translation Price(USD):400.0 remind me the price change

Email:

Implemented on:2014-8-1 Delivery: via email in 1 business day

→ → →

,2023-10-1,2014-8-1,14113818257955BD520F256426415
Standard No.: GB/T 15544.1-2013
English Name: Short-circuit Current Calculation in Three-phase a.c. Systems - Part 1: Calculation of Currents
Chinese Name: 三相交流系统短路电流计算 第1部分:电流计算
Chinese Classification: F20    
Professional Classification: GB    National Standard
ICS Classification: 29.240.20 29.240.20    Power transmission and distribution lines 29.240.20
Source Content Issued by: AQSIQ;SAC
Issued on: 2013-12-17
Implemented on: 2014-8-1
Status: superseded
Superseded by:GB/T 15544.1-2023 Short-circuit current calculation in three-phase a.c. systems―Part 1:Calculation of currents
Superseded on:2023-10-1
Superseding:GB/T 15544-1995 Short - Circuit current calculation in three - Phase a.c.systems
Target Language: English
File Format: PDF
Word Count: 22000 words
Translation Price(USD): 400.0
Delivery: via email in 1 business day
1 General 1.1 Scope This part of GB/T 15544 is applicable to the calculation of short-circuit currents in low- or high-voltage three-phase a.c. systems operating at a nominal frequency of 50Hz or 60Hz. Systems at nominal voltages of 550 kV and above with long transmission lines need special consideration. This part establishes a general, practicable and concise procedure leading to results, which are generally of acceptable accuracy. This does not exclude the use of special methods, for example the superposition method, if they give at least the same precision. The superposition method gives the short-circuit current related to the one load flow presupposed. This method, therefore, does not necessarily lead to the maximum short-circuit current. This part deals with the short-circuit types, including balanced or unbalanced short circuits. In case of an accidental or intentional conductive path between one line conductor and local earth, the following two cases must be clearly distinguished with regard to their different physical properties and effects (resulting in different requirements for their calculation): - line-to-earth short circuit, occurring in a solidly earthed neutral system or an impedance earthed neutral system; - a single line-to-earth fault, occurring in an isolated neutral earthed system or a resonance earthed neutral system. This fault is beyond the scope of, and is therefore not dealt with in, this part. For currents during two separate simultaneous single-phase line-to-earth short circuits in an isolated neutral system or a resonance earthed neutral system, see IEC 60909-3. Short-circuit currents and short-circuit impedances may also be determined by system tests, by measurement on a network analyzer, or with a digital computer. In existing low-voltage systems it is possible to determine the short-circuit impedance on the basis of measurements at the location of the prospective short circuit considered. The calculation of the short-circuit impedance is in general based on the rated data of the electrical equipment and the topological arrangement of the system and has the advantage of being possible both for existing systems and for systems at the planning stage. In general, two short-circuit currents, which differ in their magnitude, are to be calculated: - the maximum short-circuit current which determines the capacity or rating of electrical equipment; and - the minimum short-circuit current which can be a basis, for example, for the selection of fuses, for the setting of protective devices, and for checking the run-up of motors. Note: the current in a three-phase short circuit is assumed to be made simultaneously in all poles. Investigations of non-simultaneous short circuits, which may lead to higher aperiodic components of short-circuit current, are beyond the scope of this part. This part does not cover short-circuit currents deliberately created under controlled conditions (short-circuit testing stations). This part does not deal with the calculation of short-circuit currents in installations on board ships and aeroplanes. 1.2 Normative References
Foreword I Introduction III 1 General 1.1 Scope 1.2 Normative References 1.3 Terms and Definitions 1.4 Symbols, Superscripts and Subscripts 2 Characteristics of Short-circuit Currents: Calculating Method 2.1 General 2.2 Calculation Assumptions 2.3 Method of Calculation 2.4 Maximum Short-circuit Currents 2.5 Minimum Short-circuit Currents 3 Short-circuit Impedances of Electrical Equipment 3.1 General 3.2 Network Feeders 3.3 Transformers 3.4 Overhead Lines and Cables 3.5 Short-circuit Limiting Reactors 3.6 Synchronous Machines 3.7 Power Station Unit 3.8 Asynchronous Motors 3.9 Static Converter-fed Drives 3.10 Capacitors and Non-rotating Loads 4 Calculation of Short-circuit Currents 4.1 General 4.2 Initial Symmetrical Short-circuit Current I′′k 4.3 Peak Short-circuit Current ip 4.4 DC component of the Short-circuit Current id.c. 4.5 Symmetrical Short-circuit Breaking Current Ib 4.6 Steady-state Short-circuit Current Ik 4.7 Terminal Short Circuit of Asynchronous Motors 4.8 Joule Integral and Thermal Equivalent Short-circuit Current Annex A (Normative) Equations for the Calculation of the Factors m and n
GB/T 15544.1-2013 is referred in:
*DL/T 593-2016 Common Specifications for High-voltage Switchgear and Controlgear Standards
Code of China
Standard
GB/T 15544.1-2013  Short-circuit Current Calculation in Three-phase a.c. Systems - Part 1: Calculation of Currents (English Version)
Standard No.GB/T 15544.1-2013
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count22000 words
Price(USD)400.0
Implemented on2014-8-1
Deliveryvia email in 1 business day
Detail of GB/T 15544.1-2013
Standard No.
GB/T 15544.1-2013
English Name
Short-circuit Current Calculation in Three-phase a.c. Systems - Part 1: Calculation of Currents
Chinese Name
三相交流系统短路电流计算 第1部分:电流计算
Chinese Classification
F20
Professional Classification
GB
ICS Classification
Issued by
AQSIQ;SAC
Issued on
2013-12-17
Implemented on
2014-8-1
Status
superseded
Superseded by
GB/T 15544.1-2023 Short-circuit current calculation in three-phase a.c. systems―Part 1:Calculation of currents
Superseded on
2023-10-1
Abolished on
Superseding
GB/T 15544-1995 Short - Circuit current calculation in three - Phase a.c.systems
Language
English
File Format
PDF
Word Count
22000 words
Price(USD)
400.0
Keywords
GB/T 15544.1-2013, GB 15544.1-2013, GBT 15544.1-2013, GB/T15544.1-2013, GB/T 15544.1, GB/T15544.1, GB15544.1-2013, GB 15544.1, GB15544.1, GBT15544.1-2013, GBT 15544.1, GBT15544.1
Introduction of GB/T 15544.1-2013
1 General 1.1 Scope This part of GB/T 15544 is applicable to the calculation of short-circuit currents in low- or high-voltage three-phase a.c. systems operating at a nominal frequency of 50Hz or 60Hz. Systems at nominal voltages of 550 kV and above with long transmission lines need special consideration. This part establishes a general, practicable and concise procedure leading to results, which are generally of acceptable accuracy. This does not exclude the use of special methods, for example the superposition method, if they give at least the same precision. The superposition method gives the short-circuit current related to the one load flow presupposed. This method, therefore, does not necessarily lead to the maximum short-circuit current. This part deals with the short-circuit types, including balanced or unbalanced short circuits. In case of an accidental or intentional conductive path between one line conductor and local earth, the following two cases must be clearly distinguished with regard to their different physical properties and effects (resulting in different requirements for their calculation): - line-to-earth short circuit, occurring in a solidly earthed neutral system or an impedance earthed neutral system; - a single line-to-earth fault, occurring in an isolated neutral earthed system or a resonance earthed neutral system. This fault is beyond the scope of, and is therefore not dealt with in, this part. For currents during two separate simultaneous single-phase line-to-earth short circuits in an isolated neutral system or a resonance earthed neutral system, see IEC 60909-3. Short-circuit currents and short-circuit impedances may also be determined by system tests, by measurement on a network analyzer, or with a digital computer. In existing low-voltage systems it is possible to determine the short-circuit impedance on the basis of measurements at the location of the prospective short circuit considered. The calculation of the short-circuit impedance is in general based on the rated data of the electrical equipment and the topological arrangement of the system and has the advantage of being possible both for existing systems and for systems at the planning stage. In general, two short-circuit currents, which differ in their magnitude, are to be calculated: - the maximum short-circuit current which determines the capacity or rating of electrical equipment; and - the minimum short-circuit current which can be a basis, for example, for the selection of fuses, for the setting of protective devices, and for checking the run-up of motors. Note: the current in a three-phase short circuit is assumed to be made simultaneously in all poles. Investigations of non-simultaneous short circuits, which may lead to higher aperiodic components of short-circuit current, are beyond the scope of this part. This part does not cover short-circuit currents deliberately created under controlled conditions (short-circuit testing stations). This part does not deal with the calculation of short-circuit currents in installations on board ships and aeroplanes. 1.2 Normative References
Contents of GB/T 15544.1-2013
Foreword I Introduction III 1 General 1.1 Scope 1.2 Normative References 1.3 Terms and Definitions 1.4 Symbols, Superscripts and Subscripts 2 Characteristics of Short-circuit Currents: Calculating Method 2.1 General 2.2 Calculation Assumptions 2.3 Method of Calculation 2.4 Maximum Short-circuit Currents 2.5 Minimum Short-circuit Currents 3 Short-circuit Impedances of Electrical Equipment 3.1 General 3.2 Network Feeders 3.3 Transformers 3.4 Overhead Lines and Cables 3.5 Short-circuit Limiting Reactors 3.6 Synchronous Machines 3.7 Power Station Unit 3.8 Asynchronous Motors 3.9 Static Converter-fed Drives 3.10 Capacitors and Non-rotating Loads 4 Calculation of Short-circuit Currents 4.1 General 4.2 Initial Symmetrical Short-circuit Current I′′k 4.3 Peak Short-circuit Current ip 4.4 DC component of the Short-circuit Current id.c. 4.5 Symmetrical Short-circuit Breaking Current Ib 4.6 Steady-state Short-circuit Current Ik 4.7 Terminal Short Circuit of Asynchronous Motors 4.8 Joule Integral and Thermal Equivalent Short-circuit Current Annex A (Normative) Equations for the Calculation of the Factors m and n
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 15544.1-2013, GB 15544.1-2013, GBT 15544.1-2013, GB/T15544.1-2013, GB/T 15544.1, GB/T15544.1, GB15544.1-2013, GB 15544.1, GB15544.1, GBT15544.1-2013, GBT 15544.1, GBT15544.1