2025-12-5 10.1.6.65
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SD 211-1987
SD 211-1987   Technical Specification for FM Series Fan Mill (English Version)
Standard No.: SD 211-1987 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 2000 words Translation Price(USD):40.0 remind me the price change

Email:

Implemented on:1987-11-1 Delivery: via email in 1 business day

→ → →

,,1987-11-1,147029711756100026ed8ac3fc7f5ebe
Standard No.: SD 211-1987
English Name: Technical Specification for FM Series Fan Mill
Chinese Name: FM系列风扇磨煤机技术条件
Professional Classification: SD    Professional Standard - Hydropower
Source Content Issued by: Ministry of Water Resources and Power
Issued on: 1987-05-12
Implemented on: 1987-11-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 2000 words
Translation Price(USD): 40.0
Delivery: via email in 1 business day
This standard is applicable to FM series fan mill and prepared by reference to relevant materials of EVT Company of the Federal Germany. FM series fan mills are the pulverizing equipment for direct-firing pulverizing system of coal-fired boiler and are applicable to grinding lignite with the total moisture no larger than 40% and ash content no larger than 40% as well as other coals with equivalent coal quality characteristics. 1 Types and Basic Parameters 1.1 Model naming 1.2 Type Based on the requirements of coal fineness, the combination type of fan mill is divided into the following three kinds according to different separators equipped: a. Fan mill equipped with box type separator (see Figure 1). b. Fan mill equipped with double-channel inertial separator (see Figure 2). c. Fan mill equipped with Raymond type centrifugal separator (see Figure 3). Figure 1 1——Beater plate; 2——Pulverizing wheel; 3——Box type separator Figure 2 1——Beater plate; 2——Pulverizing wheel; 3——Double-channel inertial separator Figure 3 1——Beater plate; 2——Pulverizing wheel; 3——Raymond type centrifugal separator 1.3 Basic parameters Basic parameters of FM series fan mill (see Table 1). Table 1 Model Rated output t/h Ventilation rate m3/h Wind pressure Pa Rotate speed r/min Motor power kW FM160·290 FM210·270 FM220·400 FM275·480 FM275·590 FM275·760 FM318·644 FM340·760 FM340·880 FM380·1150 7.5 10 14 21 25 32 36 40 45 70 16000 21000 28000 39000 48000 62000 70000 78000 88000 135000 2150 2150 2450 2700 2700 2700 3190 3190 3190 2940 1000 750 750 600 600 600 500 500 500 420 200 280 360 450 560 710 800 900 1000 1600 Notes: ①Models listed in the table are basic models, the new models derived (if required) shall meet the technical requirements of this standard. ②Values in the column of rated output refer to the rated outputs of machine which grinds coals with the total moisture of 12%, ash content of dry basis less than 5%, Hardgrove grindability index of 60 and coal fineness R90 of 25% under design ventilation state. 2 Technical Requirements 2.1 Basic requirements 2.1.1 The product shall meet the requirements of this standard and be manufactured according to drawings and technical documents approved through established procedures. 2.1.2 The maximum output of the product shall reach 1.1 times the rated output. 2.1.3 Under continuous operation conditions, the temperature of main bearing and other bearings in the bearing box shall not be higher than 75℃ and 80℃ respectively. 2.1.4 Under normal operation, the noise value shall not exceed 85dB(A). 2.2 Operating conditions 2.2.1 The maximum particle size of fire coal entering the mill shall be in accordance with those specified in Table 2. Table 2 Model FM160·290 FM210·270 FM220·400 FM275·480 FM275·590 Maximum particle size (mm) 40 50 Model FM275·760 FM318·644 FM340-760 FM340-880 FM380·1150 Maximum particle size (mm) 50 2.2.3 The relative humidity of surrounding environment shall be not greater than 75%. 2.3 Requirements for main components and parts 2.3.1 The carbon steel castings shall meet those specified in GB 5676-85 Cast Carbon Steels for General Engineering Purposes. 2.3.2 The high manganese steel casting shall meet those specified in GB 5680-85 Technical Specification for High Manganese Steel Casting. 2.3.3 The plates and profiles used for steel structural members shall be in accordance with corresponding national standards and ministerial standards. 2.3.4 The weld joints of steel structural members, which may influence sealing of equipment, shall be subjected to leakage inspection and shall be free from leakage. 2.3.5 The front plate, rear plate and articulated beam parts of pulverizing wheel component shall be subjected to defect detection inspection after rough machining. The defect detection requirements shal be indicated in the drawing and they shall be free from defects which influence the strength or usage. 2.3.6 The taper tolerance between taper hole of rear plate parts on pulverizing wheel with taper section of matched main shaft parts shall be in accordance with the accuracy Grade 5 specified in JB 1-59 taper and angle tolerance. 2.3.7 Before and after installation of beater plate, the pulverizing wheels shall be subjected to static balancing test. The allowable unbalanced moment shall be indicated in the drawing. 2.3.8 The quick-wear parts shall be provided with interchangeability and be easy to change. 2.3.9 The bearing box shall be subjected to oil penetration test and shall be free from oil leakage and penetration. 2.3.10 The assembled components and parts must be qualified products after inspection, purchased parts and standard parts shall be provided with quality certificate. 2.4 Installation requirements 2.4.1 After installation, the parallelism between axis of main shaft with horizontal plane shall be 0.2‰ of the axial length. 2.4.2 The coaxiality of main shaft and two half-couplings between main motor shafts shall be in accordance with those specified in Table 3. 2.4.3 The pipeline for bearing cooling and lubricating system shall be free from oil leakage. Table 3 Speed of main shaft r/min Not greater than 1500 Not greater than 750 Not greater than 500 Coaxiality mm 0.08 0.10 0.15 3 Inspection Rules 3.1 Acceptance of components and parts manufacturing Each product shall be able to leave the factory after passing inspection of quality department of manufacturer, and shall be accompanied with product quality qualification technical documents. 3.2 Trial assembling and trial run Before leaving the factory, each product shall be subjected to complete machine trial assembling and no-load trial run and shall meet the following requirements: 3.2.1 The opening/closing of actuator shall be free from block and shall be well sealed after closure. 3.2.2 The no-load trial run shall last more than 8h.
1 Types and Basic Parameters 2 Technical Requirements 3 Inspection Rules 4 Marking, Packaging and Spare Parts Additional Explanation
Referred in SD 211-1987:
*T/CSEE 0001-2015 Specification of Polymer-housed Metal Oxide Surge Arresters with Series Gap for 1 000kV AC Power Transmission Lines
*T/CSEE 0002-2015 Guide for the Selection of High Voltage Lead Exit for 1 000kV Transformer and Reactor
*DGJ 08-9-2013 Codeforseismicdesignofbuildings
*GB/T 29601-2013 Stainless steel ware
*GB/T 32861-2016 Road vehicles―Location of electrical and pneumatic connections between towing vehicles and trailers
*GB/T 32860-2016 Road vehicles―Interchangeability of drawbar couplings
*JGJ 107-2016 Technical specification for mechanical splicing of steel reinforcing bars
*GB 51160-2016 Technical Specification for Fiber Reinforced Plastic Equipment and Pipeline Engineering
*GB/T 51167-2016 Code for acceptance of optical fiber submarine cable systems engineering
*GB/T 10297-2015 Test method for thermal conductivity of nonmetal solid materials―Hot-wire method
SD 211-1987 is referred in:
*YY 0271.1-2016 Dentistry—Water-based cements—Part 1:Powder/liquid acid-base cements
*YY 0649-2016 Electrical potential therapy equipment
*YY 0649-2016/XG1-2023 Electrical potential therapy equipment, includes Amendment 1
*HJ 808-2016 Technical guidelines for environmental impact assessment format and content of environmental impact reports for nuclear power plants
*YY/T 1480-2016 Test methods of performance for ultrasonic elasticity imaging equipment based on acoustic radiation force
*GB 1800-1979 Tolerance and Fitting - General Standard Tolerance and Fundamental Deviation
*T/CSEE 0002-2015 Guide for the Selection of High Voltage Lead Exit for 1 000kV Transformer and Reactor
*GB/T 32860-2016 Road vehicles―Interchangeability of drawbar couplings
*GB 51160-2016 Technical Specification for Fiber Reinforced Plastic Equipment and Pipeline Engineering
*GB/T 51167-2016 Code for acceptance of optical fiber submarine cable systems engineering
Code of China
Standard
SD 211-1987  Technical Specification for FM Series Fan Mill (English Version)
Standard No.SD 211-1987
Statusvalid
LanguageEnglish
File FormatPDF
Word Count2000 words
Price(USD)40.0
Implemented on1987-11-1
Deliveryvia email in 1 business day
Detail of SD 211-1987
Standard No.
SD 211-1987
English Name
Technical Specification for FM Series Fan Mill
Chinese Name
FM系列风扇磨煤机技术条件
Chinese Classification
Professional Classification
SD
ICS Classification
Issued by
Ministry of Water Resources and Power
Issued on
1987-05-12
Implemented on
1987-11-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
2000 words
Price(USD)
40.0
Keywords
SD 211-1987, SD/T 211-1987, SDT 211-1987, SD211-1987, SD 211, SD211, SD/T211-1987, SD/T 211, SD/T211, SDT211-1987, SDT 211, SDT211
Introduction of SD 211-1987
This standard is applicable to FM series fan mill and prepared by reference to relevant materials of EVT Company of the Federal Germany. FM series fan mills are the pulverizing equipment for direct-firing pulverizing system of coal-fired boiler and are applicable to grinding lignite with the total moisture no larger than 40% and ash content no larger than 40% as well as other coals with equivalent coal quality characteristics. 1 Types and Basic Parameters 1.1 Model naming 1.2 Type Based on the requirements of coal fineness, the combination type of fan mill is divided into the following three kinds according to different separators equipped: a. Fan mill equipped with box type separator (see Figure 1). b. Fan mill equipped with double-channel inertial separator (see Figure 2). c. Fan mill equipped with Raymond type centrifugal separator (see Figure 3). Figure 1 1——Beater plate; 2——Pulverizing wheel; 3——Box type separator Figure 2 1——Beater plate; 2——Pulverizing wheel; 3——Double-channel inertial separator Figure 3 1——Beater plate; 2——Pulverizing wheel; 3——Raymond type centrifugal separator 1.3 Basic parameters Basic parameters of FM series fan mill (see Table 1). Table 1 Model Rated output t/h Ventilation rate m3/h Wind pressure Pa Rotate speed r/min Motor power kW FM160·290 FM210·270 FM220·400 FM275·480 FM275·590 FM275·760 FM318·644 FM340·760 FM340·880 FM380·1150 7.5 10 14 21 25 32 36 40 45 70 16000 21000 28000 39000 48000 62000 70000 78000 88000 135000 2150 2150 2450 2700 2700 2700 3190 3190 3190 2940 1000 750 750 600 600 600 500 500 500 420 200 280 360 450 560 710 800 900 1000 1600 Notes: ①Models listed in the table are basic models, the new models derived (if required) shall meet the technical requirements of this standard. ②Values in the column of rated output refer to the rated outputs of machine which grinds coals with the total moisture of 12%, ash content of dry basis less than 5%, Hardgrove grindability index of 60 and coal fineness R90 of 25% under design ventilation state. 2 Technical Requirements 2.1 Basic requirements 2.1.1 The product shall meet the requirements of this standard and be manufactured according to drawings and technical documents approved through established procedures. 2.1.2 The maximum output of the product shall reach 1.1 times the rated output. 2.1.3 Under continuous operation conditions, the temperature of main bearing and other bearings in the bearing box shall not be higher than 75℃ and 80℃ respectively. 2.1.4 Under normal operation, the noise value shall not exceed 85dB(A). 2.2 Operating conditions 2.2.1 The maximum particle size of fire coal entering the mill shall be in accordance with those specified in Table 2. Table 2 Model FM160·290 FM210·270 FM220·400 FM275·480 FM275·590 Maximum particle size (mm) 40 50 Model FM275·760 FM318·644 FM340-760 FM340-880 FM380·1150 Maximum particle size (mm) 50 2.2.3 The relative humidity of surrounding environment shall be not greater than 75%. 2.3 Requirements for main components and parts 2.3.1 The carbon steel castings shall meet those specified in GB 5676-85 Cast Carbon Steels for General Engineering Purposes. 2.3.2 The high manganese steel casting shall meet those specified in GB 5680-85 Technical Specification for High Manganese Steel Casting. 2.3.3 The plates and profiles used for steel structural members shall be in accordance with corresponding national standards and ministerial standards. 2.3.4 The weld joints of steel structural members, which may influence sealing of equipment, shall be subjected to leakage inspection and shall be free from leakage. 2.3.5 The front plate, rear plate and articulated beam parts of pulverizing wheel component shall be subjected to defect detection inspection after rough machining. The defect detection requirements shal be indicated in the drawing and they shall be free from defects which influence the strength or usage. 2.3.6 The taper tolerance between taper hole of rear plate parts on pulverizing wheel with taper section of matched main shaft parts shall be in accordance with the accuracy Grade 5 specified in JB 1-59 taper and angle tolerance. 2.3.7 Before and after installation of beater plate, the pulverizing wheels shall be subjected to static balancing test. The allowable unbalanced moment shall be indicated in the drawing. 2.3.8 The quick-wear parts shall be provided with interchangeability and be easy to change. 2.3.9 The bearing box shall be subjected to oil penetration test and shall be free from oil leakage and penetration. 2.3.10 The assembled components and parts must be qualified products after inspection, purchased parts and standard parts shall be provided with quality certificate. 2.4 Installation requirements 2.4.1 After installation, the parallelism between axis of main shaft with horizontal plane shall be 0.2‰ of the axial length. 2.4.2 The coaxiality of main shaft and two half-couplings between main motor shafts shall be in accordance with those specified in Table 3. 2.4.3 The pipeline for bearing cooling and lubricating system shall be free from oil leakage. Table 3 Speed of main shaft r/min Not greater than 1500 Not greater than 750 Not greater than 500 Coaxiality mm 0.08 0.10 0.15 3 Inspection Rules 3.1 Acceptance of components and parts manufacturing Each product shall be able to leave the factory after passing inspection of quality department of manufacturer, and shall be accompanied with product quality qualification technical documents. 3.2 Trial assembling and trial run Before leaving the factory, each product shall be subjected to complete machine trial assembling and no-load trial run and shall meet the following requirements: 3.2.1 The opening/closing of actuator shall be free from block and shall be well sealed after closure. 3.2.2 The no-load trial run shall last more than 8h.
Contents of SD 211-1987
1 Types and Basic Parameters 2 Technical Requirements 3 Inspection Rules 4 Marking, Packaging and Spare Parts Additional Explanation
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SD 211-1987, SD/T 211-1987, SDT 211-1987, SD211-1987, SD 211, SD211, SD/T211-1987, SD/T 211, SD/T211, SDT211-1987, SDT 211, SDT211